| 02-893 | Grand Coulee-Bell 500-kV Transmission Line Project | Notice | Bonneville intends to prepare an EIS on the proposed construction, operation, and maintenance of an 84-mile-long 500- kilovolt (kV) transmission line in Douglas, Grant, Lincoln, and Spokane Counties, Washington. The new line would start at Bonneville's Bell Substation in Spokane, and proceed west along an existing right-of-way for about 84 miles, terminating at the Bureau of Reclamation's existing Grand Coulee Switchyard at Grand Coulee Dam. The new line would be built mostly on existing right-of-way, and would replace an existing 115-kV wood pole line. In accordance with DOE regulations for compliance with floodplain and wetlands environmental review requirements, Bonneville will prepare a floodplain and wetlands assessment as necessary to avoid or minimize potential harm to or within any affected floodplains and wetlands. The assessment will be included in the EIS being prepared for the proposed project in accordance with the National Environmental Policy Act (NEPA). | 2002-01-14 | 2002 | 1 | https://www.federalregister.gov/documents/2002/01/14/02-893/grand-coulee-bell-500-kv-transmission-line-project | https://www.govinfo.gov/content/pkg/FR-2002-01-14/pdf/02-893.pdf | Energy Department; Bonneville Power Administration | 136,40 | Bonneville intends to prepare an EIS on the proposed construction, operation, and maintenance of an 84-mile-long 500- kilovolt (kV) transmission line in Douglas, Grant, Lincoln, and Spokane Counties, Washington. The new line would start at Bonneville's... |