id,agency_id,docket_id,title,document_type,subtype,posted_date,posted_year,posted_month,comment_start_date,comment_end_date,last_modified,fr_doc_num,open_for_comment,withdrawn,object_id BSEE-2015-0002-0207,BSEE,BSEE-2015-0002,AA11 EA with signed FONSI (4-12-16),Supporting & Related Material,,2016-05-09T04:00:00Z,2016,5,,,2016-05-10T00:31:42Z,,0,0,0900006481fb7929 BSEE-2015-0002-0208,BSEE,BSEE-2015-0002,AA11 RIA.BSEE Well Control RIA,Supporting & Related Material,,2016-05-09T04:00:00Z,2016,5,,,2016-05-10T00:31:47Z,,0,0,0900006481fb7928 BSEE-2015-0002-0206,BSEE,BSEE-2015-0002,Oil and Gas and Sulfur Operations in the Outer Continental Shelf; Blowout Preventer Systems and Well Control,Rule,,2016-04-29T04:00:00Z,2016,4,2016-04-29T04:00:00Z,,2016-04-29T15:17:59Z,2016-08921,0,0,0900006481f980e0 BSEE-2015-0002-0061,BSEE,BSEE-2015-0002,Oil and Gas and Sulphur Operations: Oil and Gas and Sulphur Operations in the Outer Continental Shelf; Blowout Preventer Systems and Well Control,Proposed Rule,,2015-06-03T04:00:00Z,2015,6,,,2015-11-03T02:30:24Z,2015-13499,0,0,0900006481b17aed BSEE-2015-0002-0003,BSEE,BSEE-2015-0002,BOP_Draft_EAclean.4.9.15 FINAL,Supporting & Related Material,,2015-04-17T04:00:00Z,2015,4,,,2015-04-18T00:40:39Z,,0,0,0900006481aaa984 BSEE-2015-0002-0001,BSEE,BSEE-2015-0002,Oil and Gas and Sulphur Operations in the Outer Continental Shelf; Blowout Preventer Systems and Well Control,Proposed Rule,,2015-04-17T04:00:00Z,2015,4,2015-04-17T04:00:00Z,2015-07-17T03:59:59Z,2016-07-19T13:00:13Z,2015-08587,0,0,0900006481aab778 BSEE-2015-0002-0002,BSEE,BSEE-2015-0002,BSEE BOP-Well Control NPRM RIA 04-09-14,Supporting & Related Material,,2015-04-17T04:00:00Z,2015,4,,,2015-04-21T19:20:04Z,,0,0,0900006481aaa983