document_number title type abstract publication_date pub_year pub_month html_url pdf_url agency_names agency_ids excerpts
01-12332 McNary-John Day Transmission Line Project Notice Bonneville intends to prepare an EIS on the construction, operation, and maintenance of a 75-mile-long 500-kilovolt transmission line in Benton and Klickitat Counties, Washington, and Umatilla and Sherman Counties, Oregon. The new line would start at Bonneville's McNary Substation in Oregon and would cross the Columbia River just north of the substation into Washington. The line would then proceed west for about 70 miles along the Columbia River. At the John Day Dam, the line would again cross the Columbia River into Oregon and terminate at Bonneville's John Day Substation. The new line would parallel existing transmission lines for the entire length. Bonneville has available right-of-way next to those lines; the new line would be within the available right-of-way wherever feasible. The proposed McNary-John Day line is needed to help move power from east to west. In accordance with DOE regulations for compliance with floodplain and wetlands environmental review requirements, Bonneville will prepare a floodplain and wetlands assessment as necessary to avoid or minimize potential harm to or within any affected floodplains and wetlands. The assessment will be included in the EIS being prepared for the proposed project in accordance with the National Environmental Policy Act. 2001-05-16 2001 5 https://www.federalregister.gov/documents/2001/05/16/01-12332/mcnary-john-day-transmission-line-project https://www.govinfo.gov/content/pkg/FR-2001-05-16/pdf/01-12332.pdf Energy Department; Bonneville Power Administration 136,40 Bonneville intends to prepare an EIS on the construction, operation, and maintenance of a 75-mile-long 500-kilovolt transmission line in Benton and Klickitat Counties, Washington, and Umatilla and Sherman Counties, Oregon. The new line would start at...

Links from other tables

  • 2 rows from document_number in federal_register_agencies
  • 0 rows from fr_document_number in fr_regs_crossref
Powered by Datasette · Queries took 1.065ms · Data license: Public Domain (U.S. Government data) · Data source: Federal Register API & Regulations.gov API