federal_register: E5-7631
Data license: Public Domain (U.S. Government data) · Data source: Federal Register API & Regulations.gov API
This data as json
| document_number | title | type | abstract | publication_date | pub_year | pub_month | html_url | pdf_url | agency_names | agency_ids | excerpts |
|---|---|---|---|---|---|---|---|---|---|---|---|
| E5-7631 | Drawbridge Operation Regulations; Stickney Point (SR 72) Bridge, Gulf Intracoastal Waterway Mile 68.6, Gulf Intracoastal Waterway, Sarasota County, FL | Proposed Rule | The Coast Guard proposes to change the operating schedule of the Stickney Point (SR 72) bridge across the Gulf Intracoastal Waterway, mile 68.6 in Sarasota County, Florida. This proposed rule would require the drawbridge to open on a 30-minute schedule from 6 a.m. until 10 p.m., Monday through Friday except Federal holidays. This proposed action may improve the movement of vehicular traffic while not unreasonably interfering with the movement of vessel traffic. | 2005-12-21 | 2005 | 12 | https://www.federalregister.gov/documents/2005/12/21/E5-7631/drawbridge-operation-regulations-stickney-point-sr-72-bridge-gulf-intracoastal-waterway-mile-686 | https://www.govinfo.gov/content/pkg/FR-2005-12-21/pdf/E5-7631.pdf | Homeland Security Department; Coast Guard | 227,53 | The Coast Guard proposes to change the operating schedule of the Stickney Point (SR 72) bridge across the Gulf Intracoastal Waterway, mile 68.6 in Sarasota County, Florida. This proposed rule would require the drawbridge to open on a 30-minute schedule... |