home / openregs / cfr_sections

cfr_sections: 40:40:31.0.1.1.6.14.1.8

Current Code of Federal Regulations (eCFR) — the actual text of federal regulations in force. Covers 19 CFR titles with 123,000+ regulatory sections and full-text search.

Data license: Public Domain (U.S. Government data) · Data source: Federal Register API & Regulations.gov API

This data as json

section_id title_number title_name chapter subchapter part_number part_name subpart subpart_name section_number section_heading agency authority source_citation amendment_citations full_text
40:40:31.0.1.1.6.14.1.8 40 Protection of Environment I I 265 PART 265—INTERIM STATUS STANDARDS FOR OWNERS AND OPERATORS OF HAZARDOUS WASTE TREATMENT, STORAGE, AND DISPOSAL FACILITIES N Subpart N—Landfills 265.310 § 265.310 Closure and post-closure care. EPA 42 U.S.C. 6905, 6906, 6912, 6922, 6923, 6924, 6925, 6935, 6936, 6937, and 6939g. 51 FR 25479, July 14, 1986, unless otherwise noted. [50 FR 16048, Apr. 23, 1985, as amended at 57 FR 3495, Jan. 29, 1992] (a) At final closure of the landfill or upon closure of any cell, the owner or operator must cover the landfill or cell with a final cover designed and constructed to: (1) Provide long-term minimization of migration of liquids through the closed landfill; (2) Function with minimum maintenance; (3) Promote drainage and minimize erosion or abrasion of the cover; (4) Accommodate settling and subsidence so that the cover's integrity is maintained; and (5) Have a permeability less than or equal to the permeability of any bottom liner system or natural subsoils present. (b) After final closure, the owner or operator must comply with all post-closure requirements contained in §§ 265.117 through 265.120 including maintenance and monitoring throughout the post-closure care period. The owner or operator must: (1) Maintain the integrity and effectiveness of the final cover, including making repairs to the cover as necessary to correct the effects of settling, subsidence, erosion, or other events; (2) Maintain and monitor the leak detection system in accordance with §§ 264.301(c)(3)(iv) and (4) of this chapter and 265.304(b), and comply with all other applicable leak detection system requirements of this part; (3) Maintain and monitor the ground-water monitoring system and comply with all other applicable requirements of subpart F of this part; (4) Prevent run-on and run-off from eroding or otherwise damaging the final cover; and (5) Protect and maintain surveyed benchmarks used in complying with § 265.309.
Powered by Datasette · Queries took 0.381ms · Data license: Public Domain (U.S. Government data) · Data source: Federal Register API & Regulations.gov API · Privacy