home / openregs / federal_register

federal_register: 01-14874

All Federal Register documents (rules, proposed rules, notices, presidential documents) from 1994 to present.

Data license: Public Domain (U.S. Government data) · Data source: Federal Register API & Regulations.gov API

This data as json

document_number title type abstract publication_date pub_year pub_month html_url pdf_url agency_names agency_ids excerpts
01-14874 Intent To Relieve Path 15 Transmission Constraints Notice The National Energy Policy Report announced on May 17, 2001, recommended that the President direct the Secretary of Energy (Secretary) to authorize the Western Area Power Administration (Western) to explore relieving the "Path 15" bottleneck through transmission expansion. The Path 15 bottleneck refers to transmission system constraints which severely limit the flow of electric power over the existing north-south transmission lines located in central California. These existing lines are owned and operated by Pacific Gas and Electric Company (PG&E). On May 28, 2001, the Secretary directed the Administrator of Western to complete its planning to relieve Path 15 constraints, and determine whether outside parties are interested in helping finance and co-own the necessary system additions, including transmission lines. The level of interest will be a factor in the decision by the Secretary whether or not to build the system additions necessary to relieve the constraints. If the system additions are built under this process, Western will be a project manager for the construction efforts. In this notice, Western is requesting Statements of Interest from parties interested in helping finance and co-own the system additions. 2001-06-13 2001 6 https://www.federalregister.gov/documents/2001/06/13/01-14874/intent-to-relieve-path-15-transmission-constraints https://www.govinfo.gov/content/pkg/FR-2001-06-13/pdf/01-14874.pdf Energy Department; Western Area Power Administration 136,525 The National Energy Policy Report announced on May 17, 2001, recommended that the President direct the Secretary of Energy (Secretary) to authorize the Western Area Power Administration (Western) to explore relieving the "Path 15" bottleneck through...

Links from other tables

  • 2 rows from document_number in federal_register_agencies
  • 0 rows from fr_document_number in fr_regs_crossref
Powered by Datasette · Queries took 12.33ms · Data license: Public Domain (U.S. Government data) · Data source: Federal Register API & Regulations.gov API