00-10141 Pleasant Valley Station Plant, Notice of Finding of No Significant Impact Notice Notice is hereby given that the Rural Utilities Service (RUS), pursuant to the National Environmental Policy Act of 1969, as amended, the Council on Environmental Quality regulations (40 CFR parts 1500-1508), and RUS Environmental Policies and Procedures (7 CFR part 1794), has made a Finding of No Significant Impact (FONSI) with respect to a project proposed by Great River Energy (GRE) of Elk River, Minnesota. The proposed project will have a total of three combustion turbine units, two 155 MW and one 124 MW unit, including a new 345/161 kV substation and other associated transmission facilities. The proposed plant will be constructed in the Pleasant Valley Township in Mower County, Minnesota. The construction site is located in the northwest quarter of Section 19, Pleasant Valley Township, Mower County, Minnesota. The primary purpose of the facility is to meet GRE?s peak electrical load. The facility will require approximately 24 acres of land. However, GRE wants to purchase up to 160 acres in order to provide sufficient construction lay-down area and to maintain an appropriate distance between the facility and its neighbors. The primary fuel for the facility will be natural gas via the Northern Natural Gas (NNG) pipeline. Presently the NNG pipeline is located approximately two miles north from the plant site. The power generated from the facility will be distributed through a new substation, which will be built on the plant site; a short tap line, approximately 500 feet in length, to an existing 345-kV transmission line. In addition, a 161-kV transmission line will be built to an existing substation located in north Austin. Between five and seven miles of the 161-kV line will need a new rights-of-way; much of the remainder of the transmission line, approximately 17 miles long, will follow an existing 69-kV transmission line. RUS has concluded that the impacts from the proposed project would not be significant and that the proposed action is not a major federal action significantly affecting the quality of the human environment. Therefore, an Environmental Impact Statement will not be prepared. 2000-04-24 2000 4 https://www.federalregister.gov/documents/2000/04/24/00-10141/pleasant-valley-station-plant-notice-of-finding-of-no-significant-impact https://www.govinfo.gov/content/pkg/FR-2000-04-24/pdf/00-10141.pdf Agriculture Department; Rural Utilities Service 12,460 Notice is hereby given that the Rural Utilities Service (RUS), pursuant to the National Environmental Policy Act of 1969, as amended, the Council on Environmental Quality regulations (40 CFR parts 1500-1508), and RUS Environmental Policies and...

Links from other tables

  • 2 rows from document_number in federal_register_agencies
  • 0 rows from fr_document_number in fr_regs_crossref
Powered by Datasette · Queries took 1.091ms · Data license: Public Domain (U.S. Government data) · Data source: Federal Register API & Regulations.gov API