00-26459 Elk Mound Combustion Turbine Project, Notice of Finding of No Significant Impact Notice Notice is hereby given that the Rural Utilities Service (RUS), pursuant to the National Environmental Policy Act of 1969, as amended, the Council on Environmental Quality regulations (40 CFR parts 1500- 1508), and RUS Environmental Policies and Procedures (7 CFR part 1794), has made a finding of No Significant Impact (FONSI) with respect to a project proposed by Dairyland Power Cooperative (DPC) of La Crosse, Wisconsin. The proposed project will have a total of two combustion turbine units. Each turbine unit will have a maximum rating of 49 MW. DPC proposes to construct the facility in Wheaton Township in Chippewa County, Wisconsin. The site is located adjacent to DPC's Elk Mound Substation, which is located north of Highway 29. The primary purpose of the facility is to meet DPC's peak electrical load. The facility will require approximately 5 acres of land. However, DPC wants to purchase up to 60 acres in order to provide sufficient construction lay-down area and to maintain an appropriate distance between the facility and its neighbors. The primary fuel for the facility will be natural gas that will be obtained from the Viking Gas Transmission Company pipeline that is located approximately 2.2 miles north of the plant site. A 6-inch lateral pipeline will connect the Viking pipeline with the plant site. No new electric transmission lines will be required. RUS has concluded that the impacts from the proposed project would not be significant and that the proposed action is not a major federal action significantly affecting the quality of the human environment. Therefore, the preparation of an environmental impact statement is not necessary. 2000-10-16 2000 10 https://www.federalregister.gov/documents/2000/10/16/00-26459/elk-mound-combustion-turbine-project-notice-of-finding-of-no-significant-impact https://www.govinfo.gov/content/pkg/FR-2000-10-16/pdf/00-26459.pdf Agriculture Department; Rural Utilities Service 12,460 Notice is hereby given that the Rural Utilities Service (RUS), pursuant to the National Environmental Policy Act of 1969, as amended, the Council on Environmental Quality regulations (40 CFR parts 1500- 1508), and RUS Environmental Policies and...

Links from other tables

  • 2 rows from document_number in federal_register_agencies
  • 0 rows from fr_document_number in fr_regs_crossref
Powered by Datasette · Queries took 1.358ms