00-21754 Tanner Electric Transmission Line Project Notice Bonneville Power Administration (BPA) proposes to construct 7 kilometers (4.5 miles) of new 115-kilovolt (kV) transmission line in King County, Washington, which would supply a new substation to be built by its customer, Tanner Electric Cooperative (Tanner). BPA has prepared an Environmental Assessment (EA) (DOE/EA-1328) evaluating the proposed project. Based on the analysis in the EA, BPA has determined that the proposed action is not a major federal action significantly affecting the quality of the human environment, within the meaning of the National Environmental Policy Act (NEPA) of 1969. Therefore, the preparation of an Environmental Impact Statement (EIS) is not required, and BPA is issuing this FONSI. 2000-08-25 2000 8 https://www.federalregister.gov/documents/2000/08/25/00-21754/tanner-electric-transmission-line-project https://www.govinfo.gov/content/pkg/FR-2000-08-25/pdf/00-21754.pdf Energy Department; Bonneville Power Administration 136,40 Bonneville Power Administration (BPA) proposes to construct 7 kilometers (4.5 miles) of new 115-kilovolt (kV) transmission line in King County, Washington, which would supply a new substation to be built by its customer, Tanner Electric Cooperative...

Links from other tables

  • 2 rows from document_number in federal_register_agencies
  • 0 rows from fr_document_number in fr_regs_crossref
Powered by Datasette · Queries took 1.059ms · Data license: Public Domain (U.S. Government data) · Data source: Federal Register API & Regulations.gov API