federal_register: 00-25658
Data license: Public Domain (U.S. Government data) · Data source: Federal Register API & Regulations.gov API
This data as json
| document_number | title | type | abstract | publication_date | pub_year | pub_month | html_url | pdf_url | agency_names | agency_ids | excerpts |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 00-25658 | Withdrawal of Notice of Intent To Prepare a Draft Environmental Impact Statement for the Whitney Point Lake Project Modification, Susquehanna River Basin Water Management Feasibility Study, Broome County, NY | Notice | The U.S. Army Corps of Engineers, Baltimore District, is withdrawing its intent to prepare a Draft Environmental Impact Statement (DEIS) for modification of the Whitney Point Lake, Broome County, New York. The Corps' environmental analyses have not identified any significant adverse impacts associated with the proposed action; therefore, intent to prepare a DEIS is hereby terminated. The Corps is preparing an Environmental Assessment (EA) for the proposed project modification. The draft EA evaluates the elimination of the 7-foot annual winter drawdown and the release of water from the lake for low flow augmentation (drought conditions) for the enhancement of acquatic habitat downstream of the lake, in the Otselic, Tioughnioga, and Chenango River reaches. The Susquehanna River Basin Commission is the non-Federal, cost-sharing partner and is participating in the feasibility study and draft EA development. The goal of this project is to provide for low flow augmentation during drought conditions and reduce the stress upon the aquatic ecosystem. Formulation of the restoration measures focus on examining existing conditions, maximizing potential benefits to the in-lake and downstream aquatic resources, and minimizing impacts to in-lake resources and recreational facilities due to lake drawdowns resulting from low flow augmentation releases. The draft feasibility report and integrated EA is scheduled to be released for a 30-day public review and comment period in October 2000. | 2000-10-06 | 2000 | 10 | https://www.federalregister.gov/documents/2000/10/06/00-25658/withdrawal-of-notice-of-intent-to-prepare-a-draft-environmental-impact-statement-for-the-whitney | https://www.govinfo.gov/content/pkg/FR-2000-10-06/pdf/00-25658.pdf | Defense Department; Engineers Corps | 103,142 | The U.S. Army Corps of Engineers, Baltimore District, is withdrawing its intent to prepare a Draft Environmental Impact Statement (DEIS) for modification of the Whitney Point Lake, Broome County, New York. The Corps' environmental analyses have not... |