home / openregs / ig_reports

ig_reports: 147-million-warehouse-facility-kandahar-airfield-construction-delays-prevented-facility-0

This data as json

report_id title date_issued report_number report_type agency_reviewed submitting_oig location description num_recommendations questioned_costs funds_for_better_use pdf_url detail_url
147-million-warehouse-facility-kandahar-airfield-construction-delays-prevented-facility-0 $14.7 Million Warehouse Facility at Kandahar Airfield: Construction Delays Prevented the Facility from Being Used as Intended 2015-07-15 SIGAR-15-74-IP Inspection / Evaluation   Special Inspector General for Afghanistan Reconstruction Agency-Wide   0 0 0 https://www.oversight.gov/sites/default/files/documents/reports/2021-08/SIGAR-15-74-IP.pdf https://www.oversight.gov/reports/147-million-warehouse-facility-kandahar-airfield-construction-delays-prevented-facility-0

Links from other tables

  • 0 rows from report_id in ig_recommendations
Powered by Datasette · Queries took 0.773ms