id,agency_id,docket_id,title,document_type,subtype,posted_date,posted_year,posted_month,comment_start_date,comment_end_date,last_modified,fr_doc_num,open_for_comment,withdrawn,object_id EPA-HQ-OAR-2003-0177-0230,EPA,EPA-HQ-OAR-2003-0177,Correspondence between EPA/F. Marcinowski and DOE/I. Triay Regarding Installation of the OMNISita Astrophysics Experiment [A-98-49-II-B3-20],Supporting & Related Material,Letter,2023-11-20T05:00:00Z,2023,11,,,2023-11-20T17:15:25Z,,0,0,0900006484977ff4 EPA-HQ-OAR-2003-0177-0229,EPA,EPA-HQ-OAR-2003-0177,Correspondence Between EPA/F. Marcinowski and DOE/I. Triay Regarding Changes for Panel 1 Utilization at WIPP [A-98-49-II-B3-19],Supporting & Related Material,Publication - Copyrighted Materials,2023-11-20T05:00:00Z,2023,11,,,2023-11-20T17:15:24Z,,0,0,0900006484977ff3 EPA-HQ-OAR-2003-0177-0218,EPA,EPA-HQ-OAR-2003-0177,"Letter/DOE/I. Triay to EPA/S. Page, Transmitting Annual WIPP Change Report Under 40 CFR 194.4 [A-98-49-II-B2-8]",Supporting & Related Material,Letter,2023-11-20T05:00:00Z,2023,11,,,2023-11-20T17:15:15Z,,0,0,0900006484978284 EPA-HQ-OAR-2003-0177-0222,EPA,EPA-HQ-OAR-2003-0177,"Letter/EPA/F. Marcinowski to DOE/I. Triay, Transmitting Reports for Inspection nos. (A) EPA-WIPP-6.00-191A, (B) EPA-WIPP-6.00-21 (monitoring), and (C) EPA-WIPP-6.00-21A (waste emplacement) [A-98-49-II-B3-12]",Supporting & Related Material,Letter,2023-11-20T05:00:00Z,2023,11,,,2023-11-20T17:15:19Z,,0,0,0900006484977fec EPA-HQ-OAR-2003-0177-0224,EPA,EPA-HQ-OAR-2003-0177,Letter/EPA/F. Marcinowski to DOE/I. Triay. Transmitting Recertification Guidance [A-98-49-II-B3-14],Supporting & Related Material,Letter,2023-11-20T05:00:00Z,2023,11,,,2023-11-20T17:15:20Z,,0,0,0900006484977fee EPA-HQ-OAR-2003-0177-0231,EPA,EPA-HQ-OAR-2003-0177,Correspondence between EPA/F. Marcinowski and DOE/I. Triay Regarding Installation of the Majorana Project Experiment [A-98-49-II-B3-21],Supporting & Related Material,Letter,2023-11-20T05:00:00Z,2023,11,,,2023-11-20T17:15:25Z,,0,0,0900006484977ff5 EPA-HQ-OAR-2003-0177-0219,EPA,EPA-HQ-OAR-2003-0177,Letter/DOE/M. McFadden to EP AIM. Kruger re: Response to Findings of Inspections EPA-SNL-9.98-21 and EPA-LANL-9.98-21 [A-98-49-II-B3-9],Supporting & Related Material,Letter,2023-11-20T05:00:00Z,2023,11,,,2023-11-20T17:15:15Z,,0,0,0900006484977fe9 EPA-HQ-OAR-2003-0177-0221,EPA,EPA-HQ-OAR-2003-0177,Letter/EPA/F. Marcinowski to DOE/I. Triay - EPA Conclusions on Changes Reported by DOE in Accordance with 194.4 [A-98-49-II-B3-11],Supporting & Related Material,Letter,2023-11-20T05:00:00Z,2023,11,,,2023-11-20T17:15:18Z,,0,0,0900006484977feb EPA-HQ-OAR-2003-0177-0225,EPA,EPA-HQ-OAR-2003-0177,"Letter/EPA/F. Marcinowski to DOE/I. Triay, Transmitting Report on Proposed Elimination of Magnesium Oxide Backfill Minisacks [A-98-49-II-B3-15]",Supporting & Related Material,Letter,2023-11-20T05:00:00Z,2023,11,,,2023-11-20T17:15:21Z,,0,0,0900006484977fef EPA-HQ-OAR-2003-0177-0220,EPA,EPA-HQ-OAR-2003-0177,Letter/DOE/S. Vega to EPA/M. Kruger re: Response to Findings of Inspection EPA-RFETS-3. 99-22 [A-98-49-II-B3-10],Supporting & Related Material,Letter,2023-11-20T05:00:00Z,2023,11,,,2023-11-20T17:15:17Z,,0,0,0900006484977fea EPA-HQ-OAR-2003-0177-0223,EPA,EPA-HQ-OAR-2003-0177,Letter/EPA/F. Marcinowski to DOE/ I. Triay Transmitting Comments on Wipp Waste Acceptance Criteria Rev. 7 [A-98-49-II-B3-13],Supporting & Related Material,Letter,2023-11-20T05:00:00Z,2023,11,,,2023-11-20T17:15:19Z,,0,0,0900006484977fed EPA-HQ-OAR-2003-0177-0214,EPA,EPA-HQ-OAR-2003-0177,Letter/DOE/K. Klein to EPA/S. Page Notification of First Receipt of Waste at WIPP [A-98-49-II-B2-4],Supporting & Related Material,Letter,2023-11-20T05:00:00Z,2023,11,,,2023-11-20T17:15:12Z,,0,0,0900006484978280 EPA-HQ-OAR-2003-0177-0213,EPA,EPA-HQ-OAR-2003-0177,"Letter/DOE/K. Klein to EPA/S. Page, Notification in Accordance with 40 CFR Part 191, Subpart A, Potential Initiation of WIPP Operation [A-98-49-II-B2-3]",Supporting & Related Material,Letter,2023-11-20T05:00:00Z,2023,11,,,2023-11-20T17:15:11Z,,0,0,090000648497827f EPA-HQ-OAR-2003-0177-0216,EPA,EPA-HQ-OAR-2003-0177,Letter/DOE/I. Triay to EPA/S. Page Submitting the Required 6-Month Report of Non-Significant Changes in Activities or Conditions at WIPP [A-98-49-II-B2-6],Supporting & Related Material,Letter,2023-11-20T05:00:00Z,2023,11,,,2023-11-20T17:15:13Z,,0,0,0900006484978282 EPA-HQ-OAR-2003-0177-0227,EPA,EPA-HQ-OAR-2003-0177,"Letter/EPA/F. Marcinowski to DOE/I. Triay, Transmitting Report on STTP [A-98-49-II-B3-17]",Supporting & Related Material,Publication - Copyrighted Materials,2023-11-20T05:00:00Z,2023,11,,,2023-11-20T17:15:22Z,,0,0,0900006484977ff1 EPA-HQ-OAR-2003-0177-0226,EPA,EPA-HQ-OAR-2003-0177,Letter/EPA/F. Marcinowski to DOE/I. Triay re: Upcoming QA Inspection of CBFO [A-98-49-II-B3-16],Supporting & Related Material,,2023-11-20T05:00:00Z,2023,11,,,2023-11-20T17:15:22Z,,0,0,0900006484977ff0 EPA-HQ-OAR-2003-0177-0228,EPA,EPA-HQ-OAR-2003-0177,"Letter/EPA/F. Marcinowski to DOE/I. Triay, Transmitting Reports for Inspection Nos. (A) EPA-WIPP-6.01-21a (Subpart A), (B) EPA-WIPP6.0 l-2lb (waste emplacement), and (C) EPA-WIPP-6.0l -2c (monitoring) [A-98-49-II-B3-18]",Supporting & Related Material,Report,2023-11-20T05:00:00Z,2023,11,,,2023-11-20T17:15:23Z,,0,0,0900006484977ff2 EPA-HQ-OAR-2003-0177-0215,EPA,EPA-HQ-OAR-2003-0177,Letter/DOE/K. Klein to EPA/S. Page Providing Additional Information Requested by EPA on Changes Reported in Accordance with 194.4 [A-98-49-II-B2-5],Supporting & Related Material,Letter,2023-11-20T05:00:00Z,2023,11,,,2023-11-20T17:15:12Z,,0,0,0900006484978281 EPA-HQ-OAR-2003-0177-0217,EPA,EPA-HQ-OAR-2003-0177,"Letter/DOE/I. Triay to EPA/ F. Marcinowski, Transmitting Information on STTP [A-98-49-II-B2-7]",Supporting & Related Material,Publication - Copyrighted Materials,2023-11-20T05:00:00Z,2023,11,,,2023-11-20T17:15:14Z,,0,0,0900006484978283 EPA-HQ-OAR-2003-0177-0200,EPA,EPA-HQ-OAR-2003-0177,"Ltr/DOE/I. Triay to EPA/E. Cotsworth, Transmitting Annual WIPP Change Report Under 40 CFR 194.4 [A-98-49-II-B2-16]",Supporting & Related Material,Letter,2023-11-13T05:00:00Z,2023,11,,,2023-11-13T18:23:51Z,,0,0,090000648497828c EPA-HQ-OAR-2003-0177-0191,EPA,EPA-HQ-OAR-2003-0177,Letter/DOE-CAO/K. Klein to EPA/S. Page Regarding Notification of Startup [A-98-49-II-B2-1],Supporting & Related Material,Letter,2023-11-13T05:00:00Z,2023,11,,,2023-11-13T18:23:45Z,,0,0,090000648497827d EPA-HQ-OAR-2003-0177-0199,EPA,EPA-HQ-OAR-2003-0177,"Ltr/DOE/I. Triay to EPA/F. Marcinowski, DOE Evaluation of the Impact of Super compacted Wastes from the Advanced Mixed Waste Treatment Project (AMWTP) on the Long-Term Performance of the WIPP [A-98-49-II-B2-15]",Supporting & Related Material,Letter,2023-11-13T05:00:00Z,2023,11,,,2023-11-13T18:23:50Z,,0,0,090000648497828b EPA-HQ-OAR-2003-0177-0172,EPA,EPA-HQ-OAR-2003-0177,"Letter/EPA/F. Marcinowski to DOE/I. Triay, Transmitting Report for Inspection No. EPA-INEEL-7.01-8 [A-98-49-II-A4-17]",Supporting & Related Material,Letter,2023-11-13T05:00:00Z,2023,11,,,2023-11-13T18:23:32Z,,0,0,090000648497826a EPA-HQ-OAR-2003-0177-0181,EPA,EPA-HQ-OAR-2003-0177,"Letter/EPA/F. Marcinowski to DOE/I. Triay, Transmitting Report for Inspection No. EPA-ANL-E-CCP-9.02-8 [A-98-49-II-A4-26]",Supporting & Related Material,Letter,2023-11-13T05:00:00Z,2023,11,,,2023-11-13T18:23:38Z,,0,0,0900006484978273 EPA-HQ-OAR-2003-0177-0197,EPA,EPA-HQ-OAR-2003-0177,"Ltr/DOE/I. Triay to EPA/F. Marcinowski, Transmitting Requests for Approval Regarding Two Issues (radiography and wastes containing classified materials) at WIPP [A-98-49-II-B2-13]",Supporting & Related Material,Letter,2023-11-13T05:00:00Z,2023,11,,,2023-11-13T18:23:49Z,,0,0,0900006484978289 EPA-HQ-OAR-2003-0177-0206,EPA,EPA-HQ-OAR-2003-0177,Ltr/EP A/S. Page to DOE/K. Klein Requesting Additional Information on DOE's 6-Month Report of Changes (See item 11-B2-2) [A-98-49-II-B3-2],Supporting & Related Material,Letter,2023-11-13T05:00:00Z,2023,11,,,2023-11-13T18:23:55Z,,0,0,0900006484978292 EPA-HQ-OAR-2003-0177-0176,EPA,EPA-HQ-OAR-2003-0177,"Letter/EPA/F. Marcinowski to DOE/I. Triay, Transmitting Report for Inspection No. EPA-lNEEL-4.02-8 [A-98-49-II-A4-21]",Supporting & Related Material,Letter,2023-11-13T05:00:00Z,2023,11,,,2023-11-13T18:23:34Z,,0,0,090000648497826e EPA-HQ-OAR-2003-0177-0174,EPA,EPA-HQ-OAR-2003-0177,"Letter/EPA/F. Marcinowski to DOE/I. Triay, Transmitting Report for Inspection No. EPA-CCP-10.01-8 [A-98-49-II-A4-19]",Supporting & Related Material,Letter,2023-11-13T05:00:00Z,2023,11,,,2023-11-13T18:23:33Z,,0,0,090000648497826c EPA-HQ-OAR-2003-0177-0195,EPA,EPA-HQ-OAR-2003-0177,"Ltr/DOE/I. Triay to EPA/F. Marcinowski, Transmitting Annual WIPP Change Report Under 40 CFR 194.4 [A-98-49-II-B2-11]",Supporting & Related Material,Letter,2023-11-13T05:00:00Z,2023,11,,,2023-11-13T18:23:48Z,,0,0,0900006484978287 EPA-HQ-OAR-2003-0177-0184,EPA,EPA-HQ-OAR-2003-0177,"Letter/EPA/F. Marcinowski to DOE/I. Triay, re: Inspection No. EPA-SRS-12.01-8 [A-98-49-II-A4-29]",Supporting & Related Material,Letter,2023-11-13T05:00:00Z,2023,11,,,2023-11-13T18:23:40Z,,0,0,0900006484978276 EPA-HQ-OAR-2003-0177-0202,EPA,EPA-HQ-OAR-2003-0177,"Ltr/DOE/ to EPA/F. Marcinowski, Transmitting First Quarterly Report on Number of Classified Waste Drums Emplaced in the WIPP (period of 2/11/03 to 6/30/03) [A-98-49-II-B2-18]",Supporting & Related Material,Letter,2023-11-13T05:00:00Z,2023,11,,,2023-11-13T18:23:52Z,,0,0,090000648497828e EPA-HQ-OAR-2003-0177-0210,EPA,EPA-HQ-OAR-2003-0177,Federal Register Notice - Determination of the Waste Isolation Pilot Plant's Compliance with Applicable Federal Environmental Laws for the Period Oct. 1996-0ct. I 998 [A-98-49-II-B3-6],Supporting & Related Material,Publication - Previous/Related FR Notice,2023-11-13T05:00:00Z,2023,11,,,2023-11-13T18:23:58Z,,0,0,0900006484978296 EPA-HQ-OAR-2003-0177-0178,EPA,EPA-HQ-OAR-2003-0177,"Letter/EPA/F. Marcinowski to DOE/I. Triay, Transmitting Report for Inspection No. EPA-LANL-2.02-8 [A-98-49-II-A4-23]",Supporting & Related Material,Letter,2023-11-13T05:00:00Z,2023,11,,,2023-11-13T18:23:36Z,,0,0,0900006484978270 EPA-HQ-OAR-2003-0177-0207,EPA,EPA-HQ-OAR-2003-0177,"Ltr/EP A/S. Page to DOE/I. Triay, EPA Conclusions on Changes Reported by DOE in Accordance with 194.4 [A-98-49-II-B3-3]",Supporting & Related Material,Letter,2023-11-13T05:00:00Z,2023,11,,,2023-11-13T18:23:56Z,,0,0,0900006484978293 EPA-HQ-OAR-2003-0177-0211,EPA,EPA-HQ-OAR-2003-0177,"Ltr/EP A/C. Browner to DOE/F. Pena re: Determination of Compliance Under Section 9 of the L WA, With Associated Federal Register Notice [A-98-49-II-B3-7]",Supporting & Related Material,Letter,2023-11-13T05:00:00Z,2023,11,,,2023-11-13T18:23:59Z,,0,0,0900006484978297 EPA-HQ-OAR-2003-0177-0170,EPA,EPA-HQ-OAR-2003-0177,"Letter/EPA/F. Marcinowski to DOE/I. Triay, Transmitting Report for Inspection No. EPA-INEEL-12.00-8 [A-98-49-II-A4-15]",Supporting & Related Material,Letter,2023-11-13T05:00:00Z,2023,11,,,2023-11-13T18:23:30Z,,0,0,0900006484978268 EPA-HQ-OAR-2003-0177-0186,EPA,EPA-HQ-OAR-2003-0177,"Letter to Ines Triay, Manager, US Department of Energy regarding The Environmental Protection Agency's (EPA) inspection report for inspection no. EPARFETS-3.03-24 of the Rocky Flats Environmental Technology Site (RFETS) is enclosed. [A-98-49-II-A4-31]",Supporting & Related Material,Letter,2023-11-13T05:00:00Z,2023,11,,,2023-11-13T18:23:42Z,,0,0,0900006484978278 EPA-HQ-OAR-2003-0177-0173,EPA,EPA-HQ-OAR-2003-0177,"Letter/EPA/F. Marcinowski to DOE/I. Triay, Transmitting Report for Inspection No. EPA-RFETS-5.01-8 [A-98-49-II-A4-18]",Supporting & Related Material,Letter,2023-11-13T05:00:00Z,2023,11,,,2023-11-13T18:23:32Z,,0,0,090000648497826b EPA-HQ-OAR-2003-0177-0188,EPA,EPA-HQ-OAR-2003-0177,"Letter/EPA/F. Marcinowski to DOE/I. Triay, Transmitting EPA Conclusions Regarding Inspection No. EPA-HAN-6.03-24 to Evaluate Additional Calorimeters to Characterize Waste [A-98-49-II-A4-33]",Supporting & Related Material,Letter,2023-11-13T05:00:00Z,2023,11,,,2023-11-13T18:23:43Z,,0,0,090000648497827a EPA-HQ-OAR-2003-0177-0209,EPA,EPA-HQ-OAR-2003-0177,"Ltr/EPA/C. Browner to DOE/W. Richardson Stating that for the Period Oct. 1996 to Oct. 1998 that DOE was in Compliance with Federal Regulations, and Permit Requirements Designated in Section 9(a)(l) of the WIPP Land Withdrawal Act [A-98-49-II-B3-5]",Supporting & Related Material,Letter,2023-11-13T05:00:00Z,2023,11,,,2023-11-13T18:23:57Z,,0,0,0900006484978295 EPA-HQ-OAR-2003-0177-0192,EPA,EPA-HQ-OAR-2003-0177,Letter/DOE/M. McFadden to EPA/L. Weinstock Submitting the Required 6-Month Report of Non-Significant Changes in Activities or Conditions at WIPP (Previously filed as II-A2-8) [A-98-49-II-B2-2],Supporting & Related Material,Letter,2023-11-13T05:00:00Z,2023,11,,,2023-11-13T18:23:46Z,,0,0,090000648497827e EPA-HQ-OAR-2003-0177-0204,EPA,EPA-HQ-OAR-2003-0177,"Ltr/DOE/I. Triay to EPA/F. Marcinowski, Transmitting Notice of Proposed Change to Receive and Dispose of Remote-Handled (RH) Transuranic (TRU) Waste at the WIPP (Rev. OD) [A-98-49-II-B2-21]",Supporting & Related Material,Letter,2023-11-13T05:00:00Z,2023,11,,,2023-11-13T18:23:53Z,,0,0,0900006484978290 EPA-HQ-OAR-2003-0177-0179,EPA,EPA-HQ-OAR-2003-0177,"Letter/EPA/F. Marcinowski to DOE/I. Triay, Transmitting Report for Inspection No. EPA-RFETS-6.02-8 [A-98-49-II-A4-24]",Supporting & Related Material,Letter,2023-11-13T05:00:00Z,2023,11,,,2023-11-13T18:23:36Z,,0,0,0900006484978271 EPA-HQ-OAR-2003-0177-0190,EPA,EPA-HQ-OAR-2003-0177,"Summary of EPA/DOE Meeting Regarding WIPP Held on July 24-25, 2001 [A-98-49-II-B1-2]",Supporting & Related Material,Meeting Materials,2023-11-13T05:00:00Z,2023,11,,,2023-11-13T18:23:44Z,,0,0,090000648497827c EPA-HQ-OAR-2003-0177-0193,EPA,EPA-HQ-OAR-2003-0177,"Ltr/DOE/S. Vega to EPA/S. Monroe, Transmitting Westinghouse TRU Solutions (WTS) Central Characterization Program (CCP) documents for Savannah River Site (SRS) (This item has been moved to II-A2-34 [A-98-49-II-B2-9]",Supporting & Related Material,Letter,2023-11-13T05:00:00Z,2023,11,,,2023-11-13T18:23:46Z,,0,0,0900006484978285 EPA-HQ-OAR-2003-0177-0171,EPA,EPA-HQ-OAR-2003-0177,"Letter/EPA/F. Marcinowski to DOE/I. Triay, Transmitting Report for Inspection No. EPA-SRS-11.00-8 [A-98-49-II-A4-16]",Supporting & Related Material,Letter,2023-11-13T05:00:00Z,2023,11,,,2023-11-13T18:23:31Z,,0,0,0900006484978269 EPA-HQ-OAR-2003-0177-0183,EPA,EPA-HQ-OAR-2003-0177,"Letter/EPA/F. Marcinowski to DOE/I. Triay, Transmitting Report for Inspection No. EPA-LANL-8.02-8 [A-98-49-II-A4-28]",Supporting & Related Material,Letter,2023-11-13T05:00:00Z,2023,11,,,2023-11-13T18:23:39Z,,0,0,0900006484978275 EPA-HQ-OAR-2003-0177-0201,EPA,EPA-HQ-OAR-2003-0177,"Ltr/DOE/I.Triay to EPA/F. Marcinowski, Transmitting Additional Information Requested Regarding the Annual WIPP Change Report [A-98-49-II-B2-17]",Supporting & Related Material,Letter,2023-11-13T05:00:00Z,2023,11,,,2023-11-13T18:23:51Z,,0,0,090000648497828d EPA-HQ-OAR-2003-0177-0208,EPA,EPA-HQ-OAR-2003-0177,Ltr/S. Page to DOE/I. Triay Transmitting Inspection Reports on Subpart A and Monitoring [A-98-49-II-B3-4],Supporting & Related Material,Letter,2023-11-13T05:00:00Z,2023,11,,,2023-11-13T18:23:57Z,,0,0,0900006484978294 EPA-HQ-OAR-2003-0177-0182,EPA,EPA-HQ-OAR-2003-0177,"Letter/EPA/F. Marcinowski to DOE/I. Triay, Transmitting Report for Inspection No. EPA-NTS-CCP-9.02-8 [A-98-49-II-A4-27]",Supporting & Related Material,Letter,2023-11-13T05:00:00Z,2023,11,,,2023-11-13T18:23:38Z,,0,0,0900006484978274 EPA-HQ-OAR-2003-0177-0187,EPA,EPA-HQ-OAR-2003-0177,"Letter/EPA/F. Marcinowski to DOE/I. Triay, Transmitting Report for Inspection No. EPA-HAN-8.03-8 (and 8.03-24) [A-98-49-II-A4-32]",Supporting & Related Material,Letter,2023-11-13T05:00:00Z,2023,11,,,2023-11-13T18:23:42Z,,0,0,0900006484978279 EPA-HQ-OAR-2003-0177-0203,EPA,EPA-HQ-OAR-2003-0177,"Ltr/DOE/I. Triay to EPA/F. Marcinowski, Transmitting Notice of Proposed Change to Receive and Dispose of Remote-Nandled (RH) Transuranic (TRU) Waste at the WIPP (Rev. 0A) [A-98-49-II-B2-19]",Supporting & Related Material,Letter,2023-11-13T05:00:00Z,2023,11,,,2023-11-13T18:23:53Z,,0,0,090000648497828f EPA-HQ-OAR-2003-0177-0169,EPA,EPA-HQ-OAR-2003-0177,"Letter/EPA/F. Marcinowski to DOE/I. Triay, Transmitting Report for Inspection No. EPA-RFETS-9.00-8 [A-98-49-II-A4-14]",Supporting & Related Material,Letter,2023-11-13T05:00:00Z,2023,11,,,2023-11-13T18:23:30Z,,0,0,0900006484978267 EPA-HQ-OAR-2003-0177-0185,EPA,EPA-HQ-OAR-2003-0177,"Letter/EPA/F. Marcinowski to DOE/I. Triay, Transmitting Report for Inspection No. EPA-ANL-E-CCP-2.03-8 [A-98-49-II-A4-30]",Supporting & Related Material,Letter,2023-11-13T05:00:00Z,2023,11,,,2023-11-13T18:23:41Z,,0,0,0900006484978277 EPA-HQ-OAR-2003-0177-0196,EPA,EPA-HQ-OAR-2003-0177,"Ltr/DOE/I. Triay to EPA/F. Marcinowski, Transmitting Additional Information Requested Regarding the Annual WIPP Change Report [A-98-49-II-B2-12]",Supporting & Related Material,Publication - Copyrighted Materials,2023-11-13T05:00:00Z,2023,11,,,2023-11-13T18:23:48Z,,0,0,0900006484978288 EPA-HQ-OAR-2003-0177-0205,EPA,EPA-HQ-OAR-2003-0177,Ltr/EPA/L. Weinstock to DOE/M. McFadden. Guidance on EPA's Preferred Format for Receipt of 6-Month of Changes in Activities of Conditions at WIPP [A-98-49-II-B3-1],Supporting & Related Material,Letter,2023-11-13T05:00:00Z,2023,11,,,2023-11-13T18:23:55Z,,0,0,0900006484978291 EPA-HQ-OAR-2003-0177-0175,EPA,EPA-HQ-OAR-2003-0177,"Letter/EPA/F. Marcinowski to DOE/I. Triay, Transmitting Report for Inspection No. EPA-HAN-12.01-8 [A-98-49-II-A4-20]",Supporting & Related Material,Letter,2023-11-13T05:00:00Z,2023,11,,,2023-11-13T18:23:34Z,,0,0,090000648497826d EPA-HQ-OAR-2003-0177-0194,EPA,EPA-HQ-OAR-2003-0177,"Ltr/DOE/I. Triay to EP AIM. Kruger, Transmitting WIPP Biennial Environmental Compliance Report (BECR), October 2000 [A-98-49-II-B2-10]",Supporting & Related Material,Report,2023-11-13T05:00:00Z,2023,11,,,2023-11-13T18:23:47Z,,0,0,0900006484978286 EPA-HQ-OAR-2003-0177-0198,EPA,EPA-HQ-OAR-2003-0177,"Ltr/DOE/I. Triay to EPA/F. Marcinowski, Transmitting WIPP Biennial Environmental Compliance Report (BECR), October 2002 [A-98-49-II-B2-14]",Supporting & Related Material,Report,2023-11-13T05:00:00Z,2023,11,,,2023-11-13T18:23:49Z,,0,0,090000648497828a EPA-HQ-OAR-2003-0177-0177,EPA,EPA-HQ-OAR-2003-0177,"Letter/EPA/F. Marcinowski to DOE/I. Triay, Transmitting Report for Inspection No. EPA-SRS-12.0 I-8 [A-98-49-II-A4-22]",Supporting & Related Material,Letter,2023-11-13T05:00:00Z,2023,11,,,2023-11-13T18:23:35Z,,0,0,090000648497826f EPA-HQ-OAR-2003-0177-0189,EPA,EPA-HQ-OAR-2003-0177,"Letter/EPA/F. Marcinowski to DOE/G. Basabilvazo Transmitting Report for EPA Inspection No. EPA-WIPP-9.99-21 at the WIPP Site, W/Enclosed Report [A-98-49-II-B1-1]",Supporting & Related Material,Letter,2023-11-13T05:00:00Z,2023,11,,,2023-11-13T18:23:44Z,,0,0,090000648497827b EPA-HQ-OAR-2003-0177-0180,EPA,EPA-HQ-OAR-2003-0177,"Letter/EPA/F. Marcinowski to DOE/I. Triay, Transmitting Report for Inspection No. EPA-HAN-6.02-8 [A-98-49-II-A4-25]",Supporting & Related Material,Letter,2023-11-13T05:00:00Z,2023,11,,,2023-11-13T18:23:37Z,,0,0,0900006484978272 EPA-HQ-OAR-2003-0177-0212,EPA,EPA-HQ-OAR-2003-0177,Ltr/EP A/S. Page to DOE/I. Triay re: January 2000 Audit of CAO [A-98-49-II-B3-8],Supporting & Related Material,Letter,2023-11-13T05:00:00Z,2023,11,,,2023-11-13T18:23:59Z,,0,0,0900006484978298 EPA-HQ-OAR-2003-0177-0151,EPA,EPA-HQ-OAR-2003-0177,"Correspondence between EPA/M. Kruger, S. Monroe and EEG/Robert Neill Regarding EEG Comments on the TRUtech Team Mobile System Program (TRU Characterization Quality Assurance Project Plan [QAPjP]) [A-98-49-II-A3-31]",Supporting & Related Material,Letter,2023-09-05T04:00:00Z,2023,9,,,2023-09-05T15:04:03Z,,0,0,0900006484978254 EPA-HQ-OAR-2003-0177-0160,EPA,EPA-HQ-OAR-2003-0177,"Report, EPA Inspection No. EPA-RFETS-6.98-8 of Rocky Flats Environmental Technology Site, June 22-25, I 998 [A-98-49-II-A4-4]",Supporting & Related Material,Report,2023-09-05T04:00:00Z,2023,9,,,2023-09-05T15:04:10Z,,0,0,090000648497825e EPA-HQ-OAR-2003-0177-0167,EPA,EPA-HQ-OAR-2003-0177,"Ltr/EPA/F. Marcinowski to DOE/I. Triay, Transmitting QA Report for EPA Inspection No. EPA-HAN-1.00-8, January 24-28, 2000 [A-98-49-II-A4-11]",Supporting & Related Material,Letter,2023-09-05T04:00:00Z,2023,9,,,2023-09-05T15:04:14Z,,0,0,0900006484978265 EPA-HQ-OAR-2003-0177-0168,EPA,EPA-HQ-OAR-2003-0177,"Ltr/EPA/F. Marcinowski to DOE/I. Triay, Transmitting Report for Inspection No. EPA-HAN-1.00-8 [A-98-49-II-A4-12]",Supporting & Related Material,Letter,2023-09-05T04:00:00Z,2023,9,,,2023-09-05T15:04:15Z,,0,0,0900006484978266 EPA-HQ-OAR-2003-0177-0149,EPA,EPA-HQ-OAR-2003-0177,Ltr/D. Hancock to EPA/ Air Docket re: comments on WIPP/INEEL/W AGS procedures and additional documentation [A-98-49-II-A3-29],Supporting & Related Material,Letter,2023-09-05T04:00:00Z,2023,9,,,2023-09-05T15:04:02Z,,0,0,0900006484978252 EPA-HQ-OAR-2003-0177-0156,EPA,EPA-HQ-OAR-2003-0177,Ltr/EPA/F. Marcinowski to P. Blockey-O'Brien re: Comments to Administrator Whitman regarding DOE-NNSA's Proposal for a Plutonium Modem Pit Facility (MPF) [A-98-49-II-A3-36],Supporting & Related Material,Letter,2023-09-05T04:00:00Z,2023,9,,,2023-09-05T15:04:07Z,,0,0,0900006484978259 EPA-HQ-OAR-2003-0177-0154,EPA,EPA-HQ-OAR-2003-0177,"Ltr/EPA/E. Cotsworth to DOE/NNSA/J. Rose, re: comments regarding the ""Notice of Intent to Prepare a Supplemental Programmatic Environmental Impact Statement on Stockpile Stewardship and Management for a Modem Pit Facility"" [A-98-49-II-A3-34]",Supporting & Related Material,Letter,2023-09-05T04:00:00Z,2023,9,,,2023-09-05T15:04:05Z,,0,0,0900006484978257 EPA-HQ-OAR-2003-0177-0158,EPA,EPA-HQ-OAR-2003-0177,"Report, EPA Inspection No. EPA-INEEL-7 .98-8 of Idaho's National Engineering and Environmental Laboratory, July 28-30, I 998 [A-98-49-II-A4-2]",Supporting & Related Material,Report,2023-09-05T04:00:00Z,2023,9,,,2023-09-05T15:04:09Z,,0,0,090000648497825c EPA-HQ-OAR-2003-0177-0162,EPA,EPA-HQ-OAR-2003-0177,"Report, EPA Inspection No. EPA-RFETS-4.99-8 of Rocky Flats Environmental Technology Site, April 27-28, 1999 [A-98-49-II-A4-6]",Supporting & Related Material,Report,2023-09-05T04:00:00Z,2023,9,,,2023-09-05T15:04:11Z,,0,0,0900006484978260 EPA-HQ-OAR-2003-0177-0153,EPA,EPA-HQ-OAR-2003-0177,"Ltr/EPA/F. Marcinowski to DOE/I. Triay, Responding to Inspection Findings Regarding Borehole Handling and Storage [A-98-49-II-A3-33]",Supporting & Related Material,Letter,2023-09-05T04:00:00Z,2023,9,,,2023-09-05T15:04:05Z,,0,0,0900006484978256 EPA-HQ-OAR-2003-0177-0157,EPA,EPA-HQ-OAR-2003-0177,"Ltr/EPA/S. Page to DOE/CAO/K. Klein Transmitting EPA Inspection Report No. EPA-INEEL-7.98-8 of the Inspection of the Idaho National Engineering and Environmental Laboratory, July 28-30, 1998 [A-98-49-II-A4-1]",Supporting & Related Material,Letter,2023-09-05T04:00:00Z,2023,9,,,2023-09-05T15:04:07Z,,0,0,090000648497825b EPA-HQ-OAR-2003-0177-0155,EPA,EPA-HQ-OAR-2003-0177,"Ltr/EPA/F. Marcinowski to DOE/I. Triay, Transmitting Request to Perform Quality Assurance (QA) Audit of CBFO in Accordance with 194.22(a) [A-98-49-II-A3-35]",Supporting & Related Material,Letter,2023-09-05T04:00:00Z,2023,9,,,2023-09-05T15:04:06Z,,0,0,0900006484978258 EPA-HQ-OAR-2003-0177-0166,EPA,EPA-HQ-OAR-2003-0177,"Ltr/EPA/F. Marcinowski to DOE/R. Stroud Transmitting Report for EPA Inspection No. EPA-RFETS-11.99-8, November 16-18, 1999 [A-98-49-II-A4-10]",Supporting & Related Material,Letter,2023-09-05T04:00:00Z,2023,9,,,2023-09-05T15:04:13Z,,0,0,0900006484978264 EPA-HQ-OAR-2003-0177-0164,EPA,EPA-HQ-OAR-2003-0177,"Ltr/EPA/S. Page to DOE/I. Triay, re: Inspection No. EPA-INEEL- 5.99-8 [A-98-49-II-A4-8]",Supporting & Related Material,Letter,2023-09-05T04:00:00Z,2023,9,,,2023-09-05T15:04:12Z,,0,0,0900006484978262 EPA-HQ-OAR-2003-0177-0148,EPA,EPA-HQ-OAR-2003-0177,Ltr/EPA/F. Marcinowski to D. Hancock et. al re: Extension of Public Comment Period for WIPP/INEEL/W AGS Procedures [A-98-49-II-A3-28],Supporting & Related Material,Letter,2023-09-05T04:00:00Z,2023,9,,,2023-09-05T15:04:02Z,,0,0,0900006484978251 EPA-HQ-OAR-2003-0177-0161,EPA,EPA-HQ-OAR-2003-0177,"Ltr/EPA/S. Page to DOE/I. Triay, Transmitting Report for EPA Inspection No. EPA-RFETS-4.99-8 [A-98-49-II-A4-5]",Supporting & Related Material,Letter,2023-09-05T04:00:00Z,2023,9,,,2023-09-05T15:04:10Z,,0,0,090000648497825f EPA-HQ-OAR-2003-0177-0150,EPA,EPA-HQ-OAR-2003-0177,Ltr/EPA/R. Lee to D. Moniak re: Blue Ridge Environmental Defense League's (BREDL) comments and request for extension of public comment period for inspection EPA-SRS-12.01-8 [A-98-49-II-A3-30],Supporting & Related Material,Letter,2023-09-05T04:00:00Z,2023,9,,,2023-09-05T15:04:03Z,,0,0,0900006484978253 EPA-HQ-OAR-2003-0177-0152,EPA,EPA-HQ-OAR-2003-0177,Correspondence between EPA/F. Marcinowski and DOE/I. Triay Regarding and conclusions from EPA-RFETS-5.01-8 [A-98-49-II-A3-32],Supporting & Related Material,Letter,2023-09-05T04:00:00Z,2023,9,,,2023-09-05T15:04:04Z,,0,0,0900006484978255 EPA-HQ-OAR-2003-0177-0165,EPA,EPA-HQ-OAR-2003-0177,"Ltr/EPA/S. Page to DOE/I. Triay Transmitting EPA Report for Inspection No. EPA-NTS-6.99-8, June 7-11, 1999 [A-98-49-II-A4-9]",Supporting & Related Material,Letter,2023-09-05T04:00:00Z,2023,9,,,2023-09-05T15:04:13Z,,0,0,0900006484978263 EPA-HQ-OAR-2003-0177-0159,EPA,EPA-HQ-OAR-2003-0177,"Ltr/EPA/S. Pa ge to DOE/CAO/K. Klein Transmitting EPA Inspection Report No. EPA-RFETS-6.98-8 of the Inspection of the Rocky Flats Environmental Technology Site, June 22-25, 1998 [A-98-49-II-A4-3]",Supporting & Related Material,Letter,2023-09-05T04:00:00Z,2023,9,,,2023-09-05T15:04:09Z,,0,0,090000648497825d EPA-HQ-OAR-2003-0177-0163,EPA,EPA-HQ-OAR-2003-0177,"Ltr/EPA/S. Page to DOE/I. Triay Transmitting Report for EPA Inspection No. EPA-LANL-6.99-8, Report of Los Alamos National Laboratory, June 14-18, 1999 [A-98-49-II-A4-7]",Supporting & Related Material,Letter,2023-09-05T04:00:00Z,2023,9,,,2023-09-05T15:04:12Z,,0,0,0900006484978261 EPA-HQ-OAR-2003-0177-0138,EPA,EPA-HQ-OAR-2003-0177,"Ltr/EPA/F. Marcinowski to DOE/I. Triay, Transmitting Report for Inspection No. EPA-SNL-11.02-22 [A-98-49-II-A1-42]",Supporting & Related Material,Letter,2023-08-28T04:00:00Z,2023,8,,,2023-08-28T15:32:46Z,,0,0,09000064849781fc EPA-HQ-OAR-2003-0177-0131,EPA,EPA-HQ-OAR-2003-0177,"Ltr/EPA/F. Marcinowski to DOE/I. Triay, Transmitting Report for Inspection No. EPA-CBFO-2.02-22 [A-98-49-II-A1-35]",Supporting & Related Material,Letter,2023-08-28T04:00:00Z,2023,8,,,2023-08-28T15:32:41Z,,0,0,09000064849781f5 EPA-HQ-OAR-2003-0177-0137,EPA,EPA-HQ-OAR-2003-0177,"Ltr/EPA/F. Marcinowski to DOE/I. Triay, Transmitting Report for Inspection No. EPA-SRS-CCP-10.02-22 [A-98-49-II-A1-41]",Supporting & Related Material,Letter,2023-08-28T04:00:00Z,2023,8,,,2023-08-28T15:32:46Z,,0,0,09000064849781fb EPA-HQ-OAR-2003-0177-0143,EPA,EPA-HQ-OAR-2003-0177,"Ltr/EP A/F. Marcinowski to DOE/I. Triay, Transmitting Report for Inspection No. EPA-CBFO-2.03-22 [A-98-49-II-A1-48]",Supporting & Related Material,Letter,2023-08-28T04:00:00Z,2023,8,,,2023-08-28T15:32:50Z,,0,0,0900006484978201 EPA-HQ-OAR-2003-0177-0127,EPA,EPA-HQ-OAR-2003-0177,"Notes of Technical Meeting with DOE/CBFO, November 28-29, 2001 [A-98-49-II-A1-31]",Supporting & Related Material,Meeting Materials,2023-08-28T04:00:00Z,2023,8,,,2023-08-28T15:32:37Z,,0,0,09000064849781f1 EPA-HQ-OAR-2003-0177-0136,EPA,EPA-HQ-OAR-2003-0177,"Ltr/EPA/F. Marcinowski to DOE/I. Triay, Transmitting Reports for Inspection No's. EPA-ANL-E-CCP-9.02-22 & EPA-NTS-CCP-9.02-22 [A-98-49-II-A1-40]",Supporting & Related Material,Letter,2023-08-28T04:00:00Z,2023,8,,,2023-08-28T15:32:45Z,,0,0,09000064849781fa EPA-HQ-OAR-2003-0177-0146,EPA,EPA-HQ-OAR-2003-0177,"Ltr/EPA/F. Marcinowski to DOE/I. Triay, Transmitting Report for Inspection No. EPA-WTS-8.03-22 [A-98-49-II-A1-51]",Supporting & Related Material,Letter,2023-08-28T04:00:00Z,2023,8,,,2023-08-28T15:32:53Z,,0,0,0900006484978204 EPA-HQ-OAR-2003-0177-0128,EPA,EPA-HQ-OAR-2003-0177,"Ltr/EPA/F. Marcinowski to DOE/I. Triay, Transmitting Report for Inspection No. EPA - SRS - 12.01-22 [A-98-49-II-A1-32]",Supporting & Related Material,Letter,2023-08-28T04:00:00Z,2023,8,,,2023-08-28T15:32:38Z,,0,0,09000064849781f2 EPA-HQ-OAR-2003-0177-0133,EPA,EPA-HQ-OAR-2003-0177,"Ltr/EPA/F. Marcinowski to DOE/I. Triay, Transmitting Reports for Inspection No.'s: EPA-RFETS-2.02-22, EPA-HAN-6.02-22, and EPAWTS -7.02-22 [A-98-49-II-A1-37]",Supporting & Related Material,Letter,2023-08-28T04:00:00Z,2023,8,,,2023-08-28T15:32:42Z,,0,0,09000064849781f7 EPA-HQ-OAR-2003-0177-0135,EPA,EPA-HQ-OAR-2003-0177,"Ltr/EPA/F. Marcinowski to DOE/I. Triay, Transmitting Report for Inspection No. EPA-CBFO-5.02-22 [A-98-49-II-A1-39]",Supporting & Related Material,Letter,2023-08-28T04:00:00Z,2023,8,,,2023-08-28T15:32:44Z,,0,0,09000064849781f9 EPA-HQ-OAR-2003-0177-0129,EPA,EPA-HQ-OAR-2003-0177,"Ltr/EPA/F. Marcinowski to DOE/I. Triay, Transmitting Report for Inspection No. EPA - CBFO - 1.02-22 [A-98-49-II-A1-33]",Supporting & Related Material,Letter,2023-08-28T04:00:00Z,2023,8,,,2023-08-28T15:32:39Z,,0,0,09000064849781f3 EPA-HQ-OAR-2003-0177-0132,EPA,EPA-HQ-OAR-2003-0177,"Ltr/EPA/F. Marcinowski to DOE/I. Triay, Transmitting Report for Inspection No. EPA-INEEL-8.02-22 [A-98-49-II-A1-36]",Supporting & Related Material,Letter,2023-08-28T04:00:00Z,2023,8,,,2023-08-28T15:32:41Z,,0,0,09000064849781f6 EPA-HQ-OAR-2003-0177-0134,EPA,EPA-HQ-OAR-2003-0177,"Ltr/EPA/F. Marcinowski to DOE/I. Triay, Transmitting Report for Inspection No. EPA-LANL-8.02-22 [A-98-49-II-A1-38]",Supporting & Related Material,Letter,2023-08-28T04:00:00Z,2023,8,,,2023-08-28T15:32:43Z,,0,0,09000064849781f8 EPA-HQ-OAR-2003-0177-0142,EPA,EPA-HQ-OAR-2003-0177,"Ltr/EPA/F. Marcinowski to DOE/I. Triay, transmitting report for inspection no. EPA-RFETS-3.03-22 [A-98-49-II-A1-47]",Supporting & Related Material,Letter,2023-08-28T04:00:00Z,2023,8,,,2023-08-28T15:32:49Z,,0,0,0900006484978200 EPA-HQ-OAR-2003-0177-0144,EPA,EPA-HQ-OAR-2003-0177,"Ltr/EPA/F. Marcinowski to DOE/I. Triay, Transmitting Report for Inspection No. EPA-SNL-5.03-22 [A-98-49-II-A1-49]",Supporting & Related Material,Letter,2023-08-28T04:00:00Z,2023,8,,,2023-08-28T15:32:51Z,,0,0,0900006484978202 EPA-HQ-OAR-2003-0177-0139,EPA,EPA-HQ-OAR-2003-0177,"Ltr/EPA/F. Marcinowski to DOE/I. Triay, Transmitting Checklist and Results re: CBFO/WIPP/SNL Inspection to Verify Correctional Progress on Finding (l 0-11/2001) related to Inadequate Core Handling and Storage [A-98-49-II-A1-43]",Supporting & Related Material,Letter,2023-08-28T04:00:00Z,2023,8,,,2023-08-28T15:32:47Z,,0,0,09000064849781fd