dockets: EPA-HQ-OAR-2013-0684
Data license: Public Domain (U.S. Government data) · Data source: Federal Register API & Regulations.gov API
This data as json
| id | agency_id | title | docket_type | last_modified | object_id | rin | dkabstract | category | subtype | keywords | program | short_title | effective_date | organization | attrs_raw | attr_source |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| EPA-HQ-OAR-2013-0684 | EPA | Criteria for the Certification and Recertification of the Waste Isolation Pilot Plant's Compliance with the Disposal Regulations; Panel Closure Redesign | Rulemaking | 2022-04-01T01:02:34Z | 0b000064814009bc | Not Assigned | This rule proposes to modify Appendix A, Condition 1 of 40 CFR 194, “Criteria for the Certification and Re-certification of the Waste Isolation Pilot Plant’s Compliance with the 40 CFR Part 191 Disposal Regulations,” which currently requires that DOE use the Option D Panel Closure, described in DOE’s 1996 Compliance Certification Application, to seal filled waste panels in the repository. On September 28, 2011, the U.S. Department of Energy (DOE) submitted a request to replace the concrete monolith and mortared explosion wall with an alternative design consisting of steel bulkheads and mined rock salt backfill. Analyses indicate that new design will meet performance requirements while reducing costs and impacts on waste emplacement activities. | ["Waste Isolation Pilot Plant", "WIPP, Certification Decision", "CCA, Panel Closure", "Panel Closure Design"] | WIPP Certification Decision – Revisions to the Panel Closure Design (Condition 1) | {"displayProperties": [{"name": "generic", "label": "Location", "tooltip": "Agency specific program associated with a docket (regulatory action); equivalents: Bureau, Docket Item Code, Program Area."}, {"name": "shortTitle", "label": "Short Title", "tooltip": "A combination of letters and or numbers assigned to an agency's regulatory action for purposes of brevity."}], "keywords": ["Waste Isolation Pilot Plant", "WIPP, Certification Decision", "CCA, Panel Closure", "Panel Closure Design"], "modifyDate": "2022-04-01T01:02:34Z", "dkAbstract": "This rule proposes to modify Appendix A, Condition 1 of 40 CFR 194, \u201cCriteria for the Certification and Re-certification of the Waste Isolation Pilot Plant\u2019s Compliance with the 40 CFR Part 191 Disposal Regulations,\u201d which currently requires that DOE use the Option D Panel Closure, described in DOE\u2019s 1996 Compliance Certification Application, to seal filled waste panels in the repository. On September 28, 2011, the U.S. Department of Energy (DOE) submitted a request to replace the concrete monolith and mortared explosion wall with an alternative design consisting of steel bulkheads and mined rock salt backfill. Analyses indicate that new design will meet performance requirements while reducing costs and impacts on waste emplacement activities.", "agencyId": "EPA", "program": null, "shortTitle": "WIPP Certification Decision \u2013 Revisions to the Panel Closure Design (Condition 1)", "subType2": null, "title": "Criteria for the Certification and Recertification of the Waste Isolation Pilot Plant's Compliance with the Disposal Regulations; Panel Closure Redesign", "generic": "HQ-OAR", "field1": null, "docketType": "Rulemaking", "petitionNbr": null, "rin": "Not Assigned", "organization": null, "legacyId": null, "subType": null, "category": null, "field2": null, "effectiveDate": null, "objectId": "0b000064814009bc"} | single_get |
Links from other tables
- 40 rows from docket_id in documents