home / openregs / federal_register

federal_register: 01-29246

All Federal Register documents (rules, proposed rules, notices, presidential documents) from 1994 to present.

Data license: Public Domain (U.S. Government data) · Data source: Federal Register API & Regulations.gov API

This data as json

document_number title type abstract publication_date pub_year pub_month html_url pdf_url agency_names agency_ids excerpts
01-29246 Floodplain/Wetland Involvement at the Supply Creek Crossing for the Granby Pumping Plant-Marys Lake 69-Kilovolt Transmission Line, Grand County, Colorado Notice Western Area Power Administration (Western), a power marketing agency of the U.S. Department of Energy (DOE), is the lead Federal agency for a proposal to reroute a 0.8 mile section of the Granby Pumping Plant-Marys Lake 69-kilovolt (kV) transmission line, located in Grand County, Colorado, approximately 10 miles north of the Town of Granby. Western plans to remove eight wood-pole H-frame structures from the existing right-of-way and relocate them farther to the west, a distance ranging from a few hundred feet to approximately 1,000 feet. All the proposed work will likely occur within a 100-year floodplain of Supply Creek. Both the existing transmission line and the proposed reroute cross a wetland associated with Supply Creek, as well as an irrigated meadow. The landowner has requested that Western relocate this section of line to facilitate his ongoing ranching operations. Access to this section of transmission line for maintenance is difficult due to hay meadow irrigation and naturally occurring wet conditions. Relocation of the line will reduce the number of transmission line structures presently located within the wetland area. In accordance with the DOE's Floodplain/Wetland Review Requirements (10 CFR 1022), Western will prepare a floodplain/wetland assessment and will perform the proposed actions in a manner so as to avoid or minimize potential harm to or within the affected floodplain/wetland. 2001-11-23 2001 11 https://www.federalregister.gov/documents/2001/11/23/01-29246/floodplainwetland-involvement-at-the-supply-creek-crossing-for-the-granby-pumping-plant-marys-lake https://www.govinfo.gov/content/pkg/FR-2001-11-23/pdf/01-29246.pdf Energy Department; Western Area Power Administration 136,525 Western Area Power Administration (Western), a power marketing agency of the U.S. Department of Energy (DOE), is the lead Federal agency for a proposal to reroute a 0.8 mile section of the Granby Pumping Plant-Marys Lake 69-kilovolt (kV) transmission...

Links from other tables

  • 2 rows from document_number in federal_register_agencies
  • 0 rows from fr_document_number in fr_regs_crossref
Powered by Datasette · Queries took 3.022ms · Data license: Public Domain (U.S. Government data) · Data source: Federal Register API & Regulations.gov API