spending_awards
Data license: Public Domain (U.S. Government data) · Data source: Federal Register API & Regulations.gov API
75,513 rows where agency = "National Aeronautics and Space Administration" sorted by award_amount descending
This data as json, CSV (advanced)
fiscal_year 10
agency 1
- National Aeronautics and Space Administration · 75,513 ✖
| generated_internal_id | award_id | agency | sub_agency | award_category | award_type | recipient_name | recipient_name_normalized | recipient_uei | recipient_duns | recipient_id | recipient_location_state | award_amount ▲ | total_outlays | description | start_date | end_date | fiscal_year | state_code | cfda_number | naics_code | naics_description | last_modified |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| CONT_AWD_NAS1510000_8000_-NONE-_-NONE- | NAS1510000 | National Aeronautics and Space Administration | National Aeronautics and Space Administration | contracts | DEFINITIVE CONTRACT | THE BOEING COMPANY | THE BOEING COMPANY | HLWWEH2CCXW5 | 690fafd3-ecd8-1228-92a0-07aa28dd1ee2-C | 22653589199.84 | 2714678720.61 | INTERNATIONAL SPACE STATION | 1993-11-15 | 2031-09-30 | 2026 | TX | 2026-09-29 16:19:05 | |||||
| CONT_AWD_NNJ06TA25C_8000_-NONE-_-NONE- | NNJ06TA25C | National Aeronautics and Space Administration | National Aeronautics and Space Administration | contracts | DEFINITIVE CONTRACT | LOCKHEED MARTIN CORP | LOCKHEED MARTIN CORP | FYHNA5WC8XD7 | 6e7a895c-aa57-8600-2a8a-4e237f6213f6-C | 15578682243.1 | 3591661151.82 | TAS::80 0124::TAS DESIGN, DEVELOPMENT, TEST&EVALUATION OF PROJECT ORION | 2006-09-06 | 2027-04-15 | 2026 | CO | 2026-09-29 12:07:14 | |||||
| CONT_AWD_NNM07AB03C_8000_-NONE-_-NONE- | NNM07AB03C | National Aeronautics and Space Administration | National Aeronautics and Space Administration | contracts | DEFINITIVE CONTRACT | THE BOEING COMPANY | THE BOEING COMPANY | SML4NN2CT556 | 3632dc26-45b8-9d0e-1128-63e866708c8f-C | 10517828993.0 | 4477982618.16 | PROVIDE DEVELOPMENTAL HARDWARE AND TEST ARTICLES, AND MANUFACTURE AND ASSEMBLE ARES I UPPER STAGES. THE UPPER STAGE (US) ELEMENT IS AN INTEGRAL PART OF THE ARES I LAUNCH VEHICLE AND PROVIDES THE SECOND STAGE OF FLIGHT. THE US ELEMENT IS RESPONSIBLE FOR THE ROLL CONTROL DURING THE FIRST STAGE BURN AND SEPARATION; AND WILL PROVIDE THE GUIDANCE AND NAVIGATION, COMMAND AND DATA HANDLING, AND OTHER AVIONICS FUNCTIONS FOR THE ARES I DURING ALL PHASES OF THE ASCENT FLIGHT. THE US ELEMENT IS A NEW DESIGN THAT EMPHASIZES SAFETY, OPERABILITY, AND MINIMUM LIFE CYCLE COST. THE OVERALL DESIGN, DEVELOPMENT, TEST AND EVALUATION (DDT&E), PRODUCTION, AND SUSTAINING ENGINEERING EFFORTS INCLUDE ACTIVITIES PERFORMED BY THREE ORGANIZATIONS; THE NASA DESIGN TEAM (NDT), THE UPPER STAGE PRODUCTION CONTRACTOR (USPC) AND THE INSTRUMENT UNIT PRODUCTION CONTRACTOR (IUPC). FOR CLARITY, THE USPC WILL BE REFERRED TO AS THE CONTRACTOR THROUGHOUT THIS DOCUMENT. NASA IS RESPONSIBLE FOR THE INTEGRATION OF THE PRIMARY ELEMENTS OF THE ARES I LAUNCH VEHICLE INCLUDING: THE FIRST STAGE, US INCLUDING INSTRUMENT UNIT (IU), AND US ENGINE; AND WILL ALSO INTEGRATE THE ARES I LAUNCH VEHICLE AT THE LAUNCH SITE. NASA IS RESPONSIBLE FOR THE DDT&E, INCLUDING TECHNICAL AND PROGRAMMATIC INTEGRATION OF THE US SUBSYSTEMS AND GOVERNMENT-FURNISHED PROPERTY. NASA WILL LEAD THE EFFORT TO DEVELOP THE REQUIREMENTS AND SPECIFICATIONS OF THE US ELEMENT, THE DEVELOPMENT PLAN AND TESTING REQUIREMENTS, AND ALL DESIGN DOCUMENTATION, INITIAL MANUFACTURING AND ASSEMBLY PROCESS PLANNING, LOGISTICS PLANNING, AND OPERATIONS SUPPORT PLANNING. DEVELOPMENT, QUALIFICATION, AND ACCEPTANCE TESTING WILL BE CONDUCTED BY NASA AND THE CONTRACTOR TO SATISFY REQUIREMENTS AND FOR RISK MITIGATION. NASA IS RESPONSIBLE FOR THE OVERALL UPPER STAGE VERIFICATION AND VALIDATION PROCESS AND WILL REQUIRE SUPPORT FROM THE CONTRACTOR. THE CONTRACTOR IS RESPONSIBLE FOR THE MANUFACTURE AND ASSEMBLY OF THE UPPER STAGE TEST FLIGHT AND OPERATIONAL UPPER STAGE UNITS INCLUDING THE INSTALLATION OF UPPER… | 2007-09-01 | 2028-12-31 | 2026 | AL | 2026-09-04 13:00:25 | |||||
| CONT_AWD_NNJ06VA01C_8000_-NONE-_-NONE- | NNJ06VA01C | National Aeronautics and Space Administration | National Aeronautics and Space Administration | contracts | DEFINITIVE CONTRACT | UNITED SPACE ALLIANCE, LLC | UNITED SPACE ALLIANCE, LLC | HPLMZ7ZYAGM7 | 46c06c00-69ec-7dcc-8cce-7e81b3a11d55-C | 8520322214.0 | 0.0 | SPACE PROGRAM OPERATIONS CONTRACT (SPOC) | 2006-10-01 | 2013-09-30 | 2017 | TX | ||||||
| CONT_AWD_NAS1510110_8000_-NONE-_-NONE- | NAS1510110 | National Aeronautics and Space Administration | National Aeronautics and Space Administration | contracts | DEFINITIVE CONTRACT | RUSSIA SPACE AGENCY | RUSSIA SPACE AGENCY | YJL4YS8YMWV7 | e96a0742-d4f1-00f3-38ab-d91cb6d9892b-C | 4683777952.45 | 174393603.7 | JOINT US/RUSSIAN HUMAN SPACE FLIGHT ACTIVITIES | 1993-12-16 | 2028-12-31 | 2026 | 2026-09-01 11:43:56 | ||||||
| CONT_AWD_NNM07AA75C_8000_-NONE-_-NONE- | NNM07AA75C | National Aeronautics and Space Administration | National Aeronautics and Space Administration | contracts | DEFINITIVE CONTRACT | NORTHROP GRUMMAN SYSTEMS CORPORATION | NORTHROP GRUMMAN SYSTEMS CORPORATION | LRVQERN7YNH9 | 828ad15f-2b75-eb7a-ab63-b3f56dd45597-C | 4429530857.0 | 976951915.84 | FIRST DDT AND E, ARES I-X, AND FLIGHT TESTS. FIRST STAGE WILL BE A FIVE SEGMENT, SOLID ROCKET BOOSTER DERIVED FROM THE SPACE SHUTTLE PROGRAM (SSP) SOLID ROCKET BOOSTER (SRB)/REUSABLE SOLID ROCKET MOTOR (RSRM). THE CONTRACTOR SHALL FURNISH THE NECESSARY MANAGEMENT, ENGINEERING, LABOR, FACILITIES, TOOLS, EQUIPMENT, AND MATERIALS REQUIRED FOR FIRST STAGE DEVELOPMENT, QUALIFICATION, CERTIFICATION AND ACCEPTANCE PROGRAM. ACTIVITIES INCLUDE: REDESIGN AND TESTING OF THE MOTOR TO INCORPORATE THE FIFTH SEGMENT AND PRODUCTION OF FIVE FULL SCALE GROUND STATIC TEST MOTORS: TWO DEVELOPMENT MOTORS (DMS)-AND THREE QUALIFICATION MOTORS (QMS); STRUCTURAL TEST ARTICLE (STA), GROUND VIBRATION TEST MOTORS (GVTMS) AND OTHER DEVELOPMENT TESTING; REDESIGN OF THE AVIONICS, DECELERATION, SEPARATION, AND FLIGHT TERMINATION SYSTEM (FTS) SUBSYSTEMS; ARES I-X: SIMULATED ARES I OUTER MOLD LINE/MASS PROPERTIES USING MODIFIED SRB/RSRM; AND THREE FLIGHT TEST VEHICLES. TAS::80 0124::TAS | 2006-04-17 | 2026-12-31 | 2026 | UT | 2026-09-02 15:55:35 | |||||
| CONT_AWD_GSFC0200211DNAS502200_8000_-NONE-_-NONE- | GSFC0200211DNAS502200 | National Aeronautics and Space Administration | National Aeronautics and Space Administration | contracts | DEFINITIVE CONTRACT | NORTHROP GRUMMAN SYSTEMS CORPORATION | NORTHROP GRUMMAN SYSTEMS CORPORATION | VSBAFMDKTWL4 | c1d87c0c-1b5f-f2c8-c447-e001bb4cc08c-C | 4345585999.01 | 519338588.6 | THE JAMES WEBB SPACE TELESCOPE (JWST) PHASE 2 OBSERVATORY CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING THE SPACECRAFT, THE OPTICAL TELESCOPE ELEMENT (OTE), PORTIONS OF THE INTEGRATED SCIENCE INSTRUMENT MODULE (ISIM), OBSERVATORY AND SYSTEM INTEGRATION AND TEST (I&T), OBSERVATORY VERIFICATION, OBSERVATORY COMMISSIONING, ASSOCIATED SYSTEMS ENGINEERING, AND THE GROUND AND LAUNCH SUPPORT EQUIPMENT NECESSARY TO DEVELOP AND LAUNCH THE JWST OBSERVATORY. | 2003-10-01 | 2022-12-25 | 2024 | CA | ||||||
| CONT_AWD_NAS920000_8000_-NONE-_-NONE- | NAS920000 | National Aeronautics and Space Administration | National Aeronautics and Space Administration | contracts | DEFINITIVE CONTRACT | UNITED SPACE ALLIANCE, LLC | UNITED SPACE ALLIANCE, LLC | HPLMZ7ZYAGM7 | 46c06c00-69ec-7dcc-8cce-7e81b3a11d55-C | 3871424999.62 | SPACE FLIGHT OPERATIONS | 2004-10-01 | 2006-12-31 | 2017 | TX | |||||||
| CONT_AWD_NNK17MA01T_8000_NNK14MA74C_8000 | NNK17MA01T | National Aeronautics and Space Administration | National Aeronautics and Space Administration | contracts | DELIVERY ORDER | SPACE EXPLORATION TECHNOLOGIES CORP. | SPACE EXPLORATION TECHNOLOGIES CORP. | C6M7C2FLKER5 | 8a3a5525-3218-a488-db0e-4823241ceb90-C | 3549243793.0 | 2772879533.0 | IGF::OT::IGF THE COMMERCIAL CREW PROGRAM (CCP) COMMERCIAL CREW TRANSPORTATION CAPABILITY (CCTCAP) CONTRACT WILL PROVIDE COMPLETION OF THE DESIGN, DEVELOPMENT, TEST, EVALUATION, AND CERTIFICATION OF AN INTEGRATED CREW TRANSPORTATION SYSTEM (CTS) CAPABLE OF TRANSPORTING NASA CREW TO AND FROM THE ISS, IN ACCORDANCE WITH THE DESIGN REFERENCE MISSIONS AND NASA'S CERTIFICATION STANDARDS AND REQUIREMENTS. CERTIFICATION OF THE CTS WILL BE DETERMINED BY NASA. NASA PLANS TO ISSUE TASK ORDERS FOR POST CERTIFICATION MISSIONS (PCM) TO AND FROM ISS THAT INCLUDE GROUND, LAUNCH, LIFEBOAT, ON-ORBIT, RETURN AND RECOVERY OPERATIONS. THE MINIMUM QUANTITY OF MISSIONS TO BE ORDERED IS TWO (2) AND THE MAXIMUM POTENTIAL QUANTITY OF MISSIONS WHICH MAY BE ORDERED IS SIX (6). IN ADDITION, NASA MAY ISSUE TASK ORDERS FOR SPECIAL STUDIES USED FOR RISK REDUCTION AND OTHER PURPOSES RELATED TO THE CTS. NASA CERTIFICATION UNDER CLIN 001 IS COMPLETE WHEN THE CONTRACTOR'S CREW TRANSPORTATION SYSTEM (CTS) HAS MET NASA'S REQUIREMENTS FOR SAFELY TRANSPORTING CREW TO AND FROM THE INTERNATIONAL SPACE STATION (ISS) IN ACCORDANCE WITH DOCUMENTS IDENTIFIED IN SECTION C.1, SPECIFICATIONS/STATEMENT OF WORK. SUBCLINS 001A AND 001B, IDENTIFIED IN TABLE B.3,DDTE/CERTIFICATION SUBCLINS, ARE DELIVERY MILESTONES THAT REPRESENT COMPLETION OF REQUIRED WORK NECESSARY TO ACHIEVE NASA CERTIFICATION. DELIVERY PAYMENT FOR THE ISS DESIGN CERTIFICATION REVIEW (DCR) FOR THE CREWED FLIGHT TO THE ISS INCLUDES ALL WORK UNDER THIS CLIN THAT OCCURS FROM THE CONTRACT EFFECTIVE DATE THROUGH THE ISS DCR COMPLETION. THE DELIVERY PAYMENT FOR THE CERTIFICATION REVIEW (CR) WILL INCLUDE ALL WORK THAT OCCURS FROM THE ISS DCR DELIVERY DATE THROUGH THE END OF THE DDTE/CERTIFICATION CLIN 001. IN ACCORDANCE WITH CLAUSE C.1, SPECIFICATION/STATEMENT OF WORK, THE TASK ORDERING PROCEDURES AND OTHER TERMS AND CONDITIONS IN THE CONTRACT, THE CONTRACTING OFFICER MAY ISSUE POST CERTIFICATION MISSION (PCM) TASK ORDERS. THE CONTRACTOR SHALL USE THE MISSION PRICING RATES SHOWN IN TABLE B.4.1, … | 2016-12-30 | 2030-12-31 | 2026 | FL | 2026-09-21 07:46:11 | |||||
| CONT_AWD_NNM16AA02C_8000_-NONE-_-NONE- | NNM16AA02C | National Aeronautics and Space Administration | National Aeronautics and Space Administration | contracts | DEFINITIVE CONTRACT | AEROJET ROCKETDYNE OF DE, INC | AEROJET ROCKETDYNE OF DE, INC | JCZYYYQ7JGF5 | f87ea7aa-b645-2932-36c2-e89cb4e9a016-C | 3384867722.36 | 2434337246.01 | IGF::CT::IGF RS-25 PRODUCTION RESTART TO BE UNDERTAKEN BY THE CONTRACTOR IN SUPPORT OF PROVIDING SIX RS-25 ENGINES MODIFIED AS NECESSARY FOR THE TECHNICAL REQUIREMENTS UNDER THE SPACE LAUNCH SYSTEM, RECERTIFICATION OF PRODUCTION, IMPROVEMENTS IN MANUFACTURING, AND CERTIFICATION FOR FLIGHT PROGRAM. | 2015-11-01 | 2029-09-30 | 2026 | CA | 2026-09-25 15:04:50 | |||||
| CONT_AWD_80MSFC20C0034_8000_-NONE-_-NONE- | 80MSFC20C0034 | National Aeronautics and Space Administration | National Aeronautics and Space Administration | contracts | DEFINITIVE CONTRACT | SPACE EXPLORATION TECHNOLOGIES CORP. | SPACE EXPLORATION TECHNOLOGIES CORP. | C6M7C2FLKER5 | 8a3a5525-3218-a488-db0e-4823241ceb90-C | 3205729526.07 | 2839645547.07 | WORK REQUIRED FOR THE DESIGN, DEVELOPMENT, MANUFACTURE, TEST, LAUNCH, DEMONSTRATION, AND ENGINEERING SUPPORT OF THE HUMAN LANDING SYSTEM (HLS) INTEGRATED LANDER. | 2020-05-13 | 2027-12-06 | 2026 | CA | 2026-08-21 08:20:16 | |||||
| CONT_AWD_80NM0018F0615_8000_80NM0018D0004_8000 | 80NM0018F0615 | National Aeronautics and Space Administration | National Aeronautics and Space Administration | contracts | DELIVERY ORDER | CALIFORNIA INSTITUTE OF TECHNOLOGY | CALIFORNIA INSTITUTE OF TECHNOLOGY | YC1YP79BFD19 | 6e76fa33-2d96-c636-941c-bca1997db076-C | 2974478580.98 | 2458948527.78 | EUROPA CLIPPER PROJECT THE CONTRACT IS THE SPONSORING AGREEMENT BETWEEN THE NATIONAL AERONAUTICS AND SPACE ADMINISTRATION NASA AND THE CALIFORNIA INSTITUTE OF TECHNOLOGY-CONTRACTOR, A PRIVATE NONPROFIT EDUCATIONAL INSTITUTION, WHICH ESTABLISHES THE RELATIONSHIP FOR THE OPERATION OF THE FEDERALLY FUNDED RESEARCH AND DEVELOPMENT CENTER-FFRDC KNOWN AS THE JET PROPULSION LABORATORY. THE CONTRACTOR, JPL, IS REQUIRED TO PERFORM WORK THAT IS DESIGNATED IN TASK ORDERS ISSUED BY THE NASA MANAGEMENT OFFICE-NMO CONTRACTING OFFICERS. NASA-SPONSORED WORK: JPLS PRIMARY MISSION IS TO SUPPORT THE NASA SCIENCE MISSION DIRECTORATE-SMD IN CARRYING OUT THE SPECIFIC OBJECTIVES IDENTIFIED IN THE SMD SCIENCE PLAN. THE FOUR BROAD SCIENTIFIC AREAS ARE: EARTH SCIENCE, PLANETARY SCIENCE, HELIOPHYSICS, AND ASTROPHYSICS. IN PERFORMANCE OF THIS CONTRACT, JPL SHALL: 1. SUPPLY A BROAD BASE OF SCIENTIFIC AND TECHNICAL CAPABILITIES RELEVANT TO NASA PROGRAM AND PROJECT RESPONSIBILITIES AND ASSIGNMENTS. 2. FOSTER ITS UNIQUE RELATIONSHIP WITH A TOP-TIER UNIVERSITY TO FACILITATE THE INVOLVEMENT OF SCIENTISTS, ENGINEERS, AND STUDENTS FROM THE UNIVERSITY AND RESEARCH COMMUNITIES IN NASA MISSION AND IN SUPPORTING OTHER GOVERNMENT AGENCIES. 3. SUPPORT NASA IN ENABLING PROGRAM AND INSTITUTIONAL CAPABILITIES. 4. DEVELOP SPACECRAFT AND INSTRUMENTS THAT ARE SENT TO VARIOUS DESTINATIONS WITH OUR SOLAR SYSTEM, INCLUDING EARTH ORBIT, PLANETS, PLANETARY SATELLITES, ASTEROIDS, AND COMETS. THESE MISSIONS MAY BE ORBITERS, LANDERS, OR ROVERS, AND TYPICALLY INCLUDE CUTTING-EDGE TECHNOLOGIES REQUIRED TO MEET SCIENTIFIC REQUIREMENTS. 5. PERFORM PROJECT TASKS INVOLVING: I-AUTONOMOUS DEEP-SPACE, INNER-SPACE AND EARTH-ORBITING SPACECRAFT OR MAJOR SUBSYSTEMS, II-EXPERIMENTS, INSTRUMENTS, OR OTHER DEVICES WHICH MAY BE CARRIED AS PAYLOAD ON SPACECRAFTS IN MISSIONS MANAGED BY OTHERS, AND-OR III-GROUND-BASED SYSTEMS. 6. BEYOND ITS PRIMARY MISSION, JPL MAY PERFORM WORK FOR OTHER NASA MISSION DIRECTORATES OR OFFICES. 7. JPL IS ALSO RESPONSIBLE FOR THE OPERATION, RESEARCH, TE… | 2018-10-01 | 2028-09-30 | 2026 | CA | 2026-09-28 13:53:59 | |||||
| CONT_AWD_MSFC0199911DNAS800016_8000_-NONE-_-NONE- | MSFC0199911DNAS800016 | National Aeronautics and Space Administration | National Aeronautics and Space Administration | contracts | DEFINITIVE CONTRACT | LOCKHEED MARTIN CORP | LOCKHEED MARTIN CORP | VYGMKZA24SF1 | a3374bb6-88f5-88cf-3bdb-b4c6d825fd98-C | 2870112487.23 | PRODUCTION AND O&M FOR 35 EXTERNAL TANKS | 2000-10-27 | 2013-02-28 | 2026 | LA | |||||||
| CONT_AWD_80MSFC20C0052_8000_-NONE-_-NONE- | 80MSFC20C0052 | National Aeronautics and Space Administration | National Aeronautics and Space Administration | contracts | DEFINITIVE CONTRACT | THE BOEING COMPANY | THE BOEING COMPANY | SML4NN2CT556 | 3632dc26-45b8-9d0e-1128-63e866708c8f-C | 2753683081.0 | 2260862782.02 | SPACE LAUNCH SYSTEM (SLS) STAGES PRODUCTION AND EVOLUTION CONTRACT (SPEC) | 2019-10-16 | 2029-02-28 | 2026 | AL | 2026-09-18 12:52:38 | |||||
| CONT_AWD_KSC00199808DNAS1099001_8000_-NONE-_-NONE- | KSC00199808DNAS1099001 | National Aeronautics and Space Administration | National Aeronautics and Space Administration | contracts | DEFINITIVE CONTRACT | SPACE GATEWAY SUPPORT, LLC | SPACE GATEWAY SUPPORT, LLC | DTAUUYKHMA46 | f876dee2-e4b3-5d84-c79f-b94d3db569d9-C | 2546941704.5 | 0.0 | JOINT BASE OPERATIONS AND SUPPORT FOR KSC, CAPE CANAVERAL AIR FORCE STATION AND PATRICK AIR FORCE BASE (J-BOSC) | 1999-10-15 | 2009-03-31 | 2017 | FL | ||||||
| CONT_AWD_GSFC0198106DNAS526555_8000_-NONE-_-NONE- | GSFC0198106DNAS526555 | National Aeronautics and Space Administration | National Aeronautics and Space Administration | contracts | DEFINITIVE CONTRACT | ASSOCIATION OF UNIVERSITIES FOR RESEARCH IN ASTRONOMY, INC. | ASSOCIATION OF UNIVERSITIES FOR RESEARCH IN ASTRONOMY, INC. | W1NBN156CYF9 | bc396b9b-bdab-f7b7-b1a8-1409da07fdc0-C | 2533788480.0 | 511436960.47 | THE PRIMARY ACTIVITIES COVERED BY THIS EFFORT INCLUDE THE FINAL SERVICING MISSION AND SUBSEQUENT OPERATIONS THROUGH END-OF-MISSION. THESE ACTIVITIES INCLUDE: A. SCIENCE PROGRAM IMPLEMENTATION INCLUDING: MISSION PLANNING SUPPORT, SCIENCE PROGRAM DEFINITION SUPPORT, MANAGEMENT OF THE PROPOSAL SELECTION, TIME ALLOCATION, AND GRANT AWARD COMMITTEE PROCESSES, AND SCIENCE COMMUNITY OUTREACH. B. ROUTINE SCIENCE OPERATIONS INCLUDING: PROPOSAL GENERATION AND RECEIPT, OBSERVATION PLANNING AND SCHEDULING, UPDATING INSTRUMENT HANDBOOKS, OBSERVING AND USER SUPPORT, DATA PROCESSING AND PRODUCT GENERATION, ARCHIVAL AND DATA DISTRIBUTION SERVICES, CALIBRATION ASSISTANCE AND DATA ANALYSIS, ANOMALY INVESTIGATION SUPPORT, USER GRANT ADMINISTRATION, OBSERVER ASSISTANCE AND ENGINEERING OPERATIONS SUPPORT. C. GROUND SYSTEM SUSTAINING ENGINEERING INCLUDING: SCIENCE OPERATION SYSTEM MAINTENANCE, INFRASTRUCTURE ADMINISTRATION AND SUPPORT, AND DOCUMENTATION MAINTENANCE D. SERVICING MISSION SUPPORT INCLUDING: PREPARATION AND EXECUTION OF THE OBSERVATORY VERIFICATION PROGRAM, INSTRUMENT DEVELOPMENT SUPPORT, AND OPTICAL ALIGNMENT TESTING SUPPORT E. GENERATION OF PERFORMANCE, SCIENCE RETURN, AND OTHER PERTINENT INFORMATIONAL REPORTS TO THE HSTP F. ASTRONOMICAL COMMUNITY AND GENERAL PUBLIC/EDUCATIONAL OUTREACH G. SPECIAL PROJECTS INCLUDING ORIGINS FORUM AND INDEPENDENT RESEARCH THIS CONTRACT INCLUDES AN ADDITIONAL TWO-YEAR PERIOD AFTER THE END OF HST'S SCIENCE-MISSION. THIS EXTRA TIME FOLLOWING THE CESSATION OF SCIENTIFIC OBSERVATIONS IS FOR TWO YEARS OF FOLLOW-ON ARCHIVAL RESEARCH. DURING THE FINAL TWO YEARS OF THE CONTRACT, ARCHIVAL OPERATIONS AND MAINTENANCE, AN ARCHIVAL RESEARCH PROPOSAL SELECTION PROCESS AND ASSOCIATED GRANT ADMINISTRATION, AND A PUBLIC OUTREACH PROGRAM WILL CONTINUE. DATA ANALYSIS SOFTWARE WILL ALSO BE MAINTAINED BUT AT A LOWER LEVEL OF SUPPORT SUCH THAT ONLY MODEST ENHANCEMENTS MAY STILL BE MADE. CONTINUING SUPPORT WILL ALSO INCLUDE THE COORDINATION OF DATA ANALYSIS SOFTWARE THAT IS PRODUCED BY THE ASTRONOMICAL COMMUN… | 1987-09-15 | 2026-10-31 | 2026 | MD | 2026-09-08 15:56:54 | |||||
| CONT_AWD_MSFC0200205DNAS801140_8000_-NONE-_-NONE- | MSFC0200205DNAS801140 | National Aeronautics and Space Administration | National Aeronautics and Space Administration | contracts | DEFINITIVE CONTRACT | AEROJET ROCKETDYNE OF DE, INC | AEROJET ROCKETDYNE OF DE, INC | JCZYYYQ7JGF5 | f87ea7aa-b645-2932-36c2-e89cb4e9a016-C | 2264561937.05 | SPACE SHUTTLE ENG SUPPORT FOR FLIGHT SCH OF 30 FLI FLIGHTS EXTENDING FROM 1/1/02 THRU 12/31/06 | 2002-01-01 | 2013-09-30 | 2023 | CA | |||||||
| CONT_AWD_80MSFC23CA014_8000_-NONE-_-NONE- | 80MSFC23CA014 | National Aeronautics and Space Administration | National Aeronautics and Space Administration | contracts | DEFINITIVE CONTRACT | BLUE ORIGIN MANUFACTURING, LLC | BLUE ORIGIN MANUFACTURING, LLC | RAR2RMTVZYX3 | 1bc6570e-8b90-8bba-adc9-a6e5069bcfd3-C | 2192010424.8 | 1346450487.6 | RAPID DDT&E AND DEMONSTRATION OF S SUSTAINABLE HUMAN LANDING SYSTEM INTEGRATED LANDER. | 2023-05-18 | 2032-04-03 | 2026 | AL | 2026-09-22 16:38:46 | |||||
| CONT_AWD_NAS998100_8000_-NONE-_-NONE- | NAS998100 | National Aeronautics and Space Administration | National Aeronautics and Space Administration | contracts | DEFINITIVE CONTRACT | LOCKHEED MARTIN CORPORATION | LOCKHEED MARTIN CORPORATION | NB1ALNT2ZLN6 | e7e7753c-2918-38ce-7ea9-70f027b36e15-C | 2150327425.31 | 2323087.44 | CONSOLIDATED SPACE OPERATIONS CONTRACT PHASE 2. | 1998-09-25 | 2004-03-30 | 2024 | TX | ||||||
| CONT_AWD_NNK13MA14C_8000_-NONE-_-NONE- | NNK13MA14C | National Aeronautics and Space Administration | National Aeronautics and Space Administration | contracts | DEFINITIVE CONTRACT | AMENTUM TECHNOLOGY, INC. | AMENTUM TECHNOLOGY, INC. | H2RGSKWXKHQ5 | 435aa33d-8ca5-7631-ec18-85dbb07c6fa1-C | 2099373524.58 | 1138246605.19 | IGF::OT::IGF THE TEST AND OPERATIONS SUPPORT CONTRACT (TOSC) IS A COST-PLUS-AWARD-FEE CONTRACT WITH AN INDEFINITE DELIVERY INDEFINITE QUANTITY TASK ORDERING PROVISION. TOSC PROVIDES A PROCESSING CONTRACT FOR THE KENNEDY SPACE CENTER (KSC) SUPPORTING MULTIPLE CUSTOMERS. THE SCOPE OF THIS CONTRACT INCLUDES PROGRAM MANAGEMENT AND CONTROL; SAFETY AND MISSION ASSURANCE; INFORMATION MANAGEMENT; PROCESSING SUPPORT SYSTEMS AND INTEGRATION; FLIGHT HARDWARE PROCESSING; GROUND SYSTEMS OPERATIONS, MAINTENANCE AND SUSTAINING ENGINEERING; LOGISTICS AND SPACEPORT SERVICES. TOSC PROVIDES OVERALL MANAGEMENT AND IMPLEMENTATION OF GROUND SYSTEMS CAPABILITIES, FLIGHT HARDWARE PROCESSING AND LAUNCH OPERATIONS AT KSC IN FLORIDA. THESE TASKS WILL SUPPORT THE INTERNATIONAL SPACE STATION, GROUND SYSTEMS DEVELOPMENT AND OPERATIONS, AND THE SPACE LAUNCH SYSTEM, ORION MULTI-PURPOSE CREW VEHICLE AND LAUNCH SERVICES PROGRAMS. TOSC ALSO PROVIDES GROUND PROCESSING FOR LAUNCH VEHICLES, SPACECRAFT AND PAYLOADS IN SUPPORT OF EMERGING PROGRAMS, COMMERCIAL ENTITIES AND OTHER GOVERNMENT AGENCIES AS DESIGNATED BY THE GOVERNMENT. SERVICES INCLUDE ADVANCED PLANNING AND SPECIAL STUDIES; DEVELOPMENT OF DESIGNATED GROUND SYSTEMS; OPERATIONAL SUPPORT FOR DESIGN AND DEVELOPMENT OF FLIGHT HARDWARE AND GROUND SYSTEMS; SPACECRAFT, PAYLOAD, AND LAUNCH VEHICLE SERVICING AND PROCESSING; GROUND SYSTEMS SERVICES; AND LOGISTICS AND OTHER PROCESSING SUPPORT SERVICES. FLIGHT HARDWARE PROCESSING AND SERVICING ACTIVITIES INCLUDE ASSEMBLY, INTEGRATION, CHECKOUT, AND DEPOT-LEVEL MAINTENANCE AND REPAIR. LAUNCH VEHICLE AND SPACECRAFT OPERATIONS INCLUDE ADVANCED PLANNING, ELEMENT PROCESSING, INTEGRATION, TEST, LAUNCH AND RECOVERY SERVICES. GROUND SYSTEMS SERVICES INCLUDE OPERATIONS, MAINTENANCE AND VALIDATION OF ASSOCIATED GROUND SYSTEMS AND SUPPORT EQUIPMENT NECESSARY FOR HUMAN SPACE FLIGHT AND EXPLORATION. CONTRACT ACTIVITIES WILL BE PERFORMED IN THE MOST COST-EFFECTIVE AND EFFICIENT MANNER SUPPORTING THE GOVERNMENT S PRIORITIES FOR SAFETY, MISSION SUCCESS, CUSTOMER SATISFA… | 2013-03-01 | 2023-04-30 | 2025 | FL | ||||||
| CONT_AWD_NNM06AB13C_8000_-NONE-_-NONE- | NNM06AB13C | National Aeronautics and Space Administration | National Aeronautics and Space Administration | contracts | DEFINITIVE CONTRACT | AEROJET ROCKETDYNE OF DE, INC | AEROJET ROCKETDYNE OF DE, INC | JCZYYYQ7JGF5 | f87ea7aa-b645-2932-36c2-e89cb4e9a016-C | 2057069643.92 | 1110293.04 | LETTER CONTRACT TO INITIATE DDT&E AND LONG LEAD PURCHASES | 2006-06-02 | 2020-09-30 | 2024 | CA | ||||||
| CONT_AWD_NNG09HR00C_8000_-NONE-_-NONE- | NNG09HR00C | National Aeronautics and Space Administration | National Aeronautics and Space Administration | contracts | DEFINITIVE CONTRACT | LOCKHEED MARTIN CORP | LOCKHEED MARTIN CORP | FYHNA5WC8XD7 | 6e7a895c-aa57-8600-2a8a-4e237f6213f6-C | 2032829134.57 | 306179186.23 | THE GOVERNMENT IS PROCURING THE NEXT-GENERATION GEOSTATIONARY OPERATIONAL ENVIRONMENTAL SATELLITES (GOES) SERIES TO CONTINUE ITS MISSION THROUGH NEW REQUIREMENTS SPECIFIED IN THE GOES-R LEVEL I REQUIREMENTS DOCUMENT AND MISSION REQUIREMENTS DOCUMENT (MRD). THE FIRST SATELLITE OF THIS NEW SERIES, DESIGNATED AS GOES-R, WILL PROVIDE THE FIRST MAJOR IMPROVEMENT IN INSTRUMENT TECHNOLOGY SINCE GOES-I LAUNCHED IN 1994. THE GOES-R SERIES WILL INTRODUCE OTHER NEW TECHNOLOGIES IN BOTH THE SPACE AND GROUND SEGMENTS. THESE ADVANCES WILL IMPROVE THE NATION'S ABILITY TO MONITOR AND FORECAST WEATHER AND ENVIRONMENTAL PHENOMENA WITH A SIGNIFICANT INCREASE IN THE NUMBER OF PRODUCTS. ONE OF NOAA'S PRINCIPAL MISSIONS IS TO PROVIDE FORECASTS AND WARNINGS FOR THE UNITED STATES, ITS TERRITORIES, ADJACENT WATERS AND OCEAN AREA FOR THE PROTECTION OF LIFE AND PROPERTY AND ENHANCEMENT OF THE NATIONAL ECONOMY. THIS MISSION REQUIRES THE CAPABILITY TO ACQUIRE, PROCESS, AND DISSEMINATE ENVIRONMENTAL DATA ON AN EXTENSIVE SPATIAL RANGE (GLOBAL, REGIONAL AND LOCAL) ON A VARIETY OF TIME SCALES. THESE DATA INCLUDE, BUT ARE NOT LIMITED TO: GLOBAL IMAGERY; CLOUD AND PRECIPITATION PARAMETERS; ATMOSPHERIC PROFILES OF TEMPERATURE, MOISTURE, WINDS, AEROSOLS, AND OZONE; SURFACE CONDITIONS CONCERNING ICE, SNOW AND VEGETATION; OCEAN PARAMETERS AND SEA-SURFACE TEMPERATURE; AND SOLAR AND IN-SITU SPACE ENVIRONMENT CONDITIONS. THE STATEMENT OF WORK (SOW) DEFINES THOSE TASKS TO DESIGN, ANALYZE, VALIDATE, DEVELOP, FABRICATE, ASSEMBLE, INTEGRATE, TEST, VERIFY, EVALUATE, DELIVER GOES-R SERIES SATELLITES AND SUPPORT LAUNCH AND POST LAUNCH, SUPPLY AND MAINTAIN THE GROUND SUPPORT EQUIPMENT (GSE), AND SUPPORT THE NOAA SATELLITE OPERATIONS CONTROL CENTER (SOCC). THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, FACILITIES, AND OTHER RESOURCES TO DESIGN, VALIDATE, FABRICATE, ASSEMBLE, INTEGRATE, TEST, VERIFY, AND DELIVER GOES-R SERIES SATELLITES AND PROVIDE PRE-LAUNCH, LAUNCH, AND POST-LAUNCH SUPPORT AND TRAINING UNDER THE BASIC CONTRACT, AND OPTIONS WHEN EXERCI… | 2008-12-04 | 2039-04-30 | 2026 | CO | 2026-07-27 15:48:00 | |||||
| CONT_AWD_80MSFC18C0011_8000_-NONE-_-NONE- | 80MSFC18C0011 | National Aeronautics and Space Administration | National Aeronautics and Space Administration | contracts | DEFINITIVE CONTRACT | AMENTUM TECHNOLOGY, INC. | AMENTUM TECHNOLOGY, INC. | H2RGSKWXKHQ5 | 435aa33d-8ca5-7631-ec18-85dbb07c6fa1-C | 2001993510.48 | 1573657572.66 | ENGINEERING SERVICES AND SCIENCE CAPABILITY AUGMENTATION (ESSCA) | 2017-12-01 | 2027-05-31 | 2026 | AL | 2026-09-18 13:54:44 | |||||
| CONT_AWD_NNH15CN76C_8000_-NONE-_-NONE- | NNH15CN76C | National Aeronautics and Space Administration | National Aeronautics and Space Administration | contracts | DEFINITIVE CONTRACT | NORTHROP GRUMMAN SYSTEMS CORPORATION | NORTHROP GRUMMAN SYSTEMS CORPORATION | Q11ZHUFBW741 | d6601efc-adc3-1030-5904-be323dc49433-C | 1780030031.31 | 1553985989.76 | IGF::OT::IGF NEXTSTEP NRA AWARD. THIS NEXTSTEP CONTRACT BUILDS UPON THE SUCCESS OF COMMERCIAL ORBITAL TRANSPORTATION SERVICES SPACE ACT AGREEMENT DEVELOPMENT PROGRAM AND AN EXISTING INTERNATIONAL SPACE STATION (ISS) COMMERCIAL RESUPPLY SERVICES (CRS) CONTRACT. ORBITAL HAS SUCCESSFULLY TRANSITIONED FROM COTS TO THE CRS PROGRAM, FLYING THREE VERY SUCCESSFUL PRESSURIZED CARGO RESUPPLY MISSIONS TO THE ISS, USING THE CYGNUS SPACECRAFT. ORBITAL ALSO SUCCESSFULLY DEVELOPED SPACECRAFT FOR SOLAR SYSTEM EXPLORATION TO INCLUDE THE CURRENTLY OPERATIONAL DAWN MISSION. THIS MISSION WAS LAUNCHED IN SEPTEMBER 2007, COMPLETED ITS RENDEZVOUS MISSION AT VESTA IN JULY 2012 AND IS EN ROUTE TO CERES IN EARLY 2015. WITH SPACE AGENCY BUDGETS CONTINUING TO BE TIGHT, EXPLORATION PLANS NEED TO EMPHASIZE EVOLUTION OF EXISTING SYSTEMS, WHERE COST AND SCHEDULE IS BETTER CONTROLLED, AND DEVELOPMENT RISK REDUCED. SPECIFICALLY, ELEMENTS OF THE CURRENT ISS, INCLUDING CYGNUS, CAN BE EVOLVED TO SUPPORT MORE DISTANT SPACE DESTINATIONS. TO SUPPORT THESE ENDEAVORS, ORBITAL CONTRIBUTES TO THE DEVELOPMENT AND PRODUCT IMPROVEMENT OF CYGNUS AND TO NEXTSTEP ACTIVITIES AND HAVE INVESTED IN THE COTS CRS PUBLIC-PRIVATE PARTNERSHIP ENDEAVOR. ORBITAL'S EXPLORATION AUGMENTATION MODULE (BAM) ARCHITECTURE USES A MODULAR, BUILDING BLOCK APPROACH THAT LEVERAGES THE CYGNUS SPACECRAFT TO EXPAND CISLUNAR AND LONG DURATION DEEP SPACE TRANSIT HABITATION CAPABILITIES AND TECHNOLOGIES CRITICAL TO NASAS LONG-TERM EXPLORATION GOALS. ORBITALS ARCHITECTURE CONCEPT BLENDS IN-PRODUCTION HARDWARE WITH ADAPTATION, EVOLUTION, PLANNING, AND FORWARD THINKING. CYGNUS WILL SERVE AS A MODULAR HABITAT AND TEST PLATFORM FOR QUALIFYING TECHNOLOGIES IN A DISTANT RETROGRADE ORBIT (DRO) OR IN A LOW EARTH ORBIT (LEO), EITHER WHILE ATTACHED TO THE ISS OR AS A FREE-FLYER. USING THE EXISTING, OPERATIONAL CYGNUS TO PERFORM THESE MISSIONS HAS THE ADVANTAGE OF DECREASING OVERALL DEVELOPMENT TIME AND COSTS, AND FREEING UP RESOURCES THAT WOULD BE SPENT ON DEVELOPING A SPACECRAFT TO FOCUS ON CULTIV… | 2015-09-03 | 2029-05-31 | 2026 | VA | 2026-09-23 17:30:41 | |||||
| CONT_AWD_NMO710846_8000_NAS703001_8000 | NMO710846 | National Aeronautics and Space Administration | National Aeronautics and Space Administration | contracts | DELIVERY ORDER | CALIFORNIA INSTITUTE OF TECHNOLOGY | CALIFORNIA INSTITUTE OF TECHNOLOGY | YC1YP79BFD19 | 6e76fa33-2d96-c636-941c-bca1997db076-C | 1725568202.42 | 897091.99 | MARS SCIENCE LABORATORY | 2003-09-30 | 2012-09-30 | 2021 | CA | ||||||
| CONT_AWD_NAS503127_8000_-NONE-_-NONE- | NAS503127 | National Aeronautics and Space Administration | National Aeronautics and Space Administration | contracts | DEFINITIVE CONTRACT | ASSOCIATION OF UNIVERSITIES FOR RESEARCH IN ASTRONOMY, INC. | ASSOCIATION OF UNIVERSITIES FOR RESEARCH IN ASTRONOMY, INC. | W1NBN156CYF9 | bc396b9b-bdab-f7b7-b1a8-1409da07fdc0-C | 1616643260.86 | 817918882.17 | THE PRIMARY ACTIVITIES COVERED BY THIS EFFORT SPAN THE MAJOR PHASES OF THE MISSION BEGINNING WITH FORMULATION THROUGH DEVELOPMENT AND TESTING, AND ENDING ONE YEAR AFTER LAUNCH WITH THE INITIATION OF THE JAMES WEBB SPACE TELESCOPE (JWST) SCIENCE PROGRAM. THESE MAJOR ACTIVITIES ARE SEPARATED INTO THE BASELINE PROGRAM AND SPECIAL STUDIES. THE BASELINE PROGRAM INCLUDES: A. MISSION REQUIREMENTS ANALYSIS AND OBSERVATORY/MISSION DESIGN SUPPORT INCLUDING: TRADESTUDY GENERATION, SCIENCE AND OPERATIONS IMPACT ANALYSIS, SCIENCE SYSTEMS ENGINEERING SUPPORT, AND DESIGN REFERENCE MISSION ANALYSIS. B. GROUND SEGMENT DEVELOPMENT, TESTING, MAINTENANCE AND OPERATIONS INCLUDING: OPERATIONS SUPPORT OF SI, FGS, ISIM, AND OBSERVATORY INTEGRATION AND TEST (I&T), MISSION SIMULATIONS, AND DOCUMENTATION MAINTENANCE, AS WELL AS LOW COST OPERATIONS CONCEPTS. C. SCIENCE PROGRAM IMPLEMENTATION INCLUDING: MISSION PLANNING SUPPORT, SCIENCE PROGRAM DEFINITION SUPPORT, PROPOSAL MANAGEMENT AND USER GRANT ADMINISTRATION, OBSERVER ASSISTANCE, SCIENCE COMMUNITY OUTREACH, AND STAFF RESEARCH. D. COMMISSIONING PERIOD AND ROUTINE SCIENCE OPERATIONS INCLUDING: PROPOSAL GENERATION, OBSERVATION PLANNING AND SCHEDULING, OBSERVING AND USER SUPPORT, DATA PROCESSING AND PRODUCT GENERATION, ARCHIVAL AND DATA DISTRIBUTION SERVICES, CALIBRATION ASSISTANCE AND DATA ANALYSIS, AND ENGINEERING OPERATIONS SUPPORT. E. FLIGHT OPERATIONS INCLUDING: SUBSYSTEM (INCLUDING INSTRUMENTS) HEALTH AND SAFETY MONITORING, COMMAND GENERATION AND UPLOAD, SCHEDULE EXECUTION ASSURANCE, TRENDING, AND ANOMALY INVESTIGATION. F. SUPPORT AND EXECUTION OF THE ON-ORBIT COMMISSIONING PROGRAM. G. GENERATION OF PERFORMANCE, SCIENCE RETURN, AND OTHER PERTINENT INFORMATIONAL REPORTS TO THE JWST PROJECT. H. ASTRONOMICAL COMMUNITY AND GENERAL PUBLIC/EDUCATIONAL OUTREACH. EXAMPLES OF SPECIAL PROJECT ACTIVITIES MAY INCLUDE: A. FOLLOW-ON MISSION STUDIES. B. ENGINEERING NECESSARY TO RESPOND TO NEW JWST PROJECT TASKS. | 2003-10-01 | 2027-06-25 | 2026 | MD | 2026-09-23 14:38:26 | |||||
| CONT_AWD_80NM0021F0008_8000_80NM0018D0004_8000 | 80NM0021F0008 | National Aeronautics and Space Administration | National Aeronautics and Space Administration | contracts | DELIVERY ORDER | CALIFORNIA INSTITUTE OF TECHNOLOGY | CALIFORNIA INSTITUTE OF TECHNOLOGY | YC1YP79BFD19 | 6e76fa33-2d96-c636-941c-bca1997db076-C | 1608374527.0 | 1570896383.47 | MARS SAMPLE RETURN (MSR) PROGRAM - PHASE A 40-108270 | 2020-12-17 | 2028-09-24 | 2026 | CA | 2026-09-01 18:56:09 | |||||
| CONT_AWD_80NM0018F0850_8000_80NM0018D0004_8000 | 80NM0018F0850 | National Aeronautics and Space Administration | National Aeronautics and Space Administration | contracts | DELIVERY ORDER | CALIFORNIA INSTITUTE OF TECHNOLOGY | CALIFORNIA INSTITUTE OF TECHNOLOGY | YC1YP79BFD19 | 6e76fa33-2d96-c636-941c-bca1997db076-C | 1574972192.58 | 1231697945.25 | DEEP SPACE NETWORK (DSN) THE CONTRACT IS THE SPONSORING AGREEMENT BETWEEN THE NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) AND THE CALIFORNIA INSTITUTE OF TECHNOLOGY (CONTRACTOR), A PRIVATE NONPROFIT EDUCATIONAL INSTITUTION, WHICH ESTABLISHES THE RELATIONSHIP FOR THE OPERATION OF THE FEDERALLY FUNDED RESEARCH AND DEVELOPMENT CENTER (FFRDC) KNOWN AS THE JET PROPULSION LABORATORY. THE CONTRACTOR, JPL, IS REQUIRED TO PERFORM WORK THAT IS DESIGNATED IN TASK ORDERS ISSUED BY THE NASA MANAGEMENT OFFICE (NMO) CONTRACTING OFFICERS. NASA - SPONSORED WORK: JPL'S PRIMARY MISSION IS TO SUPPORT THE NASA SCIENCE MISSION DIRECTORATE (SMD) IN CARRYING OUT THE SPECIFIC OBJECTIVES IDENTIFIED IN THE SMD SCIENCE PLAN. THE FOUR BROAD SCIENTIFIC AREAS ARE: EARTH SCIENCE, PLANETARY SCIENCE, HELIOPHYSICS, AND ASTROPHYSICS. IN PERFORMANCE OF THIS CONTRACT, JPL SHALL: 1) SUPPLY A BROAD BASE OF SCIENTIFIC AND TECHNICAL CAPABILITIES RELEVANT TO NASA PROGRAM AND PROJECT RESPONSIBILITIES AND ASSIGNMENTS. 2) FOSTER ITS UNIQUE RELATIONSHIP WITH A TOP-TIER UNIVERSITY TO FACILITATE THE INVOLVEMENT OF SCIENTISTS, ENGINEERS, AND STUDENTS FROM THE UNIVERSITY AND RESEARCH COMMUNITIES IN NASA MISSION AND IN SUPPORTING OTHER GOVERNMENT AGENCIES. 3) SUPPORT NASA IN ENABLING PROGRAM AND INSTITUTIONAL CAPABILITIES. 4) DEVELOP SPACECRAFT AND INSTRUMENTS THAT ARE SENT TO VARIOUS DESTINATIONS WITH OUR SOLAR SYSTEM, INCLUDING EARTH ORBIT, PLANETS, PLANETARY SATELLITES, ASTEROIDS, AND COMETS. THESE MISSIONS MAY BE ORBITERS, LANDERS, OR ROVERS, AND TYPICALLY INCLUDE CUTTING-EDGE TECHNOLOGIES REQUIRED TO MEET SCIENTIFIC REQUIREMENTS. 5) PERFORM PROJECT TASKS INVOLVING: (I) AUTONOMOUS DEEP-SPACE, INNER-SPACE AND EARTH-ORBITING SPACECRAFT OR MAJOR SUBSYSTEMS, (II) EXPERIMENTS, INSTRUMENTS, OR OTHER DEVICES WHICH MAY BE CARRIED AS PAYLOAD ON SPACECRAFTS IN MISSIONS MANAGED BY OTHERS, AND/OR (III) GROUND-BASED SYSTEMS. 6) BEYOND ITS PRIMARY MISSION, JPL MAY PERFORM WORK FOR OTHER NASA MISSION DIRECTORATES OR OFFICES. 7) JPL IS ALSO RESPONSIBLE FOR TH… | 2018-10-01 | 2028-09-30 | 2026 | CA | 2026-09-15 23:40:51 | |||||
| CONT_AWD_80KSC019C0013_8000_-NONE-_-NONE- | 80KSC019C0013 | National Aeronautics and Space Administration | National Aeronautics and Space Administration | contracts | DEFINITIVE CONTRACT | BECHTEL NATIONAL, INC. | BECHTEL NATIONAL, INC. | WA9LNGN2DPF4 | 7cfe19f0-3996-b85d-3d93-9ebc1c887d0a-C | 1540889354.01 | 1472143491.72 | DESIGN AND CONSTRUCTION OF THE NASA SPACE LAUNCH SYSTEM (SLS) MOBILE LAUNCHER 2 (ML2). | 2019-07-01 | 2026-06-05 | 2026 | VA | 2026-08-20 10:46:05 | |||||
| CONT_AWD_NAS902078_8000_-NONE-_-NONE- | NAS902078 | National Aeronautics and Space Administration | National Aeronautics and Space Administration | contracts | DEFINITIVE CONTRACT | KBR WYLE SERVICES, LLC | KBR WYLE SERVICES, LLC | SCAHJH4FK963 | b64b25d0-9da4-7452-c6b9-2366de8df9d3-C | 1517116462.31 | BIOASTRONAUTICS CONTRACT-ACTIVITIES FOR THE HEALTH &PRODUCTIVITY OF CREWS WORKING AND LIVING IN SPACE | 2003-03-11 | 2015-10-31 | 2017 | TX | |||||||
| CONT_AWD_NNJ10TB01C_8000_-NONE-_-NONE- | NNJ10TB01C | National Aeronautics and Space Administration | National Aeronautics and Space Administration | contracts | DEFINITIVE CONTRACT | HAMILTON SUNDSTRAND SPACE SYSTEMS INTERNATIONAL, INC. | HAMILTON SUNDSTRAND SPACE SYSTEMS INTERNATIONAL, INC. | LFZJHMW3EJ39 | efc5f063-27af-3505-b2ba-0942484a744f-C | 1507665745.1 | 726405252.35 | EXTRAVEHICULAR SPACE OPERATIONS CONTRACT (ESOC) | 2010-10-01 | 2027-09-30 | 2026 | TX | 2026-09-23 16:23:13 | |||||
| CONT_AWD_80GSFC19C0063_8000_-NONE-_-NONE- | 80GSFC19C0063 | National Aeronautics and Space Administration | National Aeronautics and Space Administration | contracts | DEFINITIVE CONTRACT | PERATON INC. | PERATON INC. | ZBPQEJVECCT4 | 129fccb1-783c-9fd1-7b6d-6ddea65ace79-C | 1499831638.62 | 1267251557.61 | THE EXPLORATION AND SPACE COMMUNICATIONS PROJECTS DIVISION (ESC) IS A NATIONAL RESOURCE LOCATED AT GODDARD SPACE FLIGHT CENTER (GSFC) WHICH ENABLES SCIENTIFIC DISCOVERY AND SPACE EXPLORATION BY PROVIDING INNOVATIVE AND MISSION-EFFECTIVE SPACE COMMUNICATIONS AND NAVIGATION SOLUTIONS TO A LARGE COMMUNITY OF DIVERSE CUSTOMERS. ESC MANAGES OPERATIONAL GEOSTATIONARY COMMUNICATIONS RELAY SATELLITES AND GROUND SYSTEMS FOR THE SPACE COMMUNICATIONS AND NAVIGATION (SCAN) PROGRAM AT NASA HEADQUARTERS. TODAY, SCAN NETWORK SYSTEMS CONSIST OF THE SPACE NETWORK (SN), THE NEAR EARTH NETWORK (NEN), AND THE DEEP SPACE NETWORK (DSN). THE DAY-TO-DAY MANAGEMENT OF THESE THREE NETWORKS IS CURRENTLY NOT FULLY CONSISTENT. IT IS THE INTENTION OF THE GOVERNMENT TO UNIFY THE SN AND NEN WHERE PRACTICABLE UNDER THIS CONTRACT USING INTEGRATED, COMMON MANAGEMENT PRACTICES AND NETWORK SOLUTIONS. | 2019-10-01 | 2027-09-30 | 2026 | VA | 2026-08-31 11:01:15 | |||||
| CONT_AWD_NNN13D496T_8000_NNN12AA01C_8000 | NNN13D496T | National Aeronautics and Space Administration | National Aeronautics and Space Administration | contracts | DELIVERY ORDER | CALIFORNIA INSTITUTE OF TECHNOLOGY | CALIFORNIA INSTITUTE OF TECHNOLOGY | YC1YP79BFD19 | 6e76fa33-2d96-c636-941c-bca1997db076-C | 1403381590.45 | 2796733.33 | IGF::CL::IGF 2020 MARS SCIENCE ROVER PROJECT - PHASE A THE CONTRACT IS THE SPONSORING AGREEMENT BETWEEN THE NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) AND THE CALIFORNIA INSTITUTE OF TECHNOLOGY (CONTRACTOR), A PRIVATE NONPROFIT EDUCATIONAL INSTITUTION, WHICH ESTABLISHES THE RELATIONSHIP FOR THE OPERATION OF THE FEDERALLY FUNDED RESEARCH AND DEVELOPMENT CENTER (FFRDC) KNOWN AS THE JET PROPULSION LABORATORY. THE CONTRACTOR, JPL, IS REQUIRED TO PERFORM WORK THAT IS DESIGNATED IN TASK ORDERS ISSUED BY THE NASA MANAGEMENT OFFICE (NMO) CONTRACTING OFFICERS. NASA - SPONSORED WORK: JPL'S PRIMARY MISSION IS TO SUPPORT THE NASA SCIENCE MISSION DIRECTORATE (SMD) IN CARRYING OUT THE SPECIFIC OBJECTIVES IDENTIFIED IN THE SMD SCIENCE PLAN. THE FOUR BROAD SCIENTIFIC AREAS ARE: EARTH SCIENCE, PLANETARY SCIENCE, HELIOPHYSICS, AND ASTROPHYSICS. IN PERFORMANCE OF THIS CONTRACT, JPL SHALL: 1) SUPPLY A BROAD BASE OF SCIENTIFIC AND TECHNICAL CAPABILITIES RELEVANT TO NASA PROGRAM AND PROJECT RESPONSIBILITIES AND ASSIGNMENTS. 2) FOSTER ITS UNIQUE RELATIONSHIP WITH A TOP-TIER UNIVERSITY TO FACILITATE THE INVOLVEMENT OF SCIENTISTS, ENGINEERS, AND STUDENTS FROM THE UNIVERSITY AND RESEARCH COMMUNITIES IN NASA MISSION AND IN SUPPORTING OTHER GOVERNMENT AGENCIES. 3) SUPPORT NASA IN ENABLING PROGRAM AND INSTITUTIONAL CAPABILITIES. 4) DEVELOP SPACECRAFT AND INSTRUMENTS THAT ARE SENT TO VARIOUS DESTINATIONS WITH OUR SOLAR SYSTEM, INCLUDING EARTH ORBIT, PLANETS, PLANETARY SATELLITES, ASTEROIDS, AND COMETS. THESE MISSIONS MAY BE ORBITERS, LANDERS, OR ROVERS, AND TYPICALLY INCLUDE CUTTING-EDGE TECHNOLOGIES REQUIRED TO MEET SCIENTIFIC REQUIREMENTS. 5) PERFORM PROJECT TASKS INVOLVING: (I) AUTONOMOUS DEEP-SPACE, INNER-SPACE AND EARTH-ORBITING SPACECRAFT OR MAJOR SUBSYSTEMS, (II) EXPERIMENTS, INSTRUMENTS, OR OTHER DEVICES WHICH MAY BE CARRIED AS PAYLOAD ON SPACECRAFTS IN MISSIONS MANAGED BY OTHERS, AND/OR (III) GROUND-BASED SYSTEMS. 6) BEYOND ITS PRIMARY MISSION, JPL MAY PERFORM WORK FOR OTHER NASA MISSION DIRECTORATES OR OFFICES. 7) JPL IS A… | 2013-07-24 | 2020-09-27 | 2024 | CA | ||||||
| CONT_AWD_NMO710820_8000_NAS703001_8000 | NMO710820 | National Aeronautics and Space Administration | National Aeronautics and Space Administration | contracts | DELIVERY ORDER | CALIFORNIA INSTITUTE OF TECHNOLOGY | CALIFORNIA INSTITUTE OF TECHNOLOGY | YC1YP79BFD19 | 6e76fa33-2d96-c636-941c-bca1997db076-C | 1399491608.19 | DEEP SPACE NETWORK | 2003-09-30 | 2012-09-30 | 2021 | CA | |||||||
| CONT_AWD_MSFC0200308DNAS803060_8000_-NONE-_-NONE- | MSFC0200308DNAS803060 | National Aeronautics and Space Administration | National Aeronautics and Space Administration | contracts | DEFINITIVE CONTRACT | SMITHSONIAN INSTITUTION | SMITHSONIAN INSTITUTION | Q7N8CH7NR418 | b9c84403-30df-7651-340e-6f71d13d5362-C | 1347228052.0 | 383579596.64 | FOLLOW ON CONTRACT TO PROVIDE OPERATIONS AND SCIENCE SUPPORT TO THE CXO | 2003-08-31 | 2027-09-30 | 2026 | MA | 2026-06-11 13:04:11 | |||||
| CONT_AWD_80MSFC22F0048_8000_80MSFC20D0004_8000 | 80MSFC22F0048 | National Aeronautics and Space Administration | National Aeronautics and Space Administration | contracts | DELIVERY ORDER | THE JOHNS HOPKINS UNIVERSITY APPLIED PHYSICS LABORATORY LLC | THE JOHNS HOPKINS UNIVERSITY APPLIED PHYSICS LABORATORY LLC | C1HBCJ9RMBV3 | 4eae43e5-e1f1-0e77-b2fe-09a12a9a552c-C | 1338710271.0 | 1177929515.47 | DRAGONFLY EXTENDED PHASE B MISSION UNDER 80MSFC20D0004 AEROSPACE RESEARCH, DEVELOPMENT AND ENGINEERING SUPPORT (ARDES) II. | 2022-03-04 | 2028-08-31 | 2026 | MD | 2026-09-22 15:08:37 | |||||
| CONT_AWD_NNM12AA82C_8000_-NONE-_-NONE- | NNM12AA82C | National Aeronautics and Space Administration | National Aeronautics and Space Administration | contracts | DEFINITIVE CONTRACT | THE BOEING COMPANY | THE BOEING COMPANY | SML4NN2CT556 | 3632dc26-45b8-9d0e-1128-63e866708c8f-C | 1336720376.0 | 892460116.87 | INTERIM CRYOGENIC PROPULSION STAGE FOR SLS | 2012-10-01 | 2027-12-31 | 2026 | AL | 2026-09-21 17:53:51 | |||||
| CONT_AWD_NNK08OC01C_8000_-NONE-_-NONE- | NNK08OC01C | National Aeronautics and Space Administration | National Aeronautics and Space Administration | contracts | DEFINITIVE CONTRACT | AMENTUM SERVICES, INC. | AMENTUM SERVICES, INC. | QEMLRQA7PLG4 | fe5366b4-84c8-12ff-126f-f123de29819c-C | 1326964603.32 | 1615844.07 | KSC INSTITUTIONAL SERVICES CONTRACT (ISC) | 2008-10-01 | 2019-03-31 | 2023 | FL | ||||||
| CONT_AWD_NNJ09HD46C_8000_-NONE-_-NONE- | NNJ09HD46C | National Aeronautics and Space Administration | National Aeronautics and Space Administration | contracts | DEFINITIVE CONTRACT | LEIDOS INC | LEIDOS INC | MPD5KD7XAPK4 | 1bf747f7-acdf-ea23-5eee-76337a35c108-C | 1306805321.14 | 77943.13 | THE FACILITIES DEVELOPMENT AND OPERATIONS CONTRACT(FDOC) SPECIFIES TECHNICAL, MANAGERIAL, AND ADMINSTRATIVE WORK NEEDED TO ENSURE THE AVAILABLITITY, INTEGRITY, AND RELIABILITY OF MISSIONOPERATIONS FACILITES SUPPORTING NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) HUMAN SPACE FLIGHT (HSF) PROGRAMS REQUIRING MISSION OPERATIONS SUPPORT. THE OBJECTIVE OF THIS CONTRACT IS TO CONSOLIDATE EFFORTS ACROSS THE FACILITIES COVERED UNDER FODOC IN ORDER TO MAXIMIZE SYNERGY FOR HARDWARE AND SOFTWARE DEVELOPMENT, MODIFICATION, SUSTAINING. MAINTENANCE, RECONFIGURATION, AND OPERATIONS FOR THE PURPOSE OF REDUCING COST WITHOUT COMPROMISING FACILITY FUNCTIONALITY AND PERFORMANCE. NASA WILL COLLABORATE WITH THE CONTRACTOR ON DEVELOPING PROCEDURAL AND TECHNICAL INNOVATIONS THAT IMPROVE QUALITY, ENSURE CUSTOMER SATISFACTION AND REDUCE COST. MISSION OPERATIONS FACILITIES CURRENTLY SUPPORT THE SPACE SHUTTLE PROGRAMAND THE INTERNATIONAL SPACE STATION PROGRA, INCLUDING INTERNATIONAL PARTNER AND COMMMERCIAL VISITING VEHICLES. MISSION OPERATIONS FACILITIES SUPPORTING THE CNSTELLATION PROGRAM(CXP) ARE CONTINUOUSLY UNDER DEVELOPMENT IN CONCERT WITH CXP FORMULATION AND IMPLEMENTATION. FDOC APPLIES TO THE FACILITIES OF THESE THREE PROGRAMS, AND ANY OTHER HSF PROGRAM REQUIRING MISSION OPERATIONS FACILITY SUPPORT. IN ADDITION, FUTURE MISSION OPERATIONS FACILITIES AND CAPABILITIES ARE WITHIN THE TECHNICAL SCOPE OF THIS SOW, AND FDOC WORLK ASSOCIATED WITH THESE FACILITIES WILL BE ENABLED THROUGH IDIQ. | 2008-11-07 | 2018-02-28 | 2024 | TX | ||||||
| CONT_AWD_80NM0018F0616_8000_80NM0018D0004_8000 | 80NM0018F0616 | National Aeronautics and Space Administration | National Aeronautics and Space Administration | contracts | DELIVERY ORDER | CALIFORNIA INSTITUTE OF TECHNOLOGY | CALIFORNIA INSTITUTE OF TECHNOLOGY | YC1YP79BFD19 | 6e76fa33-2d96-c636-941c-bca1997db076-C | 1288723797.01 | 895663169.35 | M2020 MARS SCIENCE ROVER PROJECT-PHASE A-D 60-19107 THE CONTRACT IS THE SPONSORING AGREEMENT BETWEEN THE NATIONAL AERONAUTICS AND SPACE ADMINISTRATION NASA AND THE CALIFORNIA INSTITUTE OF TECHNOLOGY-CONTRACTOR, A PRIVATE NONPROFIT EDUCATIONAL INSTITUTION, WHICH ESTABLISHES THE RELATIONSHIP FOR THE OPERATION OF THE FEDERALLY FUNDED RESEARCH AND DEVELOPMENT CENTER-FFRDC KNOWN AS THE JET PROPULSION LABORATORY. THE CONTRACTOR, JPL, IS REQUIRED TO PERFORM WORK THAT IS DESIGNATED IN TASK ORDERS ISSUED BY THE NASA MANAGEMENT OFFICE-NMO CONTRACTING OFFICERS. NASA-SPONSORED WORK: JPLS PRIMARY MISSION IS TO SUPPORT THE NASA SCIENCE MISSION DIRECTORATE-SMD IN CARRYING OUT THE SPECIFIC OBJECTIVES IDENTIFIED IN THE SMD SCIENCE PLAN. THE FOUR BROAD SCIENTIFIC AREAS ARE: EARTH SCIENCE, PLANETARY SCIENCE, HELIOPHYSICS, AND ASTROPHYSICS. IN PERFORMANCE OF THIS CONTRACT, JPL SHALL: 1. SUPPLY A BROAD BASE OF SCIENTIFIC AND TECHNICAL CAPABILITIES RELEVANT TO NASA PROGRAM AND PROJECT RESPONSIBILITIES AND ASSIGNMENTS. 2. FOSTER ITS UNIQUE RELATIONSHIP WITH A TOP-TIER UNIVERSITY TO FACILITATE THE INVOLVEMENT OF SCIENTISTS, ENGINEERS, AND STUDENTS FROM THE UNIVERSITY AND RESEARCH COMMUNITIES IN NASA MISSION AND IN SUPPORTING OTHER GOVERNMENT AGENCIES. 3. SUPPORT NASA IN ENABLING PROGRAM AND INSTITUTIONAL CAPABILITIES. 4. DEVELOP SPACECRAFT AND INSTRUMENTS THAT ARE SENT TO VARIOUS DESTINATIONS WITH OUR SOLAR SYSTEM, INCLUDING EARTH ORBIT, PLANETS, PLANETARY SATELLITES, ASTEROIDS, AND COMETS. THESE MISSIONS MAY BE ORBITERS, LANDERS, OR ROVERS, AND TYPICALLY INCLUDE CUTTING-EDGE TECHNOLOGIES REQUIRED TO MEET SCIENTIFIC REQUIREMENTS. 5. PERFORM PROJECT TASKS INVOLVING: I-AUTONOMOUS DEEP-SPACE, INNER-SPACE AND EARTH-ORBITING SPACECRAFT OR MAJOR SUBSYSTEMS, II-EXPERIMENTS, INSTRUMENTS, OR OTHER DEVICES WHICH MAY BE CARRIED AS PAYLOAD ON SPACECRAFTS IN MISSIONS MANAGED BY OTHERS, AND-OR III-GROUND-BASED SYSTEMS. 6. BEYOND ITS PRIMARY MISSION, JPL MAY PERFORM WORK FOR OTHER NASA MISSION DIRECTORATES OR OFFICES. 7. JPL IS ALSO RESPONSIBLE FO… | 2018-10-01 | 2028-09-24 | 2026 | CA | 2026-09-16 13:44:31 | |||||
| CONT_AWD_NNG10DB04C_8000_-NONE-_-NONE- | NNG10DB04C | National Aeronautics and Space Administration | National Aeronautics and Space Administration | contracts | DEFINITIVE CONTRACT | GENERAL DYNAMICS MISSION SYSTEMS, INC. | GENERAL DYNAMICS MISSION SYSTEMS, INC. | MWDRZJ2ZVPV7 | f09ed3a7-cbd4-f4d6-046d-eb0780590412-C | 1248395086.84 | 121244270.93 | THE SPACE NETWORK (SN) CONSISTS OF A SPACE SEGMENT COMPRISED OF THE TRACKING AND DATA RELAY SATELLITES (TDRSS), AND A GROUND SEGMENT (SNGS). THE SN PROVIDES THE CAPABILITY FOR GLOBAL SPACE-TO-GROUND TELECOMMUNICATIONS AND TRACKING COVERAGE FOR LOW EARTH ORBIT (LEO) AND NEAR-EARTH SPACEFLIGHT MISSIONS, INCLUDING BOTH ROBOTIC AND HUMAN SPACE FLIGHT. THE SNGS INCLUDES FACILITIES AND SYSTEMS LOCATED AT THE WHITE SANDS COMPLEX (WSC) AT LAS CRUCES, NM THE GUAM REMOTE GROUND TERMINAL (GRGT) AT GUAM AND SPACE NETWORK EXPANSION (SNE) EAST AT BLOSSOM POINT, MD. THE PURPOSE OF THE SGSS PROJECT IS TO IMPLEMENT A MODERN GROUND SEGMENT THAT WILL ENABLE THE SN TO CONTINUE TO DELIVER HIGH QUALITY SERVICES TO THE SN COMMUNITY, MEET STAKEHOLDER REQUIREMENTS, AND SIGNIFICANTLY REDUCE REQUIRED OPERATIONS AND MAINTENANCE RESOURCES. | 2010-06-21 | 2021-06-30 | 2023 | AZ | ||||||
| CONT_AWD_NNG10XA05C_8000_-NONE-_-NONE- | NNG10XA05C | National Aeronautics and Space Administration | National Aeronautics and Space Administration | contracts | DEFINITIVE CONTRACT | RAYTHEON COMPANY | RAYTHEON COMPANY | NBSLHP77ZJQ1 | b6b091bb-570b-bf26-3e7a-b4a1a7c2d61a-C | 1226055499.67 | 320421448.17 | ENGINEERING SERVICES AND DEVELOPMENT LEADING TO THE DELIVERY OF THE VISIBLE INFRARED IMAGER RADIOMETER (VIRS) INSTRUMENT AND SUPPORT. | 2010-09-22 | 2029-03-01 | 2026 | CA | 2026-09-10 16:08:01 | |||||
| CONT_AWD_NNG09DA01C_8000_-NONE-_-NONE- | NNG09DA01C | National Aeronautics and Space Administration | National Aeronautics and Space Administration | contracts | DEFINITIVE CONTRACT | PERATON INC. | PERATON INC. | N3RSDM1LXKK9 | 9869839a-619f-9824-74c8-972f881dd6f4-C | 1200320663.04 | 34280432.47 | NASA GODDARD SPACE FLIGHT CENTER'S (GSFC) GOAL FOR THE SPACE COMMUNICATIONS NETWORKS SERVICES CONTRACT (SCNS) IS TO ENABLE MISSION SUCCESS FOR EVERY CUSTOMER USING SCNS SERVICES. KEY OBJECTIVES OF THE SCNS CONTRACT ARE TO DECREASE COST AND MAINTAIN OR IMPROVE OPERATIONAL EFFICIENCY AND RELIABILITY, WHILE MAINTAINING AN ACCEPTABLE LEVEL OF RISK AND PROVIDING FOR SAFE OPERATION OF THE MISSIONS. THE CONTRACTOR SHALL IMPLEMENT A SAFETY, HEALTH, AND MISSION ASSURANCE PROGRAM THAT PROVIDES A SAFE AND HEALTHY WORK ENVIRONMENT, MINIMIZES PROGRAM RISK, AND MAXIMIZES NASA MISSION SUCCESS. THE CONTRACTOR SHALL BE RESPONSIBLE AND ACCOUNTABLE FOR ACHIEVING THE REQUIRED RESULTS. CORE REQUIREMENT FUNCTIONS, SUCH AS CONFIGURATION MANAGEMENT, QUALITY ASSURANCE, ETC. ARE REQUIRED TO SUPPORT IDIQ TASK ORDERS. THE SPACE NETWORK (SN) IS COMPRISED OF A FLEET OF ON-ORBIT TRACKING AND DATA RELAY SATELLITES (TDRS) AND ASSOCIATED GROUND SYSTEMS THAT PROVIDE TELECOMMUNICATIONS SERVICES. THE NATURE OF THE SN ARCHITECTURE, I.E., EXTREMELY LARGE CAPITAL INVESTMENT, CONTRACTOR OPERATED FACILITIES, CONTINUOUS 24X7 REQUIREMENTS, ETC., LENDS ITSELF TO A CORE REQUIREMENTS APPROACH. THE GROUND NETWORK (GN) CONSISTS OF AN ORBITAL TRACKING NETWORK AND THE SATELLITE LASER RANGING NETWORK. THE NATURE OF THE GROUND NETWORK ARCHITECTURE, I.E., DIVERSE MIX OF COMMERCIAL AND GOVERNMENT ASSETS, EVOLVING GEOGRAPHIC AND TECHNICAL CUSTOMER REQUIREMENTS, AND LEGACY SYSTEMS, ETC. LENDS ITSELF TO AN IDIQ APPROACH. OTHER ACTIVITIES, I.E., VERY LONG BASELINE INTERFEROMETRY NETWORK OPERATIONS AND MAINTENANCE (O&M), ELECTRONIC SYSTEM TEST LABORATORY, REQUIREMENTS DEVELOPMENT, HARDWARE AND SOFTWARE DEVELOPMENT, ETC. ARE BEST SUITED TO AN IDIQ APPROACH IN THE RESOURCE-CONSTRAINED ENVIRONMENT THAT NASA OPERATES IN. | 2008-10-11 | 2019-10-08 | 2025 | MD | ||||||
| CONT_AWD_NNG08DA00C_8000_-NONE-_-NONE- | NNG08DA00C | National Aeronautics and Space Administration | National Aeronautics and Space Administration | contracts | DEFINITIVE CONTRACT | THE BOEING COMPANY | THE BOEING COMPANY | M6BRZ1FHEZQ1 | df8638e3-b642-fae8-6730-21c1ec716038-C | 1139377845.71 | 16818765.0 | THIS CONTRACT IS TO DESIGN, DEVELOP, FABRICATE, INTEGRATE, TEST, SHIP, PROVIDE LAUNCH SUPPORT, CONDUCT ON-ORBIT CHECKOUT OPERATIONS AND PROVIDE SUSTAINING ENGINEERING SUPPORT FOR TWO TRACKING DATA RELAY SATELLITE (TDRS) SPACECRAFT. THE CONTRACT REQUIREMENTS ALSO INCLUDE THE DESIGN, ASSEMBLE, TEST, INSTALL AND VERIFICATION OF MODIFICATIONS TO THE WHITE SANDS COMPLEX NECESSARY TO MAKE THE GROUND TERMINALS FULLY COMPATIBLE WITH THE TDRS K PROGRAM SPACECRAFT DESIGN. THE CONTRACT ALSO INCLUDES OPTIONS FOR TWO ADDITIONAL SPACECRAFT. | 2007-12-28 | 2026-02-05 | 2024 | CA | 2026-09-24 17:01:54 | |||||
| CONT_AWD_GSFC0199711DNAS597271_8000_-NONE-_-NONE- | GSFC0199711DNAS597271 | National Aeronautics and Space Administration | National Aeronautics and Space Administration | contracts | DEFINITIVE CONTRACT | THE JOHNS HOPKINS UNIVERSITY APPLIED PHYSICS LABORATORY LLC | THE JOHNS HOPKINS UNIVERSITY APPLIED PHYSICS LABORATORY LLC | C1HBCJ9RMBV3 | 4eae43e5-e1f1-0e77-b2fe-09a12a9a552c-C | 1102140609.74 | 39082444.89 | AEROSPACE RESEARCH, DESIGN, AND DEVELOPMENT TASKS FOR NASA | 1997-10-01 | 2024-12-31 | 2025 | MD | ||||||
| CONT_AWD_NNG04DA00C_8000_-NONE-_-NONE- | NNG04DA00C | National Aeronautics and Space Administration | National Aeronautics and Space Administration | contracts | DEFINITIVE CONTRACT | HONEYWELL TECHNOLOGY SOLUTIONS INC. | HONEYWELL TECHNOLOGY SOLUTIONS INC. | DZATN7C2FW67 | ad6109b5-7ec1-a7fd-9e5c-71ed7839403e-C | 1095544578.03 | 0.0 | NASA GODDARD SPACE FLIGHT CENTER S (GSFC) GOAL FOR THE NEAR EARTH NETWORKS SERVICES CONTRACT (NENS) IS TO ENABLE MISSION SUCCESS FOR EVERY CUSTOMER USING NENS SERVICES. IN ORDER TO SUPPORT THIS GOAL, THE NENS CONTRACTOR SHALL PROVIDE THE AGENCY WITH SERVICES THAT ARE HIGHLY RELIABLE AND AFFORDABLE AND CONTRIBUTE TO THE SAFE OPERATION OF THE MISSION. THE CONTRACTOR SHALL IMPLEMENT A SAFETY, HEALTH, AND MISSION ASSURANCE PROGRAM THAT PROVIDES A SAFE AND HEALTHY WORK ENVIRONMENT, MINIMIZES PROGRAM RISK, AND MAXIMIZES NASA MISSION SUCCESS. | 2003-10-09 | 2011-04-08 | 2025 | MD | ||||||
| CONT_AWD_80JSC017C0006_8000_-NONE-_-NONE- | 80JSC017C0006 | National Aeronautics and Space Administration | National Aeronautics and Space Administration | contracts | DEFINITIVE CONTRACT | KBR WYLE SERVICES, LLC | KBR WYLE SERVICES, LLC | HYBLSJAMM2F4 | eb13e842-2068-e3ee-0453-d02b9582e5cd-C | 1057002179.33 | 887707711.95 | IGF::CT::IGFMSOC FPDS-NG MISSION SYSTEMS OPERATIONS CONTRACT (MSOC) | 2018-01-02 | 2026-07-31 | 2026 | TX | 2026-09-14 11:42:30 | |||||
| CONT_AWD_NNG04HZ07C_8000_-NONE-_-NONE- | NNG04HZ07C | National Aeronautics and Space Administration | National Aeronautics and Space Administration | contracts | DEFINITIVE CONTRACT | L3HARRIS TECHNOLOGIES, INC. | L3HARRIS TECHNOLOGIES, INC. | TZ67YHER84V7 | c61f4fb9-20f5-73f5-f3fd-f82a39a2f478-C | 1036291804.0 | 94893922.2 | TAS::80 0122::TAS DEVELOPMENT, MANUFACTURING AND SUPPORT TO WEATHER OBSERVING INSTRUMENT | 2004-09-15 | 2039-06-25 | 2026 | IN | 2026-07-22 08:46:58 | |||||
| CONT_AWD_NNG17CR69C_8000_-NONE-_-NONE- | NNG17CR69C | National Aeronautics and Space Administration | National Aeronautics and Space Administration | contracts | DEFINITIVE CONTRACT | SCIENCE APPLICATIONS INTERNATIONAL CORPORATION | SCIENCE APPLICATIONS INTERNATIONAL CORPORATION | MMLKPW9JLX64 | 20af0683-f17d-1f8f-38ee-2f11bd124559-C | 1025846137.9 | 767426370.93 | IGF::OT::IGF THIS EFFORT IS FOR A FOLLOW ON PROCUREMENT REQUIREMENT. THE NAME OF THIS PROCUREMENT IS THE OMNIBUS MULTIDISCIPLINE ENGINEERING SERVICES (OMES) II. THE PRINCIPAL PURPOSE OF THIS CONTRACT IS TO PROVIDE MULTIDISCIPLINE ENGINEERING SUPPORT SERVICES AND RELATED WORK TO EED, ISTD, SED, MSD, MESA, JPSS, SSCO, AND RELATED ORGANIZATIONS, AS REQUIRED, FOR THE STUDY, DESIGN, SYSTEMS ENGINEERING, DEVELOPMENT, FABRICATION, INTEGRATION, TESTING, VERIFICATION, AND OPERATIONS OF SPACE FLIGHT, AIRBORNE, AND GROUND SYSTEM HARDWARE AND SOFTWARE, INCLUDING DEVELOPMENT AND VALIDATION OF NEW TECHNOLOGIES TO ENABLE FUTURE SPACE AND SCIENCE MISSIONS. TO THIS END, THE CONTRACTOR SHALL PROVIDE ON/OFF-SITE MULTIDISCIPLINE ENGINEERING SERVICES, PURSUANT TO TASK ORDERS ISSUED BY THE CONTRACTING OFFICER. THESE SERVICES SHALL INCLUDE THE PERSONNEL, FACILITIES, AND MATERIALS (UNLESS OTHERWISE PROVIDED BY THE GOVERNMENT) TO ACCOMPLISH THE TASKS. TRAVEL MAY BE REQUIRED BY THE CONTRACTOR TO SUPPORT CERTAIN TASK ORDERS, THESE TRAVEL REQUIREMENTS WILL BE IDENTIFIED ON A TASK BY TASK BASIS. | 2017-07-01 | 2023-11-30 | 2025 | MD | ||||||
| CONT_AWD_NAS919100_8000_-NONE-_-NONE- | NAS919100 | National Aeronautics and Space Administration | National Aeronautics and Space Administration | contracts | DEFINITIVE CONTRACT | LOCKHEED MARTIN SERVICES, LLC | LOCKHEED MARTIN SERVICES, LLC | JVDNJPNWRN89 | 07da861f-321c-ee3b-9226-c75f0f8fdba7-C | 983884421.44 | 2475721.44 | SEAT/SCIENCE ENGINEERING,ANALYSIS, AND TEST | 2000-09-27 | 2006-06-16 | 2024 | TX | ||||||
| CONT_AWD_NNN10AA08T_8000_NNN06AA01C_8000 | NNN10AA08T | National Aeronautics and Space Administration | National Aeronautics and Space Administration | contracts | DELIVERY ORDER | THE JOHNS HOPKINS UNIVERSITY APPLIED PHYSICS LABORATORY LLC | THE JOHNS HOPKINS UNIVERSITY APPLIED PHYSICS LABORATORY LLC | C1HBCJ9RMBV3 | 4eae43e5-e1f1-0e77-b2fe-09a12a9a552c-C | 894500235.0 | 150065812.8 | SOLAR PROBE PLUS (SPP) PHASE A ACTIVITIES THE CONTRACTOR SHALL PERFORM THE WORK THAT IS DESIGNATED IN TASK ORDERS ISSUED BY THE CONTRACTING OFFICER. THE OVERALL SCOPE OF WORK TO BE PERFORMED WILL SUPPORT ALL OF NASA'S MISSION DIRECTORATES. THESE EFFORTS CAN BE CHARACTERIZED AS AEROSPACE RESEARCH, DEVELOPMENT, AND ENGINEERING SUPPORT (ARDES). THE GENERAL NATURE OF THE TASKS TO BE DEVELOPED WILL BE TO CONDUCT SUPPORTING RESEARCH AND ADVANCED TECHNOLOGY DEVELOPMENT DESIGNED TO MAKE CONTRIBUTIONS TO SPACE SCIENCE AND SPACE EXPLORATION AND ASSIST NASA IN THE FORMULATION AND EXECUTION OF ITS PROGRAMS BY PROVIDING NASA WITH TECHNICAL ADVICE, STUDIES, AND REPORTS OF INVESTIGATIONS. EFFORTS UNDERTAKEN BY THE CONTRACTOR, IN THE PERFORMANCE OF THE ASSIGNED TASKS, WHICH INCLUDE TECHNOLOGY TRANSFER, PARTNERING AND COMMERCIALIZATION ACTIVITIES, SHALL SEEK TO ENHANCE THE VALUE AND CONTRIBUTION OF TECHNOLOGY TO THE NATION S TECHNOLOGICAL COMPETITIVENESS, PROSPERITY, QUALITY OF LIFE, AND OTHER NATIONAL PRIORITIES. INDIVIDUAL TASK ORDERS WILL FALL WITHIN ONE OF TWO BROAD CATEGORIES: 1) ESSENTIAL RESEARCH CAPABILITY OF SPACE SYSTEMS ENGINEERING, AND RELATED WORK IN THE SUPPORTING ESSENTIAL RESEARCH CAPABILITIES OF SYSTEMS TEST AND EVALUATION, INFORMATION TECHNOLOGY, AND SIMULATION, MODELING AND OPERATIONS ANALYSIS. TASK ORDERS WITHIN THE CATEGORY OF ESSENTIAL RESEARCH CAPABILITIES ARE INTENDED TO PRESERVE THE NATION S CAPABILITIES TO PERFORM ROBOTIC SPACE MISSIONS OVER THE FULL MISSION LIFE CYCLE FROM CONCEPT FORMULATION THROUGH MISSION OPERATIONS AND DATA ANALYSIS. NASA IS CONTRACTING FOR SUPPORT IN SEVERAL KEY RESEARCH, ENGINEERING AND DEVELOPMENT COMPETENCIES THAT ARE FUNDAMENTAL TO THE PERFORMANCE OF THESE MISSIONS. 2) OTHER AEROSPACE RESEARCH, DEVELOPMENT, AND ENGINEERING SUPPORT. TASK ORDERS WITHIN THE CATEGORY OF OTHER AEROSPACE RESEARCH, DEVELOPMENT AND ENGINEERING SUPPORT ARE INTENDED TO INCLUDE A BROAD BASE OF SCIENTIFIC AND TECHNICAL CAPABILITIES RELEVANT TO NASA PROGRAM RESPONSIBILITIES AND ASSIGNMENTS. R… | 2010-05-17 | 2026-03-31 | 2026 | MD | ||||||
| CONT_AWD_KSC00200209DNAS1002007_8000_-NONE-_-NONE- | KSC00200209DNAS1002007 | National Aeronautics and Space Administration | National Aeronautics and Space Administration | contracts | DEFINITIVE CONTRACT | BOEING COMPANY, THE | BOEING COMPANY, THE | PSR4B9T5MXB1 | dacc1929-712f-b38d-cfa0-aa6982ecba5b-C | 894254777.11 | 0.0 | CAPPS - CHECKOUT ASSEMBLY PAYLOAD PROCESSING SERVICES | 2002-10-01 | 2013-02-28 | 2017 | FL | ||||||
| CONT_AWD_80NM0020F0054_8000_80NM0018D0004_8000 | 80NM0020F0054 | National Aeronautics and Space Administration | National Aeronautics and Space Administration | contracts | DELIVERY ORDER | CALIFORNIA INSTITUTE OF TECHNOLOGY | CALIFORNIA INSTITUTE OF TECHNOLOGY | YC1YP79BFD19 | 6e76fa33-2d96-c636-941c-bca1997db076-C | 887370046.0 | 707140549.61 | NEAR EARTH OBJECT SURVEYOR (NEO SURVEYOR) PROJECT (71-107722) | 2020-06-22 | 2027-10-31 | 2026 | CA | 2026-07-22 15:01:01 | |||||
| CONT_AWD_GSFC0199210DNAS550000_8000_-NONE-_-NONE- | GSFC0199210DNAS550000 | National Aeronautics and Space Administration | National Aeronautics and Space Administration | contracts | DEFINITIVE CONTRACT | LOCKHEED MARTIN CORP | LOCKHEED MARTIN CORP | CQWLW9XRQTH5 | 46023044-eacc-a9ca-5b5e-ddc4673fc267-C | 876874552.3 | 0.0 | HST FLIGHT SYSTEMS & SERVICING SUPPORT | 1999-10-15 | 2011-06-30 | 2017 | MD | ||||||
| CONT_AWD_NNM05AB50C_8000_-NONE-_-NONE- | NNM05AB50C | National Aeronautics and Space Administration | National Aeronautics and Space Administration | contracts | DEFINITIVE CONTRACT | AMENTUM TECHNOLOGY, INC. | AMENTUM TECHNOLOGY, INC. | H2RGSKWXKHQ5 | 435aa33d-8ca5-7631-ec18-85dbb07c6fa1-C | 874005781.31 | ENGINEERING SCIENCE AND TECHNOLOGY | 2005-10-15 | 2013-09-30 | 2017 | AL | |||||||
| CONT_AWD_80NM0018F0645_8000_80NM0018D0004_8000 | 80NM0018F0645 | National Aeronautics and Space Administration | National Aeronautics and Space Administration | contracts | DELIVERY ORDER | CALIFORNIA INSTITUTE OF TECHNOLOGY | CALIFORNIA INSTITUTE OF TECHNOLOGY | YC1YP79BFD19 | 6e76fa33-2d96-c636-941c-bca1997db076-C | 822965671.59 | 685242381.61 | PSYCHE: JOURNEY TO A METAL WORLD THE CONTRACT IS THE SPONSORING AGREEMENT BETWEEN THE NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) AND THE CALIFORNIA INSTITUTE OF TECHNOLOGY (CONTRACTOR), A PRIVATE NONPROFIT EDUCATIONAL INSTITUTION, WHICH ESTABLISHES THE RELATIONSHIP FOR THE OPERATION OF THE FEDERALLY FUNDED RESEARCH AND DEVELOPMENT CENTER (FFRDC) KNOWN AS THE JET PROPULSION LABORATORY. THE CONTRACTOR, JPL, IS REQUIRED TO PERFORM WORK THAT IS DESIGNATED IN TASK ORDERS ISSUED BY THE NASA MANAGEMENT OFFICE (NMO) CONTRACTING OFFICERS. NASA - SPONSORED WORK: JPL'S PRIMARY MISSION IS TO SUPPORT THE NASA SCIENCE MISSION DIRECTORATE (SMD) IN CARRYING OUT THE SPECIFIC OBJECTIVES IDENTIFIED IN THE SMD SCIENCE PLAN. THE FOUR BROAD SCIENTIFIC AREAS ARE: EARTH SCIENCE, PLANETARY SCIENCE, HELIOPHYSICS, AND ASTROPHYSICS. IN PERFORMANCE OF THIS CONTRACT, JPL SHALL: 1) SUPPLY A BROAD BASE OF SCIENTIFIC AND TECHNICAL CAPABILITIES RELEVANT TO NASA PROGRAM AND PROJECT RESPONSIBILITIES AND ASSIGNMENTS. 2) FOSTER ITS UNIQUE RELATIONSHIP WITH A TOP-TIER UNIVERSITY TO FACILITATE THE INVOLVEMENT OF SCIENTISTS, ENGINEERS, AND STUDENTS FROM THE UNIVERSITY AND RESEARCH COMMUNITIES IN NASA MISSION AND IN SUPPORTING OTHER GOVERNMENT AGENCIES. 3) SUPPORT NASA IN ENABLING PROGRAM AND INSTITUTIONAL CAPABILITIES. 4) DEVELOP SPACECRAFT AND INSTRUMENTS THAT ARE SENT TO VARIOUS DESTINATIONS WITH OUR SOLAR SYSTEM, INCLUDING EARTH ORBIT, PLANETS, PLANETARY SATELLITES, ASTEROIDS, AND COMETS. THESE MISSIONS MAY BE ORBITERS, LANDERS, OR ROVERS, AND TYPICALLY INCLUDE CUTTING-EDGE TECHNOLOGIES REQUIRED TO MEET SCIENTIFIC REQUIREMENTS. 5) PERFORM PROJECT TASKS INVOLVING: (I) AUTONOMOUS DEEP-SPACE, INNER-SPACE AND EARTH-ORBITING SPACECRAFT OR MAJOR SUBSYSTEMS, (II) EXPERIMENTS, INSTRUMENTS, OR OTHER DEVICES WHICH MAY BE CARRIED AS PAYLOAD ON SPACECRAFTS IN MISSIONS MANAGED BY OTHERS, AND/OR (III) GROUND-BASED SYSTEMS. 6) BEYOND ITS PRIMARY MISSION, JPL MAY PERFORM WORK FOR OTHER NASA MISSION DIRECTORATES OR OFFICES. 7) JPL IS ALSO RESPONSIBL… | 2018-10-01 | 2028-09-30 | 2026 | CA | 2026-08-23 17:41:43 | |||||
| CONT_AWD_NNJ08JA02C_8000_-NONE-_-NONE- | NNJ08JA02C | National Aeronautics and Space Administration | National Aeronautics and Space Administration | contracts | DEFINITIVE CONTRACT | PAE APPLIED TECHNOLOGIES LLC | PAE APPLIED TECHNOLOGIES LLC | K55GHE7FCEF5 | ebfaba2f-88df-188b-0c40-848e63926c8b-C | 819055840.97 | 147860815.56 | FACILITIES SUPPORT SERVICES TAS::80 0130::TAS | 2008-01-03 | 2021-12-31 | 2026 | TX | ||||||
| CONT_AWD_NNS15AA77T_8000_NNS15AA01C_8000 | NNS15AA77T | National Aeronautics and Space Administration | National Aeronautics and Space Administration | contracts | DELIVERY ORDER | SYNCOM SPACE SERVICES LLC | SYNCOM SPACE SERVICES LLC | GM2QNEGF7CA3 | 6137d64e-d928-ed49-f0a9-dab96b1bf047-C | 817360951.0 | 525681523.3 | IGF::OT::IGF SYNERGY-ACHIEVING CONSOLIDATED OPERATIONS AND MAINTENANCE, COST PLUS INCENTIVE FEE - INDEFINITE DELIVERY INDEFINITE QUANTITY | 2016-02-01 | 2025-06-30 | 2026 | MS | 2026-09-21 18:33:25 | |||||
| CONT_AWD_NNG10XA06C_8000_-NONE-_-NONE- | NNG10XA06C | National Aeronautics and Space Administration | National Aeronautics and Space Administration | contracts | DEFINITIVE CONTRACT | L3HARRIS TECHNOLOGIES, INC. | L3HARRIS TECHNOLOGIES, INC. | TZ67YHER84V7 | c61f4fb9-20f5-73f5-f3fd-f82a39a2f478-C | 814435946.0 | 220416370.91 | ENGINEERING SERVICES AND DEVELOPMENT LEADING TO THE DELIVERY OF THE CROSS TRACK INFRARED SOUNDER (CRIS) INSTRUMENT AND SUPPORT. | 2010-09-20 | 2029-11-10 | 2026 | IN | 2026-09-11 17:11:10 | |||||
| CONT_AWD_NNN13D494T_8000_NNN12AA01C_8000 | NNN13D494T | National Aeronautics and Space Administration | National Aeronautics and Space Administration | contracts | DELIVERY ORDER | CALIFORNIA INSTITUTE OF TECHNOLOGY | CALIFORNIA INSTITUTE OF TECHNOLOGY | YC1YP79BFD19 | 6e76fa33-2d96-c636-941c-bca1997db076-C | 796696902.2 | 201144.59 | IGF::CL::IGF EUROPA CLIPPER PRE-PHASE A THE CONTRACT IS THE SPONSORING AGREEMENT BETWEEN THE NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) AND THE CALIFORNIA INSTITUTE OF TECHNOLOGY (CONTRACTOR), A PRIVATE NONPROFIT EDUCATIONAL INSTITUTION, WHICH ESTABLISHES THE RELATIONSHIP FOR THE OPERATION OF THE FEDERALLY FUNDED RESEARCH AND DEVELOPMENT CENTER (FFRDC) KNOWN AS THE JET PROPULSION LABORATORY. THE CONTRACTOR, JPL, IS REQUIRED TO PERFORM WORK THAT IS DESIGNATED IN TASK ORDERS ISSUED BY THE NASA MANAGEMENT OFFICE (NMO) CONTRACTING OFFICERS. NASA - SPONSORED WORK: JPL'S PRIMARY MISSION IS TO SUPPORT THE NASA SCIENCE MISSION DIRECTORATE (SMD) IN CARRYING OUT THE SPECIFIC OBJECTIVES IDENTIFIED IN THE SMD SCIENCE PLAN. THE FOUR BROAD SCIENTIFIC AREAS ARE: EARTH SCIENCE, PLANETARY SCIENCE, HELIOPHYSICS, AND ASTROPHYSICS. IN PERFORMANCE OF THIS CONTRACT, JPL SHALL: 1) SUPPLY A BROAD BASE OF SCIENTIFIC AND TECHNICAL CAPABILITIES RELEVANT TO NASA PROGRAM AND PROJECT RESPONSIBILITIES AND ASSIGNMENTS. 2) FOSTER ITS UNIQUE RELATIONSHIP WITH A TOP-TIER UNIVERSITY TO FACILITATE THE INVOLVEMENT OF SCIENTISTS, ENGINEERS, AND STUDENTS FROM THE UNIVERSITY AND RESEARCH COMMUNITIES IN NASA MISSION AND IN SUPPORTING OTHER GOVERNMENT AGENCIES. 3) SUPPORT NASA IN ENABLING PROGRAM AND INSTITUTIONAL CAPABILITIES. 4) DEVELOP SPACECRAFT AND INSTRUMENTS THAT ARE SENT TO VARIOUS DESTINATIONS WITH OUR SOLAR SYSTEM, INCLUDING EARTH ORBIT, PLANETS, PLANETARY SATELLITES, ASTEROIDS, AND COMETS. THESE MISSIONS MAY BE ORBITERS, LANDERS, OR ROVERS, AND TYPICALLY INCLUDE CUTTING-EDGE TECHNOLOGIES REQUIRED TO MEET SCIENTIFIC REQUIREMENTS. 5) PERFORM PROJECT TASKS INVOLVING: (I) AUTONOMOUS DEEP-SPACE, INNER-SPACE AND EARTH-ORBITING SPACECRAFT OR MAJOR SUBSYSTEMS, (II) EXPERIMENTS, INSTRUMENTS, OR OTHER DEVICES WHICH MAY BE CARRIED AS PAYLOAD ON SPACECRAFTS IN MISSIONS MANAGED BY OTHERS, AND/OR (III) GROUND-BASED SYSTEMS. 6) BEYOND ITS PRIMARY MISSION, JPL MAY PERFORM WORK FOR OTHER NASA MISSION DIRECTORATES OR OFFICES. 7) JPL IS ALSO RESPONSIBLE… | 2013-07-23 | 2018-10-28 | 2024 | CA | ||||||
| CONT_AWD_80NM0018F0710_8000_80NM0018D0004_8000 | 80NM0018F0710 | National Aeronautics and Space Administration | National Aeronautics and Space Administration | contracts | DELIVERY ORDER | CALIFORNIA INSTITUTE OF TECHNOLOGY | CALIFORNIA INSTITUTE OF TECHNOLOGY | YC1YP79BFD19 | 6e76fa33-2d96-c636-941c-bca1997db076-C | 778669649.0 | 620850781.5 | NASA ISRO SYNTHETIC APERTURE RADAR (NISAR) MISSION 89-17620 | 2018-10-01 | 2028-09-30 | 2026 | CA | 2026-09-08 07:25:36 | |||||
| CONT_AWD_NNN13D820T_8000_NNN12AA01C_8000 | NNN13D820T | National Aeronautics and Space Administration | National Aeronautics and Space Administration | contracts | DELIVERY ORDER | CALIFORNIA INSTITUTE OF TECHNOLOGY | CALIFORNIA INSTITUTE OF TECHNOLOGY | YC1YP79BFD19 | 6e76fa33-2d96-c636-941c-bca1997db076-C | 772548320.08 | 45792.0 | IGF::CL::IGF DEEP SPACE NETWORK THE CONTRACT IS THE SPONSORING AGREEMENT BETWEEN THE NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) AND THE CALIFORNIA INSTITUTE OF TECHNOLOGY (CONTRACTOR), A PRIVATE NONPROFIT EDUCATIONAL INSTITUTION, WHICH ESTABLISHES THE RELATIONSHIP FOR THE OPERATION OF THE FEDERALLY FUNDED RESEARCH AND DEVELOPMENT CENTER (FFRDC) KNOWN AS THE JET PROPULSION LABORATORY. THE CONTRACTOR, JPL, IS REQUIRED TO PERFORM WORK THAT IS DESIGNATED IN TASK ORDERS ISSUED BY THE NASA MANAGEMENT OFFICE (NMO) CONTRACTING OFFICERS. NASA - SPONSORED WORK: JPL'S PRIMARY MISSION IS TO SUPPORT THE NASA SCIENCE MISSION DIRECTORATE (SMD) IN CARRYING OUT THE SPECIFIC OBJECTIVES IDENTIFIED IN THE SMD SCIENCE PLAN. THE FOUR BROAD SCIENTIFIC AREAS ARE: EARTH SCIENCE, PLANETARY SCIENCE, HELIOPHYSICS, AND ASTROPHYSICS. IN PERFORMANCE OF THIS CONTRACT, JPL SHALL: 1) SUPPLY A BROAD BASE OF SCIENTIFIC AND TECHNICAL CAPABILITIES RELEVANT TO NASA PROGRAM AND PROJECT RESPONSIBILITIES AND ASSIGNMENTS. 2) FOSTER ITS UNIQUE RELATIONSHIP WITH A TOP-TIER UNIVERSITY TO FACILITATE THE INVOLVEMENT OF SCIENTISTS, ENGINEERS, AND STUDENTS FROM THE UNIVERSITY AND RESEARCH COMMUNITIES IN NASA MISSION AND IN SUPPORTING OTHER GOVERNMENT AGENCIES. 3) SUPPORT NASA IN ENABLING PROGRAM AND INSTITUTIONAL CAPABILITIES. 4) DEVELOP SPACECRAFT AND INSTRUMENTS THAT ARE SENT TO VARIOUS DESTINATIONS WITH OUR SOLAR SYSTEM, INCLUDING EARTH ORBIT, PLANETS, PLANETARY SATELLITES, ASTEROIDS, AND COMETS. THESE MISSIONS MAY BE ORBITERS, LANDERS, OR ROVERS, AND TYPICALLY INCLUDE CUTTING-EDGE TECHNOLOGIES REQUIRED TO MEET SCIENTIFIC REQUIREMENTS. 5) PERFORM PROJECT TASKS INVOLVING: (I) AUTONOMOUS DEEP-SPACE, INNER-SPACE AND EARTH-ORBITING SPACECRAFT OR MAJOR SUBSYSTEMS, (II) EXPERIMENTS, INSTRUMENTS, OR OTHER DEVICES WHICH MAY BE CARRIED AS PAYLOAD ON SPACECRAFTS IN MISSIONS MANAGED BY OTHERS, AND/OR (III) GROUND-BASED SYSTEMS. 6) BEYOND ITS PRIMARY MISSION, JPL MAY PERFORM WORK FOR OTHER NASA MISSION DIRECTORATES OR OFFICES. 7) JPL IS ALSO RESPONSIBLE… | 2012-10-01 | 2018-09-30 | 2026 | CA | 2026-05-18 15:15:34 | |||||
| CONT_AWD_NNX11AA01C_8000_-NONE-_-NONE- | NNX11AA01C | National Aeronautics and Space Administration | National Aeronautics and Space Administration | contracts | DEFINITIVE CONTRACT | PERATON ENTERPRISE SOLUTIONS LLC | PERATON ENTERPRISE SOLUTIONS LLC | MBSRAWAQ9559 | 333909ba-42cf-a1ce-3959-1ede2882d7f6-C | 769166010.07 | 0.0 | THE AGENCY CONSOLIDATED END-USER SERVICES (ACES)CONTRACT WILL PROVIDE AND MANAGE NASA'S PERSONAL COMPUTING HARDWARE, AGENCY STANDARD SOFTWARE, MOBILE IT SERVICES, PERIPHERALS AND ACCESSORIES, ASSOCIATED END-USER SERVICES, AND SUPPORTING INFRASTRUCTURE. | 2011-01-03 | 2018-10-31 | 2020 | MS | ||||||
| CONT_AWD_NNN15R003T_8000_NNN12AA01C_8000 | NNN15R003T | National Aeronautics and Space Administration | National Aeronautics and Space Administration | contracts | DELIVERY ORDER | CALIFORNIA INSTITUTE OF TECHNOLOGY | CALIFORNIA INSTITUTE OF TECHNOLOGY | YC1YP79BFD19 | 6e76fa33-2d96-c636-941c-bca1997db076-C | 765458749.57 | 421695.1 | IGF::CL::IGF ISLAND THE CONTRACT IS THE SPONSORING AGREEMENT BETWEEN THE NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) AND THE CALIFORNIA INSTITUTE OF TECHNOLOGY (CONTRACTOR), A PRIVATE NONPROFIT EDUCATIONAL INSTITUTION, WHICH ESTABLISHES THE RELATIONSHIP FOR THE OPERATION OF THE FEDERALLY FUNDED RESEARCH AND DEVELOPMENT CENTER (FFRDC) KNOWN AS THE JET PROPULSION LABORATORY. THE CONTRACTOR, JPL, IS REQUIRED TO PERFORM WORK THAT IS DESIGNATED IN TASK ORDERS ISSUED BY THE NASA MANAGEMENT OFFICE (NMO) CONTRACTING OFFICERS. NASA - SPONSORED WORK: JPL'S PRIMARY MISSION IS TO SUPPORT THE NASA SCIENCE MISSION DIRECTORATE (SMD) IN CARRYING OUT THE SPECIFIC OBJECTIVES IDENTIFIED IN THE SMD SCIENCE PLAN. THE FOUR BROAD SCIENTIFIC AREAS ARE: EARTH SCIENCE, PLANETARY SCIENCE, HELIOPHYSICS, AND ASTROPHYSICS. IN PERFORMANCE OF THIS CONTRACT, JPL SHALL: 1) SUPPLY A BROAD BASE OF SCIENTIFIC AND TECHNICAL CAPABILITIES RELEVANT TO NASA PROGRAM AND PROJECT RESPONSIBILITIES AND ASSIGNMENTS. 2) FOSTER ITS UNIQUE RELATIONSHIP WITH A TOP-TIER UNIVERSITY TO FACILITATE THE INVOLVEMENT OF SCIENTISTS, ENGINEERS, AND STUDENTS FROM THE UNIVERSITY AND RESEARCH COMMUNITIES IN NASA MISSION AND IN SUPPORTING OTHER GOVERNMENT AGENCIES. 3) SUPPORT NASA IN ENABLING PROGRAM AND INSTITUTIONAL CAPABILITIES. 4) DEVELOP SPACECRAFT AND INSTRUMENTS THAT ARE SENT TO VARIOUS DESTINATIONS WITH OUR SOLAR SYSTEM, INCLUDING EARTH ORBIT, PLANETS, PLANETARY SATELLITES, ASTEROIDS, AND COMETS. THESE MISSIONS MAY BE ORBITERS, LANDERS, OR ROVERS, AND TYPICALLY INCLUDE CUTTING-EDGE TECHNOLOGIES REQUIRED TO MEET SCIENTIFIC REQUIREMENTS. 5) PERFORM PROJECT TASKS INVOLVING: (I) AUTONOMOUS DEEP-SPACE, INNER-SPACE AND EARTH-ORBITING SPACECRAFT OR MAJOR SUBSYSTEMS, (II) EXPERIMENTS, INSTRUMENTS, OR OTHER DEVICES WHICH MAY BE CARRIED AS PAYLOAD ON SPACECRAFTS IN MISSIONS MANAGED BY OTHERS, AND/OR (III) GROUND-BASED SYSTEMS. 6) BEYOND ITS PRIMARY MISSION, JPL MAY PERFORM WORK FOR OTHER NASA MISSION DIRECTORATES OR OFFICES. 7) JPL IS ALSO RESPONSIBLE FOR THE OPERATION, … | 2014-10-17 | 2021-05-30 | 2024 | CA | ||||||
| CONT_AWD_NNG07CA21C_8000_-NONE-_-NONE- | NNG07CA21C | National Aeronautics and Space Administration | National Aeronautics and Space Administration | contracts | DEFINITIVE CONTRACT | KBR WYLE SERVICES, LLC | KBR WYLE SERVICES, LLC | HYBLSJAMM2F4 | eb13e842-2068-e3ee-0453-d02b9582e5cd-C | 728477896.88 | 0.0 | THE PURPOSE OF THIS CONTRACT IS TO ACQUIRE ENGINEERING SERVICES AND RELATED SERVICES TO MSD AND RELATED ORGANIZATIONS THROUGHOUT GSFC, AS REQUIRED, FOR THE FORMULATION, DESIGN, DEVELOPMENT, FABRICATION, INTEGRATION, TESTING, VERIFICATION, AND OPERATIONS OF SPACE FLIGHT AND GROUND SYSTEM HARDWARE AND SOFTWARE, INCLUDING DEVELOPMENT AND VALIDATION OF NEW TECHNOLOGIES TO ENABLE FUTURE SPACE AND SCIENCE MISSIONS. THE ENGINEERING AREAS OF EMPHASIS ARE MULTIDISCIPLINARY WITH CONCENTRATION IN THE MECHANICAL ENGINEERING AREAS OF MATERIALS, STRUCTURAL ANALYSIS AND LOADS, MECHANICAL DESIGN, ELECTROMECHANICAL DESIGN, THERMAL, CONTAMINATION AND COATINGS, MANUFACTURING AND INTEGRATION AND TEST. | 2007-05-15 | 2012-05-14 | 2022 | MD | ||||||
| CONT_AWD_NNM12AA41C_8000_-NONE-_-NONE- | NNM12AA41C | National Aeronautics and Space Administration | National Aeronautics and Space Administration | contracts | DEFINITIVE CONTRACT | AMENTUM TECHNOLOGY, INC. | AMENTUM TECHNOLOGY, INC. | H2RGSKWXKHQ5 | 435aa33d-8ca5-7631-ec18-85dbb07c6fa1-C | 712900239.54 | 353688.0 | IGF::CL,CT::IGF ENGINEERING AND SCIENCE SERVICES AND SKILLS AUGMENTATION (ESSSA) | 2012-08-01 | 2017-11-30 | 2024 | AL | ||||||
| CONT_AWD_NNS07AB21C_8000_-NONE-_-NONE- | NNS07AB21C | National Aeronautics and Space Administration | National Aeronautics and Space Administration | contracts | DEFINITIVE CONTRACT | AMENTUM TECHNOLOGY, INC. | AMENTUM TECHNOLOGY, INC. | H2RGSKWXKHQ5 | 435aa33d-8ca5-7631-ec18-85dbb07c6fa1-C | 679861532.5 | 564164.03 | FACILITY OPERATING SERVICES AT THE JOHN C. STENNIS SPACE CENTER, INCLUDING BUILDING AND GROUNDS MAINTENANCE, MEDICAL CLINIC, CAFETERIA, ENGINEERING SERVICES, PROCUREMENT SERVICES, GRAPHICS SERVICES, ET AL. | 2007-07-17 | 2016-07-31 | 2024 | MS | ||||||
| CONT_AWD_80GSFC22CA020_8000_-NONE-_-NONE- | 80GSFC22CA020 | National Aeronautics and Space Administration | National Aeronautics and Space Administration | contracts | DEFINITIVE CONTRACT | KBR WYLE SERVICES, LLC | KBR WYLE SERVICES, LLC | HYBLSJAMM2F4 | eb13e842-2068-e3ee-0453-d02b9582e5cd-C | 678705619.7 | 594385973.88 | GROUND SYSTEMS AND MISSION OPERATIONS (GSMO-3) | 2022-06-01 | 2027-05-31 | 2026 | MD | 2026-09-29 10:31:48 | |||||
| CONT_AWD_80GSFC18C0120_8000_-NONE-_-NONE- | 80GSFC18C0120 | National Aeronautics and Space Administration | National Aeronautics and Space Administration | contracts | DEFINITIVE CONTRACT | SCIENCE SYSTEMS AND APPLICATIONS, INC. | SCIENCE SYSTEMS AND APPLICATIONS, INC. | PJ2SP76D3HJ3 | 58f27a06-8b13-db66-44e8-66fff87b6bb7-C | 671125324.46 | 618271935.38 | ELECTRICAL ENGINEERING SYSTEMS SERVICES THE PRINCIPAL PURPOSE OF THIS CONTRACT IS TO PROVIDE ELECTRICAL/ELECTRONIC ENGINEERING SUPPORT SERVICES AND RELATED WORK TO EED, ISTD, SED, MESA, RELATED ORGANIZATIONS AND OTHER NASA CENTERS AND LOCATIONS SPECIFIED IN TASK ORDERS, FOR THE STUDY, DESIGN, DEVELOPMENT, FABRICATION, INTEGRATION, TESTING, VERIFICATION, AND OPERATIONS OF SPACE FLIGHT, AIRBORNE, AND GROUND SYSTEM HARDWARE AND SOFTWARE, INCLUDING DEVELOPMENT AND VALIDATION OF NEW TECHNOLOGIES TO ENABLE FUTURE SPACE AND SCIENCE MISSIONS. | 2018-11-01 | 2025-05-08 | 2026 | MD | 2026-07-08 11:17:52 | |||||
| CONT_AWD_80GSFC26C0032_8000_-NONE-_-NONE- | 80GSFC26C0032 | National Aeronautics and Space Administration | National Aeronautics and Space Administration | contracts | DEFINITIVE CONTRACT | BLUE ORIGIN, LLC | BLUE ORIGIN, LLC | SFKWJAYSTL95 | 2c023317-2253-d360-9710-a68608d3963f-C | 660000017.0 | PROVIDE DESIGN, DEVELOPMENT, INTEGRATION, LAUNCH, AND ON ORBIT, CONTINUOUS COMMUNICATIONS IN SUPPORT OF A MARS SAMPLE RETURN (MSR) MISSION AND FUTURE MARS SURFACE, ORBITAL, AND HUMAN EXPLORATION MISSIONS. | 2026-09-01 | 2030-12-31 | AL | 2026-09-03 16:28:43 | |||||||
| CONT_AWD_NMO710962_8000_NAS703001_8000 | NMO710962 | National Aeronautics and Space Administration | National Aeronautics and Space Administration | contracts | DELIVERY ORDER | CALIFORNIA INSTITUTE OF TECHNOLOGY | CALIFORNIA INSTITUTE OF TECHNOLOGY | YC1YP79BFD19 | 6e76fa33-2d96-c636-941c-bca1997db076-C | 651588744.53 | JUNO PHASE B - MSFC | 2005-11-23 | 2011-09-25 | 2021 | CA | |||||||
| CONT_AWD_80KSC018C0017_8000_-NONE-_-NONE- | 80KSC018C0017 | National Aeronautics and Space Administration | National Aeronautics and Space Administration | contracts | DEFINITIVE CONTRACT | AMENTUM SPACEPORT LLC | AMENTUM SPACEPORT LLC | KA18WLGL1NQ5 | a01c5eb0-9d0f-4631-24a6-75917712d54d-C | 649872782.09 | 578067396.43 | BASE OPERATIONS AND SPACEPORT SERVICES (BOSS) CONTRACT | 2019-04-01 | 2027-03-31 | 2026 | FL | 2026-09-04 11:58:42 | |||||
| CONT_AWD_NNG04DA01C_8000_-NONE-_-NONE- | NNG04DA01C | National Aeronautics and Space Administration | National Aeronautics and Space Administration | contracts | DEFINITIVE CONTRACT | KBR WYLE SERVICES, LLC | KBR WYLE SERVICES, LLC | JU9GLKSCUXE3 | 14c92d76-9870-ace3-dbf2-431863daf0bd-C | 623753038.03 | 0.0 | MISSION OPERATIONS MANAGEMENT SERVICES (MOMS) | 2003-11-01 | 2012-03-31 | 2018 | MD | ||||||
| CONT_AWD_NNG12CR31C_8000_-NONE-_-NONE- | NNG12CR31C | National Aeronautics and Space Administration | National Aeronautics and Space Administration | contracts | DEFINITIVE CONTRACT | KBR WYLE SERVICES, LLC | KBR WYLE SERVICES, LLC | HYBLSJAMM2F4 | eb13e842-2068-e3ee-0453-d02b9582e5cd-C | 607384964.24 | 0.0 | IGF::OT::IGF OTHER FUNCTIONS THIS IS A NEW PROCUREMENT REQUIREMENT. THE NAME OF THIS PROCUREMENT IS THE OMNIBUS MULTIDISCIPLINE ENGINEERING SERVICES (OMES). THE PRINCIPAL PURPOSE OF THIS CONTRACT IS TO PROVIDE MULTIDISCIPLINE ENGINEERING SUPPORT SERVICES AND RELATED WORK TO EED, ISTD, SED, MSD, MESA, JPSS, AND RELATED ORGANIZATIONS, AS REQUIRED, FOR THE STUDY, DESIGN, SYSTEMS ENGINEERING, DEVELOPMENT, FABRICATION, INTEGRATION, TESTING, VERIFICATION, AND OPERATIONS OF SPACE FLIGHT, AIRBORNE, AND GROUND SYSTEM HARDWARE AND SOFTWARE, INCLUDING DEVELOPMENT AND VALIDATION OF NEW TECHNOLOGIES TO ENABLE FUTURE SPACE AND SCIENCE MISSIONS.TO THIS END, THE CONTRACTOR SHALL PROVIDE ON/OFF-SITE MULTIDISCIPLINE ENGINEERING SERVICES, PURSUANT TO TASK ASSIGNMENTS ISSUED BY THE CONTRACTING OFFICER. THESE SERVICES SHALL INCLUDE THE PERSONNEL, FACILITIES, AND MATERIALS (UNLESS OTHERWISE PROVIDED BY THE GOVERNMENT) TO ACCOMPLISH THE TASKS. TASK ASSIGNMENTS WILL BE ISSUED TO PERFORM SERVICES IN THE FOLLOWING AREAS FOR COMPONENTS, SUBSYSTEMS, SYSTEMS, SCIENCE INSTRUMENTS, AND SPACECRAFT, SUBORBITALCRAFT (E.G., AIRCRAFT, SOUNDING ROCKETS, UAVS, BALLOONS), INCLUDING ATTACHED SHUTTLE PAYLOADS, FREE-FLYING SPACECRAFT, SUBORBITALCRAFT PAYLOADS, AND SPACE STATION PAYLOADS AS WELL AS GROUND SUPPORT EQUIPMENT, SIMULATORS, NON-FLIGHT MODELS, AND PROTOTYPES; CANDIDATE, FEASIBILITY, AND SYSTEMS DEFINITION STUDIES; PROJECT MANAGEMENT; SYSTEMS ENGINEERING; ANALYSIS; PRELIMINARY DESIGN; DETAILED DESIGN; FABRICATION; ASSEMBLY; INTEGRATION; TEST AND VERIFICATION; TEST INSTRUMENTATION; DATA SYSTEMS MANAGEMENT; LAUNCH AND POST-LAUNCH OPERATIONS; RESEARCH AND TECHNOLOGY UNIQUE TO SYSTEM DEVELOPMENT; PARTS AND MATERIALS; DOCUMENTATION; MAINTENANCE; SUSTAINING ENGINEERING; CONFIGURATION MANAGEMENT; PERFORMANCE ASSURANCE; SYSTEMS SAFETY; AND CONTAMINATION CONTROL. | 2012-06-01 | 2018-06-30 | 2025 | MD | ||||||
| CONT_AWD_GSFC0200101DNAS501090_8000_-NONE-_-NONE- | GSFC0200101DNAS501090 | National Aeronautics and Space Administration | National Aeronautics and Space Administration | contracts | DEFINITIVE CONTRACT | ATK SPACE SYSTEMS LLC | ATK SPACE SYSTEMS LLC | QECLBYN5D5A3 | 7cac1936-5524-907f-4597-f09688f8d1fe-C | 596800894.22 | MECHANICAL ENGINEERING SUPPORT SERVICES | 2001-01-15 | 2008-06-30 | 2019 | MD | |||||||
| CONT_AWD_NNG11XA04C_8000_-NONE-_-NONE- | NNG11XA04C | National Aeronautics and Space Administration | National Aeronautics and Space Administration | contracts | DEFINITIVE CONTRACT | NORTHROP GRUMMAN SYSTEMS CORPORATION | NORTHROP GRUMMAN SYSTEMS CORPORATION | U6V4EWXNS1D8 | 99b7ee6b-29ca-7741-022d-68dfdcac76b2-C | 586604908.78 | 177384805.93 | THE CONTRACTOR SHALL PROVIDE ALL PERSONNEL, FACILITIES, EQUIPMENT, MATERIAL, AND SERVICES NECESSARY TO DESIGN, DEVELOP, MANUFACTURE, INTEGRATE, TEST, AND DELIVER THE HARDWARE, DOCUMENTATION, AND SERVICES SPECIFIED HEREIN. THE CONTRACTOR SHALL ALSO PROVIDE SUPPORT, AS REQUIRED, FOR PRE-DELIVERY MISSION INTEGRATION ACTIVITIES, SUCH AS NPP MISSION OPERATIONS REVIEW AND JPSS DELTA-PDR. DOCUMENTATION AND OTHER TASKS SHOULD BE IN ACCORDANCE WITH THE REQUIREMENTS OF THIS SOW AND THE APPLICABLE DOCUMENTATION REFERENCED IN SECTION 2.3 HEREIN. COMPLIANCE WITH THE REQUIREMENTS STATED HEREIN, SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR. | 2011-09-13 | 2029-03-01 | 2026 | CA | 2026-09-22 13:42:08 | |||||
| CONT_AWD_GSFC0199802DNAS598069_8000_-NONE-_-NONE- | GSFC0199802DNAS598069 | National Aeronautics and Space Administration | National Aeronautics and Space Administration | contracts | DEFINITIVE CONTRACT | THE BOEING COMPANY | THE BOEING COMPANY | M6BRZ1FHEZQ1 | df8638e3-b642-fae8-6730-21c1ec716038-C | 584311888.0 | 0.0 | NASA IS PARTICIPATING WITH THE DOC/NOAA IN A MULTI-SATELLITE PROGRAM TO PROVIDE CONTINUOUS MONITORING OF EARTH AND SPACE ENVIRONMENT PARAMETERS. THE MONITORED PARAMETERS WILL PROVIDE DATA FOR WEATHER PREDICTION MODELS AND PROVIDE SEVERE WEATHER WARNING DATA. THE PROGRAM IS TERMED GEOSTATIONARY OPERATIONAL ENVIRONMENTAL SATELLITE (GOES) AND IS ACCOMPLISHED USING TWO NATIONAL OCEANIC AND ATMOSPHERIC ADMINISTRATION (NOAA) GEOSTATIONARY SATELLITES STATIONED AT TWO LONGITUDES OVER THE EQUATOR. THE GODDARD SPACE FLIGHT CENTER (GSFC) GOES PROJECT OFFICE HAS BEEN GIVEN RESPONSIBILITY FOR PROCURING THE NECESSARY HARDWARE AND SUPPORT SERVICES TO MEET THE MISSION REQUIREMENTS AS SPECIFIED HEREIN. THE SPACECRAFT CONTRACTOR SHALL FURNISH THE NECESSARY PERSONNEL, FACILITIES, SERVICES, AND MATERIALS TO DESIGN, FABRICATE, INTEGRATE, TEST, DELIVER ON-ORBIT TO NASA, AND SUPPORT ON-ORBIT OPERATIONS FOR ALL OF THE GOES N-Q SPACECRAFT DEVELOPED UNDER THIS CONTRACT. THIS WORK SHALL BE PERFORMED IN ACCORDANCE WITH THE REQUIREMENTS OF THIS DOCUMENT AND ALL ATTACHMENTS TO THE CONTRACT. IN ACCOMPLISHING THE DEVELOPMENT AND DELIVERY OF THE GOES N-Q SPACECRAFT, THE SPACECRAFT CONTRACTOR SHALL PERFORM THE FOLLOWING: 1. PROVIDE THE SPACECRAFT BUS AND THE SPACE ENVIRONMENT MONITOR (SEM) INSTRUMENTS FOR EACH OF THE GOES SPACECRAFT. 2. RECEIVE THE GFE INSTRUMENTS AND RELATED GROUND SUPPORT EQUIPMENT (GSE), THEN INTEGRATE THEM WITH THE SPACECRAFT BUS AND PERFORM SPACECRAFT LEVEL TESTING. 3. PROVIDE ALL REQUIRED SPACECRAFT MECHANICAL AND ELECTRICAL GSE. 4. PROVIDE A SPACECRAFT EMULATOR AND INR PERFORMANCE EVALUATION SYSTEM 5. DELIVER AND SUPPORT INTEGRATION, VERIFICATION, AND MAINTENANCE OF GROUND SYSTEM HARDWARE AND SOFTWARE. 6. DESIGN AND SUPPORT INTEGRATION AND VERIFICATION OF ANY MODIFICATIONS OR REPLACEMENTS TO NOAA GROUND SYSTEM HARDWARE AND SOFTWARE. 7. SUPPORT COMBINED SPACECRAFT AND GROUND SYSTEM TESTING, AND GOES END-TO-END TESTING BEFORE LAUNCH. 8. PROVIDE ALL SERVICES ASSOCIATED WITH THE LAUNCH VEHICLE PROCUREMENT, LAUNCH BASE PROCESSI… | 2000-03-15 | 2020-04-02 | 2023 | CA | ||||||
| ASST_NON_NCC958_080 | NCC958 | National Aeronautics and Space Administration | National Aeronautics and Space Administration | grants | COOPERATIVE AGREEMENT (B) | BAYLOR COLLEGE OF MEDICINE | BAYLOR COLLEGE OF MEDICINE | FXKMA43NTV21 | ddcd398f-5e59-e840-2368-a57b84efdc7d-C | 583518208.0 | 0.0 | NATIONAL SPACE BIOMEDICAL RESEARCH INSTITUTE | 1999-10-21 | 2018 | TX | 43.001 | ||||||
| CONT_AWD_NNG15VE05D_8000_NNG10AZ13B_8000 | NNG15VE05D | National Aeronautics and Space Administration | National Aeronautics and Space Administration | contracts | DELIVERY ORDER | NORTHROP GRUMMAN SYSTEMS CORPORATION | NORTHROP GRUMMAN SYSTEMS CORPORATION | Q11ZHUFBW741 | d6601efc-adc3-1030-5904-be323dc49433-C | 575251038.25 | 349838728.64 | JOINT POLAR SATELLITE SYSTEM-2 SPACECRAFT. GD-300HP CORE SPACECRAFT INCLUDING ALL ASSOCIATED HARDWARE, SOFTWARE, SOURCE CODE, MAINTENANCE SYSTEM AND DOCUMENTATION FOR THE JPSS-2 SPACECRAFT MISSION. | 2015-03-30 | 2028-04-30 | 2026 | AZ | 2026-09-29 10:03:56 | |||||
| CONT_AWD_NNN13D181T_8000_NNN12AA01C_8000 | NNN13D181T | National Aeronautics and Space Administration | National Aeronautics and Space Administration | contracts | DELIVERY ORDER | CALIFORNIA INSTITUTE OF TECHNOLOGY | CALIFORNIA INSTITUTE OF TECHNOLOGY | YC1YP79BFD19 | 6e76fa33-2d96-c636-941c-bca1997db076-C | 564235812.37 | 22474.98 | IGF::CL::IGF INSIGHT (INTERIOR STRUCTURE FOR SEISMIC INVESTIGATION, GEODESY, HEAT TRANSFER) THE CONTRACT IS THE SPONSORING AGREEMENT BETWEEN THE NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) AND THE CALIFORNIA INSTITUTE OF TECHNOLOGY (CONTRACTOR), A PRIVATE NONPROFIT EDUCATIONAL INSTITUTION, WHICH ESTABLISHES THE RELATIONSHIP FOR THE OPERATION OF THE FEDERALLY FUNDED RESEARCH AND DEVELOPMENT CENTER (FFRDC) KNOWN AS THE JET PROPULSION LABORATORY. THE CONTRACTOR, JPL, IS REQUIRED TO PERFORM WORK THAT IS DESIGNATED IN TASK ORDERS ISSUED BY THE NASA MANAGEMENT OFFICE (NMO) CONTRACTING OFFICERS. NASA SPONSORED WORK: JPL S PRIMARY MISSION IS TO SUPPORT THE NASA SCIENCE MISSION DIRECTORATE (SMD) IN CARRYING OUT THE SPECIFIC OBJECTIVES IDENTIFIED IN THE SMD SCIENCE PLAN. THE FOUR BROAD SCIENTIFIC AREAS ARE: EARTH SCIENCE, PLANETARY SCIENCE, HELIOPHYSICS, AND ASTROPHYSICS. IN PERFORMANCE OF THIS CONTRACT, JPL SHALL: 1) SUPPLY A BROAD BASE OF SCIENTIFIC AND TECHNICAL CAPABILITIES RELEVANT TO NASA PROGRAM AND PROJECT RESPONSIBILITIES AND ASSIGNMENTS. 2) FOSTER ITS UNIQUE RELATIONSHIP WITH A TOP-TIER UNIVERSITY TO FACILITATE THE INVOLVEMENT OF SCIENTISTS, ENGINEERS, AND STUDENTS FROM THE UNIVERSITY AND RESEARCH COMMUNITIES IN NASA MISSION AND IN SUPPORTING OTHER GOVERNMENT AGENCIES. 3) SUPPORT NASA IN ENABLING PROGRAM AND INSTITUTIONAL CAPABILITIES. 4) DEVELOP SPACECRAFT AND INSTRUMENTS THAT ARE SENT TO VARIOUS DESTINATIONS WITH OUR SOLAR SYSTEM, INCLUDING EARTH ORBIT, PLANETS, PLANETARY SATELLITES, ASTEROIDS, AND COMETS. THESE MISSIONS MAY BE ORBITERS, LANDERS, OR ROVERS, AND TYPICALLY INCLUDE CUTTING-EDGE TECHNOLOGIES REQUIRED TO MEET SCIENTIFIC REQUIREMENTS. 5) PERFORM PROJECT TASKS INVOLVING: (I) AUTONOMOUS DEEP-SPACE, INNER-SPACE AND EARTH-ORBITING SPACECRAFT OR MAJOR SUBSYSTEMS, (II) EXPERIMENTS, INSTRUMENTS, OR OTHER DEVICES WHICH MAY BE CARRIED AS PAYLOAD ON SPACECRAFTS IN MISSIONS MANAGED BY OTHERS, AND/OR (III) GROUND-BASED SYSTEMS. 6) BEYOND ITS PRIMARY MISSION, JPL MAY PERFORM WORK FOR OTHER NASA MISSION D… | 2012-10-01 | 2020-11-29 | 2024 | CA | ||||||
| CONT_AWD_NNM09AA20C_8000_-NONE-_-NONE- | NNM09AA20C | National Aeronautics and Space Administration | National Aeronautics and Space Administration | contracts | DEFINITIVE CONTRACT | AMENTUM TECHNOLOGY, INC. | AMENTUM TECHNOLOGY, INC. | H2RGSKWXKHQ5 | 435aa33d-8ca5-7631-ec18-85dbb07c6fa1-C | 550656033.52 | 0.0 | THE CONTRACTOR SHALL PROVIDE ALL PERSONNEL, MATERIALS, EQUIPMENT, AND FACILITIES (EXCEPT AS OTHERWISE PROVIDED FOR IN THIS CONTRACT) NECESSARY TO PERFORM THOSE FUNCTIONS AS SET FORTH IN SECTION J, ATTACHMENTS J-1, PERFORMANCE WORK STATEMENT, J-1-A, PERFORMANCE STANDARDS, J-1-B, PERFORMANCE TIMETABLES, AND J-1-C, MANUFACTURING SUPPORT REQUIREMENTS AND TIMELINE, J-2, FACILITIES PERFORMANCE WORK STATEMENT, AND J-3 DATA PROCUREMENT DOCUMENTS, AS A WHOLE. | 2009-05-01 | 2016-09-30 | 2020 | LA | ||||||
| CONT_AWD_80AFRC18C0018_8000_-NONE-_-NONE- | 80AFRC18C0018 | National Aeronautics and Space Administration | National Aeronautics and Space Administration | contracts | DEFINITIVE CONTRACT | LOCKHEED MARTIN CORPORATION | LOCKHEED MARTIN CORPORATION | LXKGXB75YKY6 | c798c2aa-022b-9a6f-21c5-8060af622f14-C | 538508571.19 | 404202421.3 | THE LOW BOOM FLIGHT DEMONSTRATOR (LBFD) CONTRACT IS FOR THE DESIGN, CONSTRUCTION, AND FLIGHT VALIDATION OF A RESEARCH AIRCRAFT THAT CREATES A SHAPED SONIC BOOM SIGNATURE WITH A CALCULATED LOUDNESS LEVEL OF 75 PLDB [PERCEIVED LEVEL (PL), DECIBELS (DB)] OR LESS DURING SUPERSONIC CRUISE (MACH = 1.4) FLIGHT. | 2018-04-02 | 2026-11-30 | 2025 | CA | 2026-08-13 16:41:35 | |||||
| CONT_AWD_NNG13CR48C_8000_-NONE-_-NONE- | NNG13CR48C | National Aeronautics and Space Administration | National Aeronautics and Space Administration | contracts | DEFINITIVE CONTRACT | AS AND D, LLC | AS AND D, LLC | JYP9MBX3TF16 | 88a2b27d-b103-32bb-8e3d-a4bffdbafb78-C | 527930777.92 | 813795.01 | IGF::OT::IGF ELECTRICAL SYSTEMS ENGINEERING SERVICES II (ESES-II) THE PRINCIPAL PURPOSE OF THIS CONTRACT IS TO PROVIDE ELECTRICAL ENGINEERING SUPPORT SERVICES AND RELATED WORK TO THE GODDARD SPACE FLIGHT CENTER'S APPLIED ENGINEERING AND TECHNOLOGY DIRECTORATE (AETD) AND RELATED ORGANIZATIONS, AS REQUIRED, FOR THE STUDY, DESIGN, DEVELOPMENT, FABRICATION, INTEGRATION, TESTING, VERIFICATION, AND OPERATIONS OF SPACE FLIGHT, AIRBORNE, AND GROUND SYSTEM HARDWARE AND SOFTWARE, INCLUDING DEVELOPMENT AND VALIDATION OF NEW TECHNOLOGIES TO ENABLE FUTURE SPACE AND SCIENCE MISSIONS. | 2013-08-01 | 2019-12-09 | 2023 | MD | ||||||
| CONT_AWD_GSFC0200012DNAS501072_8000_-NONE-_-NONE- | GSFC0200012DNAS501072 | National Aeronautics and Space Administration | National Aeronautics and Space Administration | contracts | DEFINITIVE CONTRACT | THE JOHNS HOPKINS UNIVERSITY APPLIED PHYSICS LABORATORY LLC | THE JOHNS HOPKINS UNIVERSITY APPLIED PHYSICS LABORATORY LLC | C1HBCJ9RMBV3 | 4eae43e5-e1f1-0e77-b2fe-09a12a9a552c-C | 522118990.17 | 0.0 | SUN EARTH CONNECTION LIVING WITH A STAR PROGRAM LETTER CONTRACT | 2000-12-15 | 2016-07-15 | 2017 | MD | ||||||
| CONT_AWD_NNJ04HA01C_8000_-NONE-_-NONE- | NNJ04HA01C | National Aeronautics and Space Administration | National Aeronautics and Space Administration | contracts | DEFINITIVE CONTRACT | HAMILTON SUNDSTRAND CORPORATION | HAMILTON SUNDSTRAND CORPORATION | JC42EBJ5NFJ1 | 464a5b15-000e-8668-246a-c4067a6f0452-C | 511266932.5 | 0.0 | DEFINE & INTEGRATE EVA REQUIREMENTS FOR SHUTTLE & ISS EXPEDITIONS/SUSTAINING ENGINEERING EVA | 2004-09-15 | 2011-03-31 | 2017 | CT | ||||||
| CONT_AWD_NNG17HP02C_8000_-NONE-_-NONE- | NNG17HP02C | National Aeronautics and Space Administration | National Aeronautics and Space Administration | contracts | DEFINITIVE CONTRACT | KBR WYLE SERVICES, LLC | KBR WYLE SERVICES, LLC | JU9GLKSCUXE3 | 14c92d76-9870-ace3-dbf2-431863daf0bd-C | 506557503.52 | 337556626.22 | IGF::OT::IGF GROUND SYSTEMS AND MISSION OPERATIONS 2 (GSMO-2). THE PURPOSE OF THIS PROCUREMENT IS TO ACQUIRE ENGINEERING SERVICES FOR GROUND SYSTEMS AND MISSION OPERATIONS SUPPORT TO MORE THAN 20 MISSIONS IN PHASES OF THE LIFECYCLE FROM PRE-PHASE A TO PHASE E. THE SCOPE ENCOMPASSES CONCEPT STUDIES, DEVELOPMENT (DEFINITION AND IMPLEMENTATION), INTEGRATION, TEST, VERIFICATION, OPERATIONS, SUSTAINMENT OF MISSION OPERATIONS SYSTEMS, SUBSYSTEMS, AND OPERATIONS PROCESSES AND PROCEDURES. SERVICES INVOLVE SYSTEMS ENGINEERING, FACILITY ENGINEERING, LAUNCH AND EARLY ORBIT SUPPORT, FLIGHT OPERATIONS, FLIGHT DYNAMICS SUPPORT, AND SUSTAINING ENGINEERING. | 2017-06-01 | 2022-05-31 | 2026 | MD | 2026-09-24 10:51:22 | |||||
| CONT_AWD_80GSFC20C0044_8000_-NONE-_-NONE- | 80GSFC20C0044 | National Aeronautics and Space Administration | National Aeronautics and Space Administration | contracts | DEFINITIVE CONTRACT | SCIENCE SYSTEMS AND APPLICATIONS, INC. | SCIENCE SYSTEMS AND APPLICATIONS, INC. | PJ2SP76D3HJ3 | 58f27a06-8b13-db66-44e8-66fff87b6bb7-C | 493284723.39 | 433049188.21 | THE PURPOSE OF THIS CONTRACT IS TO ACQUIRE SCIENTIFIC RESEARCH SERVICES THAT CONCEIVES, DEVELOPS AND APPLIES SPACE, FIELD-DEPLOYED (I.E. AIRBORNE AND IN SITU) AND LABORATORY BASED TECHNOLOGIES AND OBSERVATIONS OF THE EARTH SYSTEMS. | 2020-04-01 | 2027-03-31 | 2026 | MD | 2026-09-24 20:02:09 | |||||
| CONT_AWD_NMO710076_8000_NAS703001_8000 | NMO710076 | National Aeronautics and Space Administration | National Aeronautics and Space Administration | contracts | DELIVERY ORDER | CALIFORNIA INSTITUTE OF TECHNOLOGY | CALIFORNIA INSTITUTE OF TECHNOLOGY | YC1YP79BFD19 | 6e76fa33-2d96-c636-941c-bca1997db076-C | 486896883.74 | SPITZER SPACE TELESCOPE (SST) | 2003-09-08 | 2012-09-30 | 2021 | CA | |||||||
| CONT_AWD_GSFC0200208DNAS502105_8000_-NONE-_-NONE- | GSFC0200208DNAS502105 | National Aeronautics and Space Administration | National Aeronautics and Space Administration | contracts | DEFINITIVE CONTRACT | UNIVERSITY OF ARIZONA | UNIVERSITY OF ARIZONA | ED44Y3W6P7B9 | 4f121097-1173-861e-ba01-a877858acd3d-C | 486654377.0 | 35177246.36 | NEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E. | 2002-07-17 | 2027-09-30 | 2025 | AZ | 2026-05-13 22:26:56 | |||||
| CONT_AWD_NNG08HZ00C_8000_-NONE-_-NONE- | NNG08HZ00C | National Aeronautics and Space Administration | National Aeronautics and Space Administration | contracts | DEFINITIVE CONTRACT | LOCKHEED MARTIN CORPORATION | LOCKHEED MARTIN CORPORATION | HDHVQ4EF8A89 | 4de935fd-7eb9-654c-bd76-c9bd3a6943db-C | 486590471.0 | 43127807.06 | TAS::80 0110::TAS GEOSTATIONARY LIGHTNING MAPPER (GLM) INSTRUMENT THE FOR GEOSTATIONARY OPERATIONAL ENVIRONMENTAL SATELLITES (GOES) R. THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, FACILITIES AND OTHER RESOURCES TO DESIGN, DEVELOP, DELIVER (TO THE DESIGNATED DESTINATION) AND SUPPORT UNDER THE BASIC CONTRACT: A) PARTS AND MATERIALS FOR AN ENGINEERING DEVELOPMENT UNIT (EDU) AND 4 FLIGHT MODELS B) ONE GLM ENGINEERING DEVELOPMENT UNIT (EDU) C) ONE GLM PROTO-FLIGHT MODEL (PFM) DESIGNATED FLIGHT MODEL-1 (FM-1) D) THREE SETS OF THE ELECTRICAL SYSTEM TEST EQUIPMENT (ESTE) E) TWO GLM EMULATORS (GLME) F) TWO FLIGHT SOFTWARE DEVELOPMENT ENVIRONMENTS (FSDES) G) ONE GROUND PROCESSING DEMONSTRATION SYSTEM (GPDS) H) SPARES FOR THE FOUR FMS I) ALL ADDITIONAL GLM MECHANICAL AND ELECTRICAL GROUND SUPPORT EQUIPMENT (MGSE AND EGSE) CALLED OUT ELSEWHERE IN THIS DOCUMENT J) ALL ITEMS AND DOCUMENTS SPECIFIED IN ALL CONTRACT DOCUMENTS | 2007-12-13 | 2039-06-25 | 2026 | CA | 2026-09-02 08:16:16 | |||||
| CONT_AWD_NNG10XA01C_8000_-NONE-_-NONE- | NNG10XA01C | National Aeronautics and Space Administration | National Aeronautics and Space Administration | contracts | DEFINITIVE CONTRACT | BAE SYSTEMS SPACE & MISSION SYSTEMS INC. | BAE SYSTEMS SPACE & MISSION SYSTEMS INC. | C8ZLJ61YJ528 | f414ac71-05ca-f93c-6efa-a79cbe0dcfcd-C | 485892042.65 | 145473486.42 | ENGINEERING SERVICES AND DEVELOPMENT LEADING TO THE DELIVERY OF THE OMPS PROTOFLIGHT MODEL AND SUPPORT. | 2010-09-10 | 2029-11-10 | 2026 | CO | 2026-09-24 12:15:55 | |||||
| CONT_AWD_80MSFC20C0020_8000_-NONE-_-NONE- | 80MSFC20C0020 | National Aeronautics and Space Administration | National Aeronautics and Space Administration | contracts | DEFINITIVE CONTRACT | BLUE ORIGIN FEDERATION, LLC | BLUE ORIGIN FEDERATION, LLC | NBVAJ2FT6CK5 | 7e2fcce9-60f9-0830-32e8-50a5c7d19330-C | 479725593.0 | 479725593.0 | WORK REQUIRED FOR THE DESIGN, DEVELOPMENT, MANUFACTURE, TEST, LAUNCH, DEMONSTRATION, AND ENGINEERING SUPPORT OF THE HUMAN LANDING SYSTEM (HLS) INTEGRATED LANDER. | 2020-05-13 | 2021-08-23 | 2021 | WA | ||||||
| CONT_AWD_GSFC0200104DNAS501091_8000_-NONE-_-NONE- | GSFC0200104DNAS501091 | National Aeronautics and Space Administration | National Aeronautics and Space Administration | contracts | DEFINITIVE CONTRACT | TRAX INTERNATIONAL CORPORATION | TRAX INTERNATIONAL CORPORATION | XDC4K4U6LDK6 | 78b2c5e2-ffe0-79d4-f52c-d4918f55404a-C | 471276010.6 | 0.0 | THE LMD FUNCTIONS AND RESPONSIBILITIES INCLUDE, BUT ARE NOT LIMITED TO: LOGISTICS POLICY AND PROGRAM PLANNING REVIEW AND APPROVAL OF WORK INSTRUCTIONS APPROVAL OF MANAGEMENT SYSTEMS GOVERNMENT-TO-GOVERNMENT AGREEMENTS QUALITY MANAGEMENT/QUALITY ASSURANCE POLICY INTERAGENCY AND INTRA-AGENCY AGREEMENTS INTERPRETING FEDERAL LAWS AND REGULATIONS FREIGHT CARRIER NEGOTIATIONS AND SUSPENSION OF CARRIERS CONTRACT BUDGETING AND FUNDING AND ALLOCATION OF RESOURCES DIRECTION TO ADD NEW CUSTOMERS OR STOP SUPPORTING EXISTING CUSTOMERS MARKETING OF LOGISTICS SERVICES CONTRACTOR PERFORMANCE EVALUATION CONTRACT MANAGEMENT SYSTEM REVIEW AND OPERATIONAL AUDITS DETERMINING CUSTOMER SERVICE LEVELS | 2001-04-15 | 2012-07-31 | 2018 | MD | ||||||
| CONT_AWD_NMO715927_8000_NAS703001_8000 | NMO715927 | National Aeronautics and Space Administration | National Aeronautics and Space Administration | contracts | DELIVERY ORDER | CALIFORNIA INSTITUTE OF TECHNOLOGY | CALIFORNIA INSTITUTE OF TECHNOLOGY | YC1YP79BFD19 | 6e76fa33-2d96-c636-941c-bca1997db076-C | 469571204.16 | 0.0 | TECHNOLOGY SUPPORT (AGA) | 2007-02-07 | 2012-09-30 | 2021 | CA | ||||||
| CONT_AWD_NMO710023_8000_NAS703001_8000 | NMO710023 | National Aeronautics and Space Administration | National Aeronautics and Space Administration | contracts | DELIVERY ORDER | CALIFORNIA INSTITUTE OF TECHNOLOGY | CALIFORNIA INSTITUTE OF TECHNOLOGY | YC1YP79BFD19 | 6e76fa33-2d96-c636-941c-bca1997db076-C | 455546663.82 | CASSINI PROJECT | 2003-09-18 | 2010-09-28 | 2021 | CA | |||||||
| CONT_AWD_NNG11VM00C_8000_-NONE-_-NONE- | NNG11VM00C | National Aeronautics and Space Administration | National Aeronautics and Space Administration | contracts | DEFINITIVE CONTRACT | KBR WYLE SERVICES, LLC | KBR WYLE SERVICES, LLC | JU9GLKSCUXE3 | 14c92d76-9870-ace3-dbf2-431863daf0bd-C | 447738648.83 | 383871.24 | THE PURPOSE OF THIS CONTRACT IS TO ACQUIRE ENGINEERING SERVICES FOR THE GODDARD SPACE FLIGHT CENTER (GSFC) FOR GROUND SYSTEMS AND MISSION OPERATIONS SUPPORT IN ALL PHASES OF A MISSION LIFE CYCLE. THE SCOPE ENCOMPASSES CONCEPT STUDIES, DESIGN, DEVELOPMENT, INTEGRATION, TEST, VERIFICATION, OPERATIONS, AND SUSTAINMENT OF MISSION OPERATIONS SYSTEMS AND SUBSYSTEMS, AND OPERATIONS PROCESSES AND PROCEDURES. THE GOVERNMENT ISSUED TASK ORDERS WILL SPECIFY THE SPECIFIC WORK TO BE PERFORMED, INCLUDING THE REQUIREMENTS TO BE MET, THE STANDARD(S) OF PERFORMANCE, REQUIRED DELIVERABLES OR OUTPUT, GOVERNMENT FURNISHED PROPERTY OR INFORMATION, AND APPLICABLE DOCUMENTS WITHIN THIS BROADER CONTRACT SCOPE. | 2011-11-01 | 2017-08-31 | 2024 | MD | ||||||
| CONT_AWD_NAS903056_8000_-NONE-_-NONE- | NAS903056 | National Aeronautics and Space Administration | National Aeronautics and Space Administration | contracts | DEFINITIVE CONTRACT | LOCKHEED MARTIN SPACE OPERATIONS COMPANY | LOCKHEED MARTIN SPACE OPERATIONS COMPANY | U3AXDD6KSNB1 | 1af9dd55-c3c1-dc3c-562f-3e3f41de22db-C | 446069423.54 | 1373742.46 | MISSION SUPPORT OPERATIONS (MOSC) | 2003-09-29 | 2008-09-30 | 2023 | TX | ||||||
| CONT_AWD_80NM0021F0037_8000_80NM0018D0004_8000 | 80NM0021F0037 | National Aeronautics and Space Administration | National Aeronautics and Space Administration | contracts | DELIVERY ORDER | CALIFORNIA INSTITUTE OF TECHNOLOGY | CALIFORNIA INSTITUTE OF TECHNOLOGY | YC1YP79BFD19 | 6e76fa33-2d96-c636-941c-bca1997db076-C | 445052655.0 | 347696446.95 | MASS CHANGE (MC) PRE-PHASE A AND PHASE A PLAN (89-109861) | 2021-06-16 | 2028-09-30 | 2026 | CA | 2026-07-29 10:53:13 | |||||
| CONT_AWD_NNG12FD66C_8000_-NONE-_-NONE- | NNG12FD66C | National Aeronautics and Space Administration | National Aeronautics and Space Administration | contracts | DEFINITIVE CONTRACT | LOCKHEED MARTIN CORP | LOCKHEED MARTIN CORP | FYHNA5WC8XD7 | 6e7a895c-aa57-8600-2a8a-4e237f6213f6-C | 443345131.0 | 60797578.24 | ORIGINS SPECTRAL INTERPRETATION RESOURCE IDENTIFICATION SECURITY-REGOLITH EXPLORER (OSIRIS-REX) PHASE B EFFORT. UNDER THIS CONTRACT, THE CONTRACTOR SHALL PROVIDE THE RESOURCES NECESSARY TO COMPLETE MISSION DESIGN AND REQUIREMENTS FLOW DOWN ACTIVITIES CULMINATING IN AN OSIRIS-REX PROJECT MISSION DESIGN REVIEW (MDR). THE CONTRACTOR SHALL PROVIDE THE RESOURCES NECESSARY TO SUPPORT THE OSIRIS-REX PROJECT TO DEFINE AND COMPLETE THE DEFINITION OF THE PRELIMINARY DESIGN, AND THE PLANS FOR DEVELOPMENT, MANUFACTURE, TEST, VERIFICATION AND OPERATION OF A FLIGHT SYSTEM. | 2012-01-19 | 2027-03-31 | 2026 | CO | 2026-06-30 10:30:43 | |||||
| CONT_AWD_KSC00200303DNAS1003006_8000_-NONE-_-NONE- | KSC00200303DNAS1003006 | National Aeronautics and Space Administration | National Aeronautics and Space Administration | contracts | DEFINITIVE CONTRACT | AS AND D, LLC | AS AND D, LLC | JYP9MBX3TF16 | 88a2b27d-b103-32bb-8e3d-a4bffdbafb78-C | 438507908.36 | 0.0 | LIFE SCIENCES - USTDC | 2003-03-01 | 2011-05-31 | 2017 | FL |
Advanced export
JSON shape: default, array, newline-delimited, object
CREATE TABLE spending_awards (
generated_internal_id TEXT PRIMARY KEY,
award_id TEXT,
agency TEXT,
sub_agency TEXT,
award_category TEXT,
award_type TEXT,
recipient_name TEXT,
recipient_name_normalized TEXT,
recipient_uei TEXT,
recipient_duns TEXT,
recipient_id TEXT,
recipient_location_state TEXT,
award_amount REAL,
total_outlays REAL,
description TEXT,
start_date TEXT,
end_date TEXT,
fiscal_year INTEGER,
state_code TEXT,
cfda_number TEXT,
naics_code TEXT,
naics_description TEXT,
last_modified TEXT
);
CREATE INDEX idx_spending_agency ON spending_awards(agency);
CREATE INDEX idx_spending_category ON spending_awards(award_category);
CREATE INDEX idx_spending_fy ON spending_awards(fiscal_year);
CREATE INDEX idx_spending_recipient ON spending_awards(recipient_name);
CREATE INDEX idx_spending_recipient_norm ON spending_awards(recipient_name_normalized);
CREATE INDEX idx_spending_recip_fy ON spending_awards(recipient_name_normalized, fiscal_year);
CREATE INDEX idx_spending_uei ON spending_awards(recipient_uei) WHERE recipient_uei IS NOT NULL;
CREATE INDEX idx_spending_duns ON spending_awards(recipient_duns) WHERE recipient_duns IS NOT NULL;
CREATE INDEX idx_spending_state ON spending_awards(state_code);