federal_register: 02-11397
Data license: Public Domain (U.S. Government data) · Data source: Federal Register API & Regulations.gov API
This data as json
| document_number | title | type | abstract | publication_date | pub_year | pub_month | html_url | pdf_url | agency_names | agency_ids | excerpts |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 02-11397 | Electrical Interconnection of the Satsop Combustion Turbine Project | Notice | This notice announces the availability of the ROD to offer contract terms to integrate power from the Satsop Combustion Turbine Project, a 650-megawatt gas-fired, combined-cycle, combustion turbine power generation project, into the Federal Columbia River Transmission System (FCRTS). The project is located in Satsop, in the Satsop Development Park, in Grays Harbor County, Washington. This decision was reached after consideration of the site-specific potential environmental impacts analyzed in BPA's Resource Contingency Program Environmental Impact Statement (RCP EIS, DOE/EIS-0230, November 1995), and is consistent with BPA's Business Plan EIS (BP EIS, DOE/EIS-0183, June 1995), and Business Plan ROD (August 1995). | 2002-05-08 | 2002 | 5 | https://www.federalregister.gov/documents/2002/05/08/02-11397/electrical-interconnection-of-the-satsop-combustion-turbine-project | https://www.govinfo.gov/content/pkg/FR-2002-05-08/pdf/02-11397.pdf | Energy Department; Bonneville Power Administration | 136,40 | This notice announces the availability of the ROD to offer contract terms to integrate power from the Satsop Combustion Turbine Project, a 650-megawatt gas-fired, combined-cycle, combustion turbine power generation project, into the Federal Columbia... |