00-19091 Notice of Floodplain Involvement for the Blythe Energy Project Notice Western Area Power Administration (Western) has been approached by Wisvest Corporation, a non-regulated subsidiary of Wisconsin Energy Corporation, to interconnect the power to be generated by the Blythe Energy Project (Project) to Western's transmission system. The Project, as proposed, is a 520-megawatt (MW) natural gas- fired thermal power plant that is intended to serve competitive regional markets in southern California and Arizona. The Project is intended as a "merchant plant," which means that the Project would be independent of other generators and that the power generated would serve the open market rather than any particular utility or load. The Project would occupy approximately 15 acres of a 76-acre parcel of private land located just east of the Blythe Airport. Water for cooling and steam generation would be obtained from groundwater wells at approximately 2,200 gallons per minute. The plant would be a "zero discharge" facility, meaning that there would be no wastewater discharge from the plant. Instead, wastewater would be handled by evaporation ponds on site. Natural gas would be fed to the plant by new pipelines that would tap existing major interstate gas pipelines in the vicinity. One option is to pipe gas from the Arizona side of the Colorado River through a new 11.5-mile pipeline. A review of the flood hazard maps for Riverside County, California, indicates that the plant site would reside outside the 100-year floodplain of the Colorado River and McCoy Wash, a nearby intermittent drainage. However, the proposed pipeline route would cross the Colorado River and the Palo Verde Valley just south of the City of Blythe. The crossing of the Colorado River would involve horizontal directional, or microbore drilling, which would place the pipeline under the River. This technique would be used for any crossings of irrigation canals and drains as the pipeline crosses the Valley. In accordance with the U.S. Department of Energy (DOE) Floodplain/ Wetland Review Requirements (10 CFR part 1022), Western will prepare a floodplain assessment and will perform the proposed actions in a manner so as to avoid or minimize potential harm to or within the affected floodplain. The floodplain assessment will be included in the Environmental Assessment/Staff Assessment being prepared jointly by Western and the California Energy Commission on the project, in accordance with the provisions of the DOE National Environmental Policy Act Implementing Procedures (10 CFR part 1021). 2000-07-28 2000 7 https://www.federalregister.gov/documents/2000/07/28/00-19091/notice-of-floodplain-involvement-for-the-blythe-energy-project https://www.govinfo.gov/content/pkg/FR-2000-07-28/pdf/00-19091.pdf Energy Department; Western Area Power Administration 136,525 Western Area Power Administration (Western) has been approached by Wisvest Corporation, a non-regulated subsidiary of Wisconsin Energy Corporation, to interconnect the power to be generated by the Blythe Energy Project (Project) to Western's...

Links from other tables

  • 2 rows from document_number in federal_register_agencies
  • 0 rows from fr_document_number in fr_regs_crossref
Powered by Datasette · Queries took 1.525ms · Data license: Public Domain (U.S. Government data) · Data source: Federal Register API & Regulations.gov API