home / openregs / federal_register

federal_register: 2019-27625

All Federal Register documents (rules, proposed rules, notices, presidential documents) from 1994 to present. Nearly 1M documents with full-text search.

This data as json

document_number title type abstract publication_date pub_year pub_month html_url pdf_url agency_names agency_ids excerpts
2019-27625 Safety Zone, Brandon Road Lock and Dam to Lake Michigan Including Des Plaines River, Chicago Sanitary and Ship Canal, Chicago River, and Calumet-Saganashkee Channel, Chicago, IL Rule The Coast Guard will enforce a segment of the Safety Zone; Brandon Road Lock and Dam to Lake Michigan including Des Plaines River, Chicago Sanitary and Ship Canal, Chicago River, Calumet-Saganashkee Channel on all waters of the Main Branch of the Chicago River 600 feet west of the N Orleans Street Bridge and 1000 feet east of the N Columbus Street Bridge. This action is necessary and intended to protect the safety of life and property on navigable waters prior to, during, and immediately after firework displays. During the enforcement periods listed below, entry into, transiting, or anchoring within the safety zone is prohibited unless authorized by the Captain of the Port Lake Michigan or a designated representative. 2019-12-26 2019 12 https://www.federalregister.gov/documents/2019/12/26/2019-27625/safety-zone-brandon-road-lock-and-dam-to-lake-michigan-including-des-plaines-river-chicago-sanitary https://www.govinfo.gov/content/pkg/FR-2019-12-26/pdf/2019-27625.pdf Homeland Security Department; Coast Guard 227,53 The Coast Guard will enforce a segment of the Safety Zone; Brandon Road Lock and Dam to Lake Michigan including Des Plaines River, Chicago Sanitary and Ship Canal, Chicago River, Calumet-Saganashkee Channel on all waters of the Main Branch of the...

Links from other tables

  • 2 rows from document_number in federal_register_agencies
  • 0 rows from fr_document_number in fr_regs_crossref
Powered by Datasette · Queries took 6.794ms