federal_register: 02-4618
Data license: Public Domain (U.S. Government data) · Data source: Federal Register API & Regulations.gov API
This data as json
| document_number | title | type | abstract | publication_date | pub_year | pub_month | html_url | pdf_url | agency_names | agency_ids | excerpts |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 02-4618 | Floodplain/Wetland Involvement at the Supply Creek Crossing for the Granby Pumping Plant-Marys Lake 69-kilovolt Transmission Line, Grand County, CO | Notice | This Floodplain/Wetland Statement of Findings for the Supply Creek Crossing, Granby Pumping Plant-Marys Lake 69-kilovolt (kV) Transmission Line was prepared in accordance with the U.S. Department of Energy's (DOE) Floodplain/Wetland Review Requirements. Western Area Power Administration (Western), a power marketing agency of the U.S. Department of Energy (DOE), is the lead Federal agency for a proposal to reroute a 0.8 mile section of the Granby Pumping Plant-Marys Lake 69-kV transmission line. The project is located in Grand County, Colorado, approximately 10 miles north of Granby. Western plans to remove eight wood-pole H-frame structures from the existing right-of- way and relocate them farther to the west, a distance ranging from a few hundred feet to approximately 1,000 feet. All the proposed work will likely occur within a 100-year floodplain of Supply Creek. The existing transmission line and the proposed reroute cross a wetland associated with Supply Creek, and an irrigated meadow. Western has prepared a floodplain/wetland assessment and based on its findings, found no practicable alternative to avoiding the floodplain/wetlands of Supply Creek. | 2002-02-27 | 2002 | 2 | https://www.federalregister.gov/documents/2002/02/27/02-4618/floodplainwetland-involvement-at-the-supply-creek-crossing-for-the-granby-pumping-plant-marys-lake | https://www.govinfo.gov/content/pkg/FR-2002-02-27/pdf/02-4618.pdf | Energy Department; Western Area Power Administration | 136,525 | This Floodplain/Wetland Statement of Findings for the Supply Creek Crossing, Granby Pumping Plant-Marys Lake 69-kilovolt (kV) Transmission Line was prepared in accordance with the U.S. Department of Energy's (DOE) Floodplain/Wetland Review... |