| 01-12332 | McNary-John Day Transmission Line Project | Notice | Bonneville intends to prepare an EIS on the construction, operation, and maintenance of a 75-mile-long 500-kilovolt transmission line in Benton and Klickitat Counties, Washington, and Umatilla and Sherman Counties, Oregon. The new line would start at Bonneville's McNary Substation in Oregon and would cross the Columbia River just north of the substation into Washington. The line would then proceed west for about 70 miles along the Columbia River. At the John Day Dam, the line would again cross the Columbia River into Oregon and terminate at Bonneville's John Day Substation. The new line would parallel existing transmission lines for the entire length. Bonneville has available right-of-way next to those lines; the new line would be within the available right-of-way wherever feasible. The proposed McNary-John Day line is needed to help move power from east to west. In accordance with DOE regulations for compliance with floodplain and wetlands environmental review requirements, Bonneville will prepare a floodplain and wetlands assessment as necessary to avoid or minimize potential harm to or within any affected floodplains and wetlands. The assessment will be included in the EIS being prepared for the proposed project in accordance with the National Environmental Policy Act. | 2001-05-16 | 2001 | 5 | https://www.federalregister.gov/documents/2001/05/16/01-12332/mcnary-john-day-transmission-line-project | https://www.govinfo.gov/content/pkg/FR-2001-05-16/pdf/01-12332.pdf | Energy Department; Bonneville Power Administration | 136,40 | Bonneville intends to prepare an EIS on the construction, operation, and maintenance of a 75-mile-long 500-kilovolt transmission line in Benton and Klickitat Counties, Washington, and Umatilla and Sherman Counties, Oregon. The new line would start at... |